Skip to main content
WireAndSun
Calculators
EIA-861 Grid Reliability & Net Metering

Alameda Municipal Power (CA) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

Alameda Municipal Power (EIA ID 207, CA) serves 32,364 customers at 24.01 c/kWh (-7.34 c/kWh vs California average) with 9.0 min/yr SAIDI (0.15 hrs/yr) with 1,235 net-metered residential solar systems (3.82% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
207
Res. Rate
24.01 c/kWh
SAIDI (All Events)
9.0 min/yr
Net-Metered PV
1,235 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does Alameda Municipal Power Compare on Tariffs and Reliability?

EIA-861 rate delta (-7.34 c/kWh vs California average), customer scale (32,364), and 2026 solar payback benchmarks for Alameda Municipal Power.

Ranked #1,885 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 5.2% of peers), Alameda Municipal Power serves 32,364 accounts in California (Municipal). Commercial power averages 20.29 c/kWh. It recorded 9.0 SAIDI outage minutes (0.15 hrs/yr, rank #10 of 751 reporting utilities), with 1,235 net-metered residential solar systems (3.82% customer adoption).

Where Does Alameda Municipal Power Sit Across US Utility Rates?

Positions Alameda Municipal Power (24.01 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Alameda Municipal Power Residential Tariff vs 1,989 US UtilitiesPositions Alameda Municipal Power's 24.01 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhAlameda Municipal : 24.01 c

How Does Alameda Municipal Power Rank Across Cost & Reliability?

Percentile placement of Alameda Municipal Power across retail kWh electricity cost and IEEE grid reliability outage metrics. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Alameda Municipal Power Grid & Tariff BenchmarksShows where Alameda Municipal Power ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate24.01 c/kWhAnnual SAIDI9.0 min/yr

What Do EIA-861 Benchmarks Show for Alameda Municipal Power?

Four key EIA-861 rate, outage, and solar payback benchmarks for Alameda Municipal Power (Municipal) in California. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Lowest Rate #1,885 / 1,989

24.01 c/kWh (-7.34 vs CA)

Commercial avg: 20.29 c/kWh; est. residential bill $86.77/mo.

Reliability #10 / 751

9.0 min/yr (0.15 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 170.7 min (~5.1 kWh @ 1.8 kW).

Post-25D Payback

9.1 Years @ 24.01 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,593/yr at 1,350 kWh/kW.

Distributed PV

1,235 Net-Metered Systems

5.246 MW residential PV (3.82% of customers) across 1 county; state FEMA declarations (2015-2026): 161.

Alameda Municipal Power Reliability & Solar Offset Calculation

Backup_Energy = (170.7 min / 60) * 1.8 kW = 5.1 kWh/event | Solar_Offset = 10,800 kWh * $0.2401 = $2,593/yr

EIA-861 2025 Utility ID 207: Rate=24.01 c/kWh, Cust=32,364, SAIDI=9.0 min, PV=1,235.

Result: 0.15 outage hrs/yr; 9.1 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for Alameda Municipal Power?

Complete Form EIA-861 filing summary for Alameda Municipal Power (ID 207) covering sales, PV, and counties. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for Alameda Municipal Power (Utility ID 207).
EIA Utility ID & BA CodeID 207 · CISO
State & Ownership TypeCA · Municipal
Retail Electricity Rates24.01 c/kWh Res · 20.29 c Comm
Avg Monthly Usage & Bill361.4 kWh/mo ($86.77/mo est.)
SAIDI (All Events w/ MED)9.0 min/yr (0.15 hrs/yr)
SAIDI (Without Major Events)9.0 min/yr (Storm share: 0.0%)
SAIFI & CAIDI (Per-Outage Avg)0.053 /yr · 170.7 min restore
Residential Net-Metered PV1,235 systems (5.246 MW)
Counties Served (Sample)1 county (Alameda)

Which Peer Electric Utilities Operate in CA?

Compare Alameda Municipal Power directly with Santa Barbara Clean Energy and nearby California electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Santa Barbara Clean Energy 15.35 c — 0 32,190
PacifiCorp 24.18 c 484.7 min 995 36,339
Desert Community Energy 18.07 c — 0 27,896
Pomona Choice Energy (PCE) 16.29 c — 0 37,045
What to Check & Best-Fit Scenarios

What Should Alameda Municipal Power Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Alameda Municipal Power (Municipal, CA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • Annual snapshot caveat: Alameda Municipal Power (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in CA.
  • Export credit rules: check Alameda Municipal Power's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

Alameda Municipal Power Solar & Battery Evaluators

Compare your actual Alameda Municipal Power monthly kWh statement against 24.01 c/kWh and verify current export tariffs in CA.

Alameda Municipal Power Outage & Generator Planners

Use Alameda Municipal Power's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Alameda Municipal Power (California) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

What is Alameda Municipal Power's residential electricity rate and 2026 solar payback?

Alameda Municipal Power averages 24.01 c/kWh (-7.34 c/kWh vs California average vs. California). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,593/yr (9.1-year payback).

How reliable is Alameda Municipal Power compared to peer California utilities?

Alameda Municipal Power recorded 9.0 SAIDI outage minutes (0.15 hrs/yr, rank #10 of 751 reporting utilities); compare rates and outage history directly with Santa Barbara Clean Energy (15.35 c/kWh) across California.

Which counties and customers does Alameda Municipal Power serve in California?

EIA-861 filings list 32,364 customers across 1 county including Alameda, with 1,235 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Alameda Municipal Power.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.