Electrical Dist No2 Pinal County (EIA ID 15048, AZ) serves 5,592 customers at 13.32 c/kWh (-1.94 c/kWh vs Arizona average) with 141.1 min/yr SAIDI (2.35 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.
- EIA Utility ID
- 15048
- Res. Rate
- 13.32 c/kWh
- SAIDI (All Events)
- 141.1 min/yr
- Net-Metered PV
- Unreported
How Does Electrical Dist No2 Pinal County Compare on Tariffs and Reliability?
EIA-861 rate delta (-1.94 c/kWh vs Arizona average), customer scale (5,592), and 2026 solar payback benchmarks for Electrical Dist No2 Pinal County.
Serving 5,592 customers across 1 county including Pinal in Arizona, Electrical Dist No2 Pinal County (Political Subdivision, Balancing Authority WALC) bills residential power at 13.32 c/kWh (-1.94 c/kWh vs Arizona average vs. Arizona), offsetting ~$1,439/yr on an 8 kW array. Grid filings show the utility recorded 141.1 SAIDI outage minutes (2.35 hrs/yr, rank #318 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.
Where Does Electrical Dist No2 Pinal County Sit Across US Utility Rates?
Positions Electrical Dist No2 Pinal County (13.32 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.
How Does Electrical Dist No2 Pinal County Rank Across Cost & Reliability?
Percentile placement of Electrical Dist No2 Pinal County across retail kWh electricity cost and IEEE grid reliability outage metrics.
What Do EIA-861 Benchmarks Show for Electrical Dist No2 Pinal County?
Four key EIA-861 rate, outage, and solar payback benchmarks for Electrical Dist No2 Pinal County (Political Subdivision) in Arizona.
13.32 c/kWh (-1.94 vs AZ)
Commercial avg: 8.6 c/kWh; Industrial: 11.44 c/kWh; est. residential bill $130.62/mo.
141.1 min/yr (2.35 hrs)
18.5% (26.1 min) from Major Event Days; avg restore 85.5 min (~2.6 kWh @ 1.8 kW).
16.4 Years @ 13.32 c/kWh
8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,439/yr at 1,350 kWh/kW.
5,592 Customers · 1 County
Serves 1 county including Pinal in Arizona; state FEMA declarations (2015-2026): 43.
Electrical Dist No2 Pinal County Reliability & Solar Offset Calculation
Backup_Energy = (85.5 min / 60) * 1.8 kW = 2.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1332 = $1,439/yr
EIA-861 2025 Utility ID 15048: Rate=13.32 c/kWh, Cust=5,592, SAIDI=141.1 min.
Result: 2.35 outage hrs/yr; 16.4 yr 8 kW cash payback (0% 25D).
What Are the EIA-861 Filing Metrics for Electrical Dist No2 Pinal County?
Complete Form EIA-861 filing summary for Electrical Dist No2 Pinal County (ID 15048) covering sales, PV, and counties.
| EIA Utility ID & BA Code | ID 15048 · WALC |
|---|---|
| State & Ownership Type | AZ · Political Subdivision |
| Retail Electricity Rates | 13.32 c/kWh Res · 8.6 c Comm · 11.44 c Ind |
| Avg Monthly Usage & Bill | 980.5 kWh/mo ($130.62/mo est.) |
| SAIDI (All Events w/ MED) | 141.1 min/yr (2.35 hrs/yr) |
| SAIDI (Without Major Events) | 115.0 min/yr (Storm share: 18.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.65 /yr · 85.5 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Pinal) |
Which Peer Electric Utilities Operate in AZ?
Compare Electrical Dist No2 Pinal County directly with Spruce Finance and nearby Arizona electric utilities by customer base.
| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| Spruce Finance | 10.94 c | — | 0 | 3,606 |
| SunPower Capital, LLC | 16.76 c | — | 0 | 8,083 |
| Dixie Escalante R E A, Inc | 10.25 c | 99.4 min | 10 | 2,821 |
| Gila River Indian Utility Authority (GRICUA) | 14.27 c | 263.8 min | 0 | 2,707 |
What Should Electrical Dist No2 Pinal County Customers Check Beyond Historical EIA-861 Averages?
Form EIA-861 data for Electrical Dist No2 Pinal County (Political Subdivision, AZ) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.
- Tariff structure differs: Electrical Dist No2 Pinal County's 13.32 c/kWh blended residential rate in AZ does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Electrical Dist No2 Pinal County system-wide SAIDI averages rural and urban circuits across its AZ territory or nearby Spruce Finance.
Electrical Dist No2 Pinal County Solar & Battery Evaluators
Compare your actual Electrical Dist No2 Pinal County monthly kWh statement against 13.32 c/kWh and verify current export tariffs in AZ.
Electrical Dist No2 Pinal County Outage & Generator Planners
Use Electrical Dist No2 Pinal County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers for Electrical Dist No2 Pinal County (Arizona) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.
What is Electrical Dist No2 Pinal County's residential electricity rate and 2026 solar payback?
Electrical Dist No2 Pinal County averages 13.32 c/kWh (-1.94 c/kWh vs Arizona average vs. Arizona). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,439/yr (16.4-year payback).
How reliable is Electrical Dist No2 Pinal County compared to peer Arizona utilities?
Electrical Dist No2 Pinal County recorded 141.1 SAIDI outage minutes (2.35 hrs/yr, rank #318 of 751 reporting utilities); compare rates and outage history directly with Spruce Finance (10.94 c/kWh) across Arizona.
Which counties and customers does Electrical Dist No2 Pinal County serve in Arizona?
EIA-861 filings list 5,592 customers across 1 county including Pinal, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Electrical Dist No2 Pinal County.
Sources
- Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
- Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)