First Electric Coop Corp (AR) — Grid Reliability & Solar Data

Filing: Form EIA-861 (2025 Release) Verified: 2026-11-26

First Electric Coop Corp (EIA ID 6342, AR) serves 96,685 customers at 12.93 c/kWh (+0.06 c/kWh vs Arkansas average) with 646.1 min/yr SAIDI (10.77 hrs/yr) with 1,926 net-metered residential solar systems (1.99% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

EIA Utility ID
6342
Res. Rate
12.93 c/kWh
SAIDI (All Events)
646.1 min/yr
Net-Metered PV
1,926 systems
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk
Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

How Does First Electric Coop Corp Compare on Tariffs and Reliability?

EIA-861 rate delta (+0.06 c/kWh vs Arkansas average), customer scale (96,685), and 2026 solar payback benchmarks for First Electric Coop Corp.

Ranked #634 of 1,989 reporting US utilities for residential rate (top 32.0%; lower than 68.0% of peers), First Electric Coop Corp serves 96,685 accounts in Arkansas (Cooperative). Commercial power averages 19.57 c/kWh. It logged 646.1 SAIDI outage minutes (10.77 hrs/yr, 65.6% storm-driven), making battery backup or a standby ATS worthwhile, with 1,926 net-metered residential solar systems (1.99% customer adoption).

Where Does First Electric Coop Corp Sit Across US Utility Rates?

Positions First Electric Coop Corp (12.93 c/kWh) across 1,989 US electric utility residential tariffs. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

First Electric Coop Corp Residential Tariff vs 1,989 US UtilitiesPositions First Electric Coop Corp's 12.93 c/kWh rate across reporting EIA-861 utilities. 3-6 c/kWh: 11 entries36-10 c/kWh: 100 entries10-13 c/kWh: 501 entries13-16 c/kWh: 808 entries1316-19 c/kWh: 320 entries19-23 c/kWh: 115 entries23-26 c/kWh: 60 entries2326-29 c/kWh: 27 entries29-32 c/kWh: 20 entries32-36 c/kWh: 7 entries3236-39 c/kWh: 6 entries39-42 c/kWh: 10 entries39Median 18.5 c/kWhFirst Electric Coo: 12.93 c

How Does First Electric Coop Corp Rank Across Cost & Reliability?

Percentile placement of First Electric Coop Corp across retail kWh electricity cost and IEEE grid reliability outage metrics.

First Electric Coop Corp Grid & Tariff BenchmarksShows where First Electric Coop Corp ranks on residential rate, SAIDI, and storm exposure. 0% (Low)50% Median100% (Top)Residential Rate12.93 c/kWhAnnual SAIDI646.1 min/yrMajor-Storm Share65.6%

What Do EIA-861 Benchmarks Show for First Electric Coop Corp?

Four key EIA-861 rate, outage, and solar payback benchmarks for First Electric Coop Corp (Cooperative) in Arkansas. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Lowest Rate #634 / 1,989

12.93 c/kWh (+0.06 vs AR)

Commercial avg: 19.57 c/kWh; Industrial: 8.27 c/kWh; est. residential bill $155.38/mo.

Reliability #668 / 751

646.1 min/yr (10.77 hrs)

65.6% (424.1 min) from Major Event Days; avg restore 254.6 min (~7.6 kWh @ 1.8 kW).

Post-25D Payback

16.9 Years @ 12.93 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,396/yr at 1,350 kWh/kW.

Distributed PV

1,926 Net-Metered Systems

17.754 MW residential PV (1.99% of customers) across 17 counties; state FEMA declarations (2015-2026): 23.

First Electric Coop Corp Reliability & Solar Offset Calculation

Backup_Energy = (254.6 min / 60) * 1.8 kW = 7.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1293 = $1,396/yr

EIA-861 2025 Utility ID 6342: Rate=12.93 c/kWh, Cust=96,685, SAIDI=646.1 min, PV=1,926.

Result: 10.77 outage hrs/yr; 16.9 yr 8 kW cash payback (0% 25D).

What Are the EIA-861 Filing Metrics for First Electric Coop Corp?

Complete Form EIA-861 filing summary for First Electric Coop Corp (ID 6342) covering sales, PV, and counties. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for First Electric Coop Corp (Utility ID 6342).
EIA Utility ID & BA CodeID 6342 · MISO
State & Ownership TypeAR · Cooperative
Retail Electricity Rates12.93 c/kWh Res · 19.57 c Comm · 8.27 c Ind
Avg Monthly Usage & Bill1,202.0 kWh/mo ($155.38/mo est.)
SAIDI (All Events w/ MED)646.1 min/yr (10.77 hrs/yr)
SAIDI (Without Major Events)222.0 min/yr (Storm share: 65.6%)
SAIFI & CAIDI (Per-Outage Avg)2.538 /yr · 254.6 min restore
Residential Net-Metered PV1,926 systems (17.754 MW)
Counties Served (Sample)17 counties (Arkansas, Cleburne, Conway, Faulkner, Garland, Grant, Independence, Jefferson, Lonoke, Monroe)

Which Peer Electric Utilities Operate in AR?

Compare First Electric Coop Corp directly with Carroll Electric Coop Corp - (AR) and nearby Arkansas electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.
UtilityRes RateSAIDIRes PVCustomers
Carroll Electric Coop Corp - (AR) 13.4 c 224.0 min 2,306 104,579
Southwestern Electric Power Co 12.14 c 427.6 min 1,559 109,777
Ozarks Electric Coop Corp - (AR) 13.73 c 675.9 min 1,738 74,247
Oklahoma Gas & Electric Co 11.65 c — 705 58,569
What to Check & Best-Fit Scenarios

What Should First Electric Coop Corp Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for First Electric Coop Corp (Cooperative, AR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

  • ERCOT / retail choice note or local riders: confirm whether First Electric Coop Corp acts as a wires-only TDU or bundled utility in AR.
  • Transformer limits: First Electric Coop Corp interconnection engineering still checks neighborhood transformer kVA regardless of 646.1 SAIDI.

First Electric Coop Corp Solar & Battery Evaluators

Compare your actual First Electric Coop Corp monthly kWh statement against 12.93 c/kWh and verify current export tariffs in AR.

First Electric Coop Corp Outage & Generator Planners

Use First Electric Coop Corp's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for First Electric Coop Corp (Arkansas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

What is First Electric Coop Corp's residential electricity rate and 2026 solar payback?

First Electric Coop Corp averages 12.93 c/kWh (+0.06 c/kWh vs Arkansas average vs. Arkansas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,396/yr (16.9-year payback).

How reliable is First Electric Coop Corp compared to peer Arkansas utilities?

First Electric Coop Corp logged 646.1 SAIDI outage minutes (10.77 hrs/yr, 65.6% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Carroll Electric Coop Corp - (AR) (13.4 c/kWh) across Arkansas.

Which counties and customers does First Electric Coop Corp serve in Arkansas?

EIA-861 filings list 96,685 customers across 17 counties including Arkansas, Cleburne, Conway, with 1,926 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting First Electric Coop Corp.

Sources

  1. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  2. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  3. Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.