Skip to main content
WireAndSun
Calculators
CEC Brand Hub

GAF — CEC Certified Solar Equipment Catalog

Registry: California Energy Commission (CEC) Verified: 2026-11-26

GAF holds 1 verified California Energy Commission (CEC) certifications including 1 module series (150W PV). GAF carries 1 module series ranging from 150 W to 150 W STC (median 150 W vs 385 W CEC fleet median; 13.8% median aperture efficiency, cell architecture Thin Film). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Manufacturer
GAF
PV Module Series
1
Listed Inverters
0
Output Range
150W PV
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit
Wall-mounted residential hybrid solar inverter and modular battery cabinet piped with galvanized EMT conduit

How Do GAF Solar Specifications Compare Across the CEC Catalog?

Detailed California Energy Commission portfolio breakdown covering nameplate power spread, cell technology, thermal efficiency, and CPSC recall screening for GAF.

GAF participates in the California Energy Commission (CEC) Solar Equipment List with 1 total certified hardware listings. GAF carries 1 module series ranging from 150 W to 150 W STC (median 150 W vs 385 W CEC fleet median; 13.8% median aperture efficiency, cell architecture Thin Film). No active CPSC electrical recalls match GAF in our federal recall archive as of 2026.

Which GAF PV Module Series Are CEC Certified? (1)

Certified GAF PV module specifications below include exact variant counts so installers can match permitted plan sets to CEC datasheets.

Deduplicated CEC photovoltaic module series for GAF.
Module Series STC (W) PTC (W) Voc (V) Eff (%) Variants
GAF RIAC 1000 150.0 139.2 62.5 13.81 1
What to Check & Best-Fit Scenarios

What Are the Design Limits and Best-Fit Uses for GAF Solar Hardware?

Evaluate GAF CEC certifications (150W PV), winter voltage limits, and main panel 120% backfeed constraints before finalizing your equipment contract.

  • GAF certifies only photovoltaic modules on this CEC list; installers must pair them with a separate UL 1741 SA/SB grid-support inverter verified for NEC 690.7 winter Voc.
  • Constrained roofs: GAF's median module aperture efficiency (13.8%) sits below the 19.91% CEC fleet median, requiring slightly more square feet per kilowatt.

GAF Module + Third-Party Inverter

Pair GAF modules (150W PV) with microinverters or string inverters rated above local cold-weather Voc.

Unshaded Roofs & Ground Mounts

Focus on dollar-per-watt cash bids below $2.95/W since Section 25D residential tax credits expired after 2025.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Permitting and engineering takeaways specific to GAF photovoltaic and inverter hardware listed on the CEC registry. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

How many GAF solar models are verified on the CEC list?

Our CEC archive indexes 1 GAF equipment records (1 module series and 0 inverter models) spanning 150W PV. Check local building department permit requirements for Gaf before finalizing component orders.

What should homeowners check before approving GAF equipment on a solar quote?

Verify the exact CEC model string on your utility interconnection form, confirm cold-weather NEC 690.7 string Voc stays below inverter Vdcmax, and verify NEC 705.12 120% busbar capacity on your main breaker panel.

How efficient are GAF solar panels compared to CEC averages?

Across listed series, GAF modules show a median aperture efficiency of 13.8% versus 19.91% across all certified CEC photovoltaic panels. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Gaf.

Sources

  1. CEC Solar Equipment List — PV Modules (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  2. CEC Solar Equipment List — Grid-Support Inverters (NREL SAM Distribution) — California Energy Commission / NREL SAM, 2026-Q4 SAM Develop (retrieved 2026-11-23)
  3. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
  4. CPSC SaferProducts Recall Database (Panels, Breakers, Generators, Solar) — U.S. Consumer Product Safety Commission (CPSC), 2026-11 (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.