Under NEC Table 310.16 at 75 C terminal ratings, a 100 A subpanel feeder requires 3 AWG copper THHN/XHHW (100 A) or 1 AWG aluminum SER/XHHW (100 A). Do NOT apply the 83% residential service reduction (4 AWG Cu / 2 AWG Al) unless the feeder carries 100% of the entire dwelling load, and always wire subpanels with 4 conductors keeping neutral isolated from the ground bar.
- 75C Copper Feeder
- 3 AWG Cu (100 A)
- 75C Aluminum Feeder
- 1 AWG Al (100 A)
- Equipment Ground
- 8 AWG Cu / 6 AWG Al
- Neutral Isolation
- NEC 250.24 / 250.142 Mandatory
Why Does a 100 A Subpanel Require 3 AWG Copper Instead of 4 AWG?
Understand when NEC Table 310.12's 83% dwelling service allowance stops and full NEC Table 310.16 100% ampacity applies.
| Cable / Conduit Path | Copper Wire (75C) | Aluminum Wire (75C) | Equipment Ground & NEC Citation |
|---|---|---|---|
| Garage / ADU Subpanel (<100% dwelling load) | 3 AWG Cu (100 A) | 1 AWG Al (100 A) | 8 AWG Cu / 6 AWG Al EGC (Table 310.16 & 250.122) |
| NM-B / Romex Interior Run (60C limit!) | 1 AWG Cu NM-B (110 A) | N/A (use SER cable) | 2 AWG Cu NM-B only holds 95 A at 60 C (NEC 334.80) |
| Long Detached Garage Run (150+ ft) | 2 AWG Cu or 1 AWG Cu | 1/0 AWG Al | Upsize to hold voltage drop <=3% at 80–100 A load |
| Main Whole-Dwelling Service ONLY | 4 AWG Cu (83% rule) | 2 AWG Al (83% rule) | Permitted ONLY by NEC 310.12 for 100% house load |
What Additional Rules Apply to Detached Garages, Barns, and ADUs (NEC 250.32)?
Four non-negotiable subpanel wiring rules inspectors check immediately during rough-in and final sign-offs. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.
- Remove the Green Bonding Screw: In every subpanel downstream of the main service, keep neutral conductors on an isolated floating neutral bar and mount equipment grounds on a separate frame-bonded ground bar per NEC 250.142(B).
- Separate Building Disconnecting Means (NEC 225.31): Any subpanel inside a detached garage, workshop, or ADU requires a main breaker (100 A main-breaker panel) or <=6 handles acting as the building disconnect.
- Local Grounding Electrode System (NEC 250.32): Detached structures fed by a subpanel still require two 8-ft ground rods spaced >=6 ft apart connected via 6 AWG bare copper to the subpanel ground bar—while ALSO carrying the 4th EGC wire back to the main panel.
What Mistakes Trigger Failed 100 A Subpanel Inspections?
Avoid mixing NM-B 60 C limits, undersized 4 AWG feeders, or bonded neutral bars inside accessory subpanels. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.
- Installing 2 AWG Cu NM-B Romex inside walls limits ampacity to 95 A under NEC 334.80 (60 C), failing 100 A breaker protection unless round-up rules and continuous loads allow.
- Running old 3-wire overhead triplex without an insulated Equipment Grounding Conductor introduces hazardous touch voltage on garage appliances.
Attached Garage EV/Workshop
Pull 1-1-1-3 Al SER or 3x 3 AWG Cu + 8 AWG Cu EGC in 1-1/4 in PVC/EMT.
Detached ADU / Shed (>100 ft)
Install a 100 A main-breaker subpanel, remove bonding screw, and drive dual 8-ft ground rods.
Which Homeowner Electrical & Solar Questions Come Up Most Often?
Answers below come directly from official California Energy Commission equipment lists, U.S. Energy Information Administration utility reports, National Electrical Code rules, IRS 2026 guidance, and state licensing boards.
Can I use 2-2-2-4 aluminum SER cable on a 100 A subpanel breaker?
In most jurisdictions, 2 AWG aluminum SER rates 90 A at 75 C under NEC Table 310.16—not 100 A. Protect 2-2-2-4 SER with a 90 A feeder breaker (which handles nearly all garage subpanels cleanly) or step up to 1-1-1-3 Al SER for a true 100 A breaker.
Why do inspectors fail green bonding screws left inside subpanels?
Bonding neutral to the metal panel case downstream of the main service routes normal unbalanced return current onto metal conduit, appliance chassis, and water piping, creating shock hazards and stray EMF.
What makes an electrical contractor directory entry trustworthy versus a lead aggregator?
Government-sourced directories pull active license numbers directly from state regulatory agencies (TX TDLR, WA L&I, CO DORA, OR BCD, DE DPR) without paid rankings or synthetic reviews.
When is a 175 A main breaker derate practical instead of a 200 A panel replacement?
Derating a 200 A main breaker to 175 A expands NEC 705.12 solar backfeed from 40 A to 65 A—provided an NEC load calculation stays below 175 A on a UL-listed panelboard.
Why do 240 V garage EV outlets trip GFCI breakers while hardwired units do not?
NEC 210.8 and 625.54 mandate Class A GFCI protection on garage 240 V receptacles, which can conflict with an EV charger's internal CCID ground check unless hardwired.
How do you verify whether 1965-1973 aluminum branch wiring has been safely repaired?
Confirm inside junction boxes and panelboards that 15 A / 20 A solid aluminum wires use CPSC Publication 516 permanent repairs (COPALUM crimps or AlumiConn lugs) instead of standard wire nuts.
Who should NOT rely on online electrical calculators without an AHJ or PE review?
Commercial 3-phase installations, multi-family dwellings, homes with detached ADUs, and existing 100 A services adding simultaneous heat pumps and EV chargers require a formal AHJ-reviewed load calculation.
How often should Subpanel 100A Wire Size panel lugs and breakers be inspected?
Inspect residential load centers alongside Subpanel 100A Wire Size planning whenever major appliances, EV chargers, or solar equipment are added, or upon detecting heat under NEC 110.14(D).
Sources
All engineering ratings, cost benchmarks, safety rules, and statistics above trace directly to the 1 published registries listed below.
- NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)