Skip to main content
WireAndSun
Calculators
IECC 2 | 2023 NEC

Burleson County, TX — Electrical Grid, Wiring Age & Utility Profile

Climate Zone: IECC 2 State NEC: 2023 NEC Verified: 2026-11-26

Burleson County, Texas (#129 by population at 18,327 residents across 9,485 housing units) carries 31.0% pre-1980 homes, 76.1% electric heating vs. 10.6% utility gas, DOE IECC 2 weather conditions, and 9 federal disaster declarations (2015–2026) under 2023 NEC. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Pre-1980 Housing
31.0% (9,485 homes)
FEMA Declarations
9 Federal Disaster Declarations
Climate & NEC
IECC 2 / 2023 NEC
Utilities Mapped
5 EIA-861 utilities
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

What Do Housing Age, Heating Fuel, and Weather Risks Mean for Burleson County Homeowners?

How 31.0% older housing stock, 76.1% electric heat, and 9 federal disaster declarations impact Burleson County electrical panels.

Across 9,485 housing units in Burleson County, TX (76.1% electric heat, 10.6% piped gas), contractor quotes follow 2023 NEC. Only 31.0% of Burleson County dwellings predate 1980 (18.1% built 2010 or later), so most neighborhoods use 200 A copper-bus load centers ready for AFCI/GFCI protection and NEC 230.67 whole-home surge arrestors. FEMA NRI highlights elevated hurricane risk (percentile/index 72.507) alongside 9 federal disaster declarations since 2015, making Type 1/2 surge protection (NEC 230.67) and generator interlocks or LFP battery backup a top safety priority.

What Are the Key Electrical, Housing, and FEMA Risk Benchmarks for Burleson County?

Key pre-1980 wiring, DOE climate zone (2), space heating, and storm outage benchmarks for Burleson County, TX. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Wiring Age (ACS 2023)

31.0% Pre-1980 Homes (11.7% Pre-1960)

Of 9,485 dwellings, 31.0% predate 1980; inspect 1965–73 aluminum wiring or undersized 60A–100A panels before major loads.

Heating Demand

76.1% Electric Heat vs 10.6% Gas

IECC 2 climate conditions govern heat-pump capacity and cold-weather solar string Voc margins under 2023 NEC.

FEMA Storm Risk

NRI Very Low (Hurricane 72.5)

9 federal disaster declarations (2015–2026) underscore whole-home Type 1/2 surge and backup transfer needs.

65+ Homeowner Share

22.4% Seniors | Utility Rate ~15.4 c/kWh

Electrician pay statewide averages $28.16/hr; prioritize clear breaker directories and CO alarm clearances.

How Does Burleson County Rank Nationally on Housing Age and Weather Hazards?

Where Burleson County ranks nationally on pre-1980 residential wiring prevalence, electric heat share, and severe weather risk scores.

Burleson County, TX Electrical Risk BenchmarksDisplays pre-1980 legacy wiring prevalence, electric heat saturation, and top weather hazard score for Burleson County. 0% (Low)50% Median100% (Top)Pre-1980 Housing31.0%Electric Space Heat76.1%Peak Hazard (Hurricane)72.5

Which Federal Census, FEMA, and DOE Metrics Define Burleson County?

Official federal housing vintage, weather-risk, and state 2023 NEC code metrics indexed for Burleson County permits. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Combined Census ACS 2023, FEMA National Risk Index, OpenFEMA (2015–2026), and DOE IECC indicators for Burleson County, TX.
IndicatorValueElectrical & Homeowner Implication
Population & State Rank18,327 (#129 of 254)Census County Population Estimate & statewide rank
Housing Units (Pre-1980 / Pre-1960)9,485 (31.0% / 11.7%)Indicates prevalence of 60A/100A services, aluminum branch wire, or ungrounded circuits
Heating Fuel Split76.1% Electric / 10.6% Gas / 12.2% PropaneDetermines headroom when converting gas heat or dryers to 240V electric
Residents Aged 65+ & Median Home22.4% / $174,000Senior safety focus & local housing value baseline
DOE IECC Climate Zone & NEC2 / 2023 NECSets cold design Voc limits (NEC 690.7) and GFCI/AFCI adoption year
FEMA Disasters (2015–2026) & NRI9 / NRI Very Low (29.135)Multi-hour blackout history & composite weather hazard rating
Peak Weather Hazard ScoresWind 29.8, Winter 33.7, Lightning 34.8, Hail 55.5FEMA National Risk Index component ratings (0–100 scale)
EPA Radon Zone & Water TableZone 1 / 1.87 ft avg water tableBasement sub-slab depressurization fan circuit & ground-rod moisture context
Median Household Income$72,888/yrCensus ACS 2023 county household income benchmark

Which Electric Utilities Serve Burleson County, TX? (5)

EIA-861 electric utility service providers matched inside Burleson County territory with retail tariffs and SAIDI outages. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 retail tariffs and IEEE SAIDI outage duration for electric providers serving Burleson County.
Electric Utility Ownership Res. Rate (c/kWh) SAIDI (min/yr)
Entergy Texas Inc. Investor Owned 13.89 403.1
Bluebonnet Electric Coop, Inc Cooperative 11.59 113.6
City of Bryan - (TX) Municipal 10.89 —
Bartlett Electric Coop, Inc Cooperative 15.23 213.2
City of Caldwell EIA Provider State Avg —

How Does Burleson County Compare with Adjacent Counties?

Adjacent county electrical and housing-age profiles near Burleson County, Texas, led by Brazos County (22.1 mi away). Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

What to Check & Best-Fit Scenarios

What Electrical Limitations Should Burleson County Homeowners Check Before Upgrades?

Weigh pre-1980 branch wiring (31.0%), hurricane outages, and 2023 NEC requirements in Burleson County, TX. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

  • Legacy service limit: 31.0% pre-1980 housing stock means many homes still hold 100 A or stab-style panels needing NEC 220 load verification.
  • Weather exposure: FEMA hurricane (72.5) and 9 federal disaster declarations require outdoor disconnect labeling (NEC 230.85) and Type 1/2 surge arresters.
  • Heating conversion load: transitioning from 10.6% gas or 12.2% propane heat to cold-climate heat pumps often consumes remaining 200 A breaker space.

Burleson County Pre-1980 Retrofit

Audit aluminum branch splices (1965–73), tighten neutral lugs, and verify 120% solar busbar allowance before quoting.

Backup Power in IECC 2

Size standby generators or LFP batteries around 15.4 c/kWh tariffs and 9 federal disaster declarations exposure.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Homeowner wiring vintage, NEC code edition, and local utility answers grounded in federal filings for Burleson County, TX.

How common is pre-1980 residential electrical wiring in Burleson County, TX?

Census ACS 2023 data shows 31.0% of Burleson County's 9,485 homes were built before 1980 (with 11.7% predating 1960), making 60A–100A panel evaluations and aluminum splice checks essential before adding solar or EV chargers.

Which electric utilities operate in Burleson County, Texas?

EIA-861 utility mapping links 5 provider(s) inside Burleson County, led by Entergy Texas Inc.. Consult published equipment installation sheets alongside Burleson County tables before disconnecting power.

Which National Electrical Code and climate zone govern permits in Burleson County?

Texas enforces 2023 NEC, and Burleson County lies in DOE IECC climate zone 2, shaping cold-weather solar Voc margins (NEC 690.7) and outdoor GFCI/SPD rules.

Sources

  1. American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
  2. FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
  3. OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
  4. Building America & IECC Climate Zone County Classifications — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
  5. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  6. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.