Skip to main content
WireAndSun
Calculators
IECC 7 | 2023 NEC

McHenry County, ND — Electrical Grid, Wiring Age & Utility Profile

Climate Zone: IECC 7 State NEC: 2023 NEC Verified: 2026-11-26

McHenry County, North Dakota (#23 by population at 5,264 residents across 2,832 housing units) carries 72.4% pre-1980 homes, 39.6% electric heating vs. 2.4% utility gas, DOE IECC 7 weather conditions, and 5 federal disaster declarations (2015–2026) under 2023 NEC. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Pre-1980 Housing
72.4% (2,832 homes)
FEMA Declarations
5 Federal Disaster Declarations
Climate & NEC
IECC 7 / 2023 NEC
Utilities Mapped
6 EIA-861 utilities
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

What Do Housing Age, Heating Fuel, and Weather Risks Mean for McHenry County Homeowners?

How 72.4% older housing stock, 39.6% electric heat, and 5 federal disaster declarations impact McHenry County electrical panels.

Electric distribution maps to Northern States Power Co - Minnesota, Otter Tail Power Co, Verendrye Electric Coop Inc in McHenry County, North Dakota. Heating splits across utility gas (2.4%), electric (39.6%), and delivered propane/oil (50.8%), making dual-fuel standby generator sizing and smart load-shedding relays particularly relevant during winter cold snaps. With 72.4% pre-1980 housing (42.4% built pre-1960), McHenry County has heavy exposure to legacy 60 A–100 A fuse boxes, two-wire ungrounded circuits, and 1965–1973 aluminum branch wiring requiring COPALUM or AlumiConn pigtails. Compared with neighboring Pierce County (30.6 mi away), McHenry County carries an NRI Very Low composite profile and 5 federal disaster declarations.

What Are the Key Electrical, Housing, and FEMA Risk Benchmarks for McHenry County?

Key pre-1980 wiring, DOE climate zone (7), space heating, and storm outage benchmarks for McHenry County, ND. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Wiring Age (ACS 2023)

72.4% Pre-1980 Homes (42.4% Pre-1960)

Of 2,832 dwellings, 72.4% predate 1980; inspect 1965–73 aluminum wiring or undersized 60A–100A panels before major loads.

Heating Demand

39.6% Electric Heat vs 2.4% Gas

IECC 7 climate conditions govern heat-pump capacity and cold-weather solar string Voc margins under 2023 NEC.

FEMA Storm Risk

NRI Very Low (Winter Weather 89.4)

5 federal disaster declarations (2015–2026) underscore whole-home Type 1/2 surge and backup transfer needs.

65+ Homeowner Share

21.8% Seniors | Utility Rate ~11.82 c/kWh

Electrician pay statewide averages $31.59/hr; prioritize clear breaker directories and CO alarm clearances.

How Does McHenry County Rank Nationally on Housing Age and Weather Hazards?

Where McHenry County ranks nationally on pre-1980 residential wiring prevalence, electric heat share, and severe weather risk scores.

McHenry County, ND Electrical Risk BenchmarksDisplays pre-1980 legacy wiring prevalence, electric heat saturation, and top weather hazard score for McHenry County. 0% (Low)50% Median100% (Top)Pre-1980 Housing72.4%Electric Space Heat39.6%Peak Hazard (Winter Weather)89.4

Which Federal Census, FEMA, and DOE Metrics Define McHenry County?

Official federal housing vintage, weather-risk, and state 2023 NEC code metrics indexed for McHenry County permits. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Combined Census ACS 2023, FEMA National Risk Index, OpenFEMA (2015–2026), and DOE IECC indicators for McHenry County, ND.
IndicatorValueElectrical & Homeowner Implication
Population & State Rank5,264 (#23 of 53)Census County Population Estimate & statewide rank
Housing Units (Pre-1980 / Pre-1960)2,832 (72.4% / 42.4%)Indicates prevalence of 60A/100A services, aluminum branch wire, or ungrounded circuits
Heating Fuel Split39.6% Electric / 2.4% Gas / 41.7% PropaneDetermines headroom when converting gas heat or dryers to 240V electric
Residents Aged 65+ & Median Home21.8% / $143,200Senior safety focus & local housing value baseline
DOE IECC Climate Zone & NEC7 / 2023 NECSets cold design Voc limits (NEC 690.7) and GFCI/AFCI adoption year
FEMA Disasters (2015–2026) & NRI5 / NRI Very Low (11.737)Multi-hour blackout history & composite weather hazard rating
Peak Weather Hazard ScoresWind 17.9, Winter 89.4, Lightning 6.8, Hail 46.6FEMA National Risk Index component ratings (0–100 scale)
EPA Radon Zone & Water TableZone 1 / 2.44 ft avg water tableBasement sub-slab depressurization fan circuit & ground-rod moisture context
Median Household Income$80,614/yrCensus ACS 2023 county household income benchmark

Which Electric Utilities Serve McHenry County, ND? (6)

EIA-861 electric utility service providers matched inside McHenry County territory with retail tariffs and SAIDI outages. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 retail tariffs and IEEE SAIDI outage duration for electric providers serving McHenry County.
Electric Utility Ownership Res. Rate (c/kWh) SAIDI (min/yr)
Northern States Power Co - Minnesota Investor Owned 13.54 87.6
Otter Tail Power Co Investor Owned 11.07 575.0
Verendrye Electric Coop Inc Cooperative 11.19 41.7
North Central Elec Coop, Inc - (ND) Cooperative 10.94 —
McLean Electric Coop, Inc Cooperative 14.64 —
WAPA-- Western Area Power Administration EIA Provider State Avg —

How Does McHenry County Compare with Adjacent Counties?

Adjacent county electrical and housing-age profiles near McHenry County, North Dakota, led by Pierce County (30.6 mi away).

What to Check & Best-Fit Scenarios

What Electrical Limitations Should McHenry County Homeowners Check Before Upgrades?

Weigh pre-1980 branch wiring (72.4%), winter weather outages, and 2023 NEC requirements in McHenry County, ND. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

  • Legacy service limit: 72.4% pre-1980 housing stock means many homes still hold 100 A or stab-style panels needing NEC 220 load verification.
  • Weather exposure: FEMA winter weather (89.4) and 5 federal disaster declarations require outdoor disconnect labeling (NEC 230.85) and Type 1/2 surge arresters.
  • Heating conversion load: transitioning from 2.4% gas or 41.7% propane heat to cold-climate heat pumps often consumes remaining 200 A breaker space.

McHenry County Pre-1980 Retrofit

Audit aluminum branch splices (1965–73), tighten neutral lugs, and verify 120% solar busbar allowance before quoting.

Backup Power in IECC 7

Size standby generators or LFP batteries around 11.82 c/kWh tariffs and 5 federal disaster declarations exposure.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Homeowner wiring vintage, NEC code edition, and local utility answers grounded in federal filings for McHenry County, ND.

How common is pre-1980 residential electrical wiring in McHenry County, ND?

Census ACS 2023 data shows 72.4% of McHenry County's 2,832 homes were built before 1980 (with 42.4% predating 1960), making 60A–100A panel evaluations and aluminum splice checks essential before adding solar or EV chargers.

Which electric utilities operate in McHenry County, North Dakota?

EIA-861 utility mapping links 6 provider(s) inside McHenry County, led by Northern States Power Co - Minnesota. Consult published equipment installation sheets alongside Mchenry County tables before disconnecting power.

Which National Electrical Code and climate zone govern permits in McHenry County?

North Dakota enforces 2023 NEC, and McHenry County lies in DOE IECC climate zone 7, shaping cold-weather solar Voc margins (NEC 690.7) and outdoor GFCI/SPD rules.

Sources

  1. American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
  2. FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
  3. OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
  4. Building America & IECC Climate Zone County Classifications — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
  5. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  6. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.