Skip to main content
WireAndSun
Calculators
IECC 7 | 2023 NEC

Eddy County, ND — Electrical Grid, Wiring Age & Utility Profile

Climate Zone: IECC 7 State NEC: 2023 NEC Verified: 2026-11-26

Eddy County, North Dakota (#40 by population at 2,319 residents across 1,338 housing units) carries 70.9% pre-1980 homes, 26.4% electric heating vs. 50.0% utility gas, DOE IECC 7 weather conditions, and 4 federal disaster declarations (2015–2026) under 2023 NEC. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

Pre-1980 Housing
70.9% (1,338 homes)
FEMA Declarations
4 Federal Disaster Declarations
Climate & NEC
IECC 7 / 2023 NEC
Utilities Mapped
4 EIA-861 utilities
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure
Sunlit US residential neighborhood featuring rooftop solar arrays and local electrical distribution infrastructure

What Do Housing Age, Heating Fuel, and Weather Risks Mean for Eddy County Homeowners?

How 70.9% older housing stock, 26.4% electric heat, and 4 federal disaster declarations impact Eddy County electrical panels.

Homeowners upgrading electrical panels or solar arrays in Eddy County (North Dakota, rank #40) face 70.9% pre-1980 housing stock under 2023 NEC. Hazard exposure centers on wildfire (NRI 63.009) with 4 federal disaster declarations in 2015–2026 OpenFEMA archives, supporting code-compliant grounding and surge defense without extreme coastal wind-load premiums. Natural gas leads space heating at 50.0% (electric heat 26.4%, propane 20.8%), meaning future heat-pump or induction stove retrofits often push older Eddy County services past 80% continuous panel capacity unless load-managed. Neighboring Foster County (17.4 mi away) shows similar regional construction patterns.

What Are the Key Electrical, Housing, and FEMA Risk Benchmarks for Eddy County?

Key pre-1980 wiring, DOE climate zone (7), space heating, and storm outage benchmarks for Eddy County, ND. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Wiring Age (ACS 2023)

70.9% Pre-1980 Homes (41.8% Pre-1960)

Of 1,338 dwellings, 70.9% predate 1980; inspect 1965–73 aluminum wiring or undersized 60A–100A panels before major loads.

Heating Demand

26.4% Electric Heat vs 50.0% Gas

IECC 7 climate conditions govern heat-pump capacity and cold-weather solar string Voc margins under 2023 NEC.

FEMA Storm Risk

NRI Very Low (Wildfire 63.0)

4 federal disaster declarations (2015–2026) underscore whole-home Type 1/2 surge and backup transfer needs.

65+ Homeowner Share

26.8% Seniors | Utility Rate ~11.82 c/kWh

Electrician pay statewide averages $31.59/hr; prioritize clear breaker directories and CO alarm clearances.

How Does Eddy County Rank Nationally on Housing Age and Weather Hazards?

Where Eddy County ranks nationally on pre-1980 residential wiring prevalence, electric heat share, and severe weather risk scores.

Eddy County, ND Electrical Risk BenchmarksDisplays pre-1980 legacy wiring prevalence, electric heat saturation, and top weather hazard score for Eddy County. 0% (Low)50% Median100% (Top)Pre-1980 Housing70.9%Electric Space Heat26.4%Peak Hazard (Wildfire)63.0

Which Federal Census, FEMA, and DOE Metrics Define Eddy County?

Official federal housing vintage, weather-risk, and state 2023 NEC code metrics indexed for Eddy County permits. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Combined Census ACS 2023, FEMA National Risk Index, OpenFEMA (2015–2026), and DOE IECC indicators for Eddy County, ND.
IndicatorValueElectrical & Homeowner Implication
Population & State Rank2,319 (#40 of 53)Census County Population Estimate & statewide rank
Housing Units (Pre-1980 / Pre-1960)1,338 (70.9% / 41.8%)Indicates prevalence of 60A/100A services, aluminum branch wire, or ungrounded circuits
Heating Fuel Split26.4% Electric / 50.0% Gas / 20.8% PropaneDetermines headroom when converting gas heat or dryers to 240V electric
Residents Aged 65+ & Median Home26.8% / $115,500Senior safety focus & local housing value baseline
DOE IECC Climate Zone & NEC7 / 2023 NECSets cold design Voc limits (NEC 690.7) and GFCI/AFCI adoption year
FEMA Disasters (2015–2026) & NRI4 / NRI Very Low (1.845)Multi-hour blackout history & composite weather hazard rating
Peak Weather Hazard ScoresWind 13.3, Winter 56.4, Lightning 1.0, Hail 41.2FEMA National Risk Index component ratings (0–100 scale)
EPA Radon Zone & Water TableZone 1 / 2.42 ft avg water tableBasement sub-slab depressurization fan circuit & ground-rod moisture context
Median Household Income$55,389/yrCensus ACS 2023 county household income benchmark

Which Electric Utilities Serve Eddy County, ND? (4)

EIA-861 electric utility service providers matched inside Eddy County territory with retail tariffs and SAIDI outages. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 retail tariffs and IEEE SAIDI outage duration for electric providers serving Eddy County.
Electric Utility Ownership Res. Rate (c/kWh) SAIDI (min/yr)
Otter Tail Power Co Investor Owned 11.07 575.0
Nodak Electric Coop Inc Cooperative 12.69 321.1
Northern Plains Electric Coop Cooperative 10.88 371.0
WAPA-- Western Area Power Administration EIA Provider State Avg —

How Does Eddy County Compare with Adjacent Counties?

Adjacent county electrical and housing-age profiles near Eddy County, North Dakota, led by Foster County (17.4 mi away).

What to Check & Best-Fit Scenarios

What Electrical Limitations Should Eddy County Homeowners Check Before Upgrades?

Weigh pre-1980 branch wiring (70.9%), wildfire outages, and 2023 NEC requirements in Eddy County, ND. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

  • Legacy service limit: 70.9% pre-1980 housing stock means many homes still hold 100 A or stab-style panels needing NEC 220 load verification.
  • Weather exposure: FEMA wildfire (63.0) and 4 federal disaster declarations require outdoor disconnect labeling (NEC 230.85) and Type 1/2 surge arresters.
  • Heating conversion load: transitioning from 50.0% gas or 20.8% propane heat to cold-climate heat pumps often consumes remaining 200 A breaker space.

Eddy County Pre-1980 Retrofit

Audit aluminum branch splices (1965–73), tighten neutral lugs, and verify 120% solar busbar allowance before quoting.

Backup Power in IECC 7

Size standby generators or LFP batteries around 11.82 c/kWh tariffs and 4 federal disaster declarations exposure.

Which Homeowner Electrical & Solar Questions Come Up Most Often?

Homeowner wiring vintage, NEC code edition, and local utility answers grounded in federal filings for Eddy County, ND.

How common is pre-1980 residential electrical wiring in Eddy County, ND?

Census ACS 2023 data shows 70.9% of Eddy County's 1,338 homes were built before 1980 (with 41.8% predating 1960), making 60A–100A panel evaluations and aluminum splice checks essential before adding solar or EV chargers.

Which electric utilities operate in Eddy County, North Dakota?

EIA-861 utility mapping links 4 provider(s) inside Eddy County, led by Otter Tail Power Co. Consult published equipment installation sheets alongside Eddy County tables before disconnecting power.

Which National Electrical Code and climate zone govern permits in Eddy County?

North Dakota enforces 2023 NEC, and Eddy County lies in DOE IECC climate zone 7, shaping cold-weather solar Voc margins (NEC 690.7) and outdoor GFCI/SPD rules.

Sources

  1. American Community Survey (ACS) 5-Year Estimates — Housing Age, Heating Fuel, Demographics & Home Values — U.S. Census Bureau, 2019-2023 5-Year Estimates (retrieved 2026-11-25)
  2. FEMA National Risk Index (NRI) — County Lightning, High Wind, Hurricane, Winter Weather & Wildfire Risk — Federal Emergency Management Agency (FEMA), National Risk Index County Release (retrieved 2026-11-25)
  3. OpenFEMA Disaster Declarations Summaries v2 (Storm, Hurricane, Ice, Wildfire Grid Perils) — Federal Emergency Management Agency (FEMA), v2 (2015-2026) (retrieved 2026-11-23)
  4. Building America & IECC Climate Zone County Classifications — U.S. Department of Energy (DOE) / Pacific Northwest National Laboratory (PNNL), 2021/2024 IECC Climate Zones (retrieved 2026-11-25)
  5. Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
  6. NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)

Which Regional Electrical & Panel Upgrade Metros Compare Closest?

Check Wiring & Solar Numbers Before Getting Quotes

Verify panel capacity for solar, electrical box space, proper wire gauge for EV chargers, and 2026 home solar payback using local utility rates.

Verify State-Licensed Electricians & Safety Recalls

Look up active state electrician licenses (TX, WA, CO, OR, DE), check local power-outage history, and inspect federal product recall notices.