title: "The Potomac Edison Company (WV) Rate & SAIDI"
url: https://epri-peac.com/utilities/wv-the-potomac-edison-company-15263/
description: "2025 EIA-861 profile for The Potomac Edison Company (WV): 13.1 c/kWh rate, SAIDI 439.6 min/yr, 1,472 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# The Potomac Edison Company (WV) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

The Potomac Edison Company (EIA ID 15263, WV) serves 138,070 customers at 13.1 c/kWh (-2.29 c/kWh vs West Virginia average) with 439.6 min/yr SAIDI (7.33 hrs/yr) with 1,472 net-metered residential solar systems (1.07% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 15263

- **Res. Rate** : 13.1 c/kWh

- **SAIDI (All Events)** : 439.6 min/yr

- **Net-Metered PV** : 1,472 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does The Potomac Edison Company Compare on Tariffs and Reliability?

How The Potomac Edison Company (Investor Owned) performs across 8 counties on kWh rates and outage resilience. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Across 8 counties including Berkeley, Grant, Hampshire, The Potomac Edison Company bills residential power at 13.1 c/kWh (-2.29 c/kWh vs West Virginia average vs. West Virginia), offsetting ~$1,415/yr on an 8 kW array compared to peer Wheeling Power Co (17.61 c/kWh). With 138,070 customer accounts (Investor Owned), 2025 Form EIA-861 shows The Potomac Edison Company logged 439.6 SAIDI outage minutes (7.33 hrs/yr, 43.4% storm-driven), making battery backup or a standby ATS worthwhile, with 1,472 net-metered residential solar systems (1.07% customer adoption).

## Where Does The Potomac Edison Company Sit Across US Utility Rates?

National utility tariff curve marking The Potomac Edison Company at 13.1 c/kWh vs. 18.54 c/kWh US mean.

## How Does The Potomac Edison Company Rank Across Cost & Reliability?

Relative ranking of The Potomac Edison Company on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for The Potomac Edison Company?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for The Potomac Edison Company in West Virginia.

Lowest Rate #688 / 1,989

### 13.1 c/kWh (-2.29 vs WV)

Commercial avg: 11.63 c/kWh; Industrial: 7.92 c/kWh; est. residential bill $164.57/mo.

Reliability #609 / 751

### 439.6 min/yr (7.33 hrs)

43.4% (190.8 min) from Major Event Days; avg restore 223.9 min (~6.7 kWh @ 1.8 kW).

Post-25D Payback

### 16.7 Years @ 13.1 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,415/yr at 1,350 kWh/kW.

Distributed PV

### 1,472 Net-Metered Systems

13.575 MW residential PV (1.07% of customers) across 8 counties; state FEMA declarations (2015-2026): 25.

The Potomac Edison Company Reliability & Solar Offset Calculation

Backup_Energy = (223.9 min / 60) * 1.8 kW = 6.7 kWh/event | Solar_Offset = 10,800 kWh * $0.1310 = $1,415/yr

EIA-861 2025 Utility ID 15263: Rate=13.1 c/kWh, Cust=138,070, SAIDI=439.6 min, PV=1,472.

**Result:** 7.33 outage hrs/yr; 16.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for The Potomac Edison Company?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by The Potomac Edison Company. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for The Potomac Edison Company (Utility ID 15263).

| EIA Utility ID & BA Code | ID 15263 · PJM |
|---|---|
| State & Ownership Type | WV · Investor Owned |
| Retail Electricity Rates | 13.1 c/kWh Res · 11.63 c Comm · 7.92 c Ind |
| Avg Monthly Usage & Bill | 1,256.5 kWh/mo ($164.57/mo est.) |
| SAIDI (All Events w/ MED) | 439.6 min/yr (7.33 hrs/yr) |
| SAIDI (Without Major Events) | 248.8 min/yr (Storm share: 43.4%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.964 /yr · 223.9 min restore |
| Residential Net-Metered PV | 1,472 systems (13.575 MW) |
| Counties Served (Sample) | 8 counties (Berkeley, Grant, Hampshire, Hardy, Jefferson, Mineral, Morgan, Pendleton) |

## Which Peer Electric Utilities Operate in WV?

Nearby West Virginia electric utilities of comparable customer size led by Wheeling Power Co (17.61 c/kWh). Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Wheeling Power Co**](https://epri-peac.com/utilities/wv-wheeling-power-co-20521/) | 17.61 c | 706.1 min | 111 | 34,202 |
| [**Black Diamond Power Co**](https://epri-peac.com/utilities/wv-black-diamond-power-co-1764/) | 20.1 c | — | 0 | 3,243 |
| [**Palmetto Solar, LLC**](https://epri-peac.com/utilities/wv-palmetto-solar-llc-66026/) | 29.4 c | — | 0 | 54 |
| [**Monongahela Power Co**](https://epri-peac.com/utilities/wv-monongahela-power-co-12796/) | 14.31 c | 1,250.4 min | 1,090 | 334,336 |

What to Check & Best-Fit Scenarios

## What Should The Potomac Edison Company Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for The Potomac Edison Company (Investor Owned, WV) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: The Potomac Edison Company's 13.1 c/kWh blended residential rate in WV does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: The Potomac Edison Company system-wide SAIDI averages rural and urban circuits across its WV territory or nearby Wheeling Power Co.

### The Potomac Edison Company Solar & Battery Evaluators

Compare your actual The Potomac Edison Company monthly kWh statement against 13.1 c/kWh and verify current export tariffs in WV.

### The Potomac Edison Company Outage & Generator Planners

Use The Potomac Edison Company's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for The Potomac Edison Company (West Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is The Potomac Edison Company's residential electricity rate and 2026 solar payback?

The Potomac Edison Company averages 13.1 c/kWh (-2.29 c/kWh vs West Virginia average vs. West Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,415/yr (16.7-year payback).

### How reliable is The Potomac Edison Company compared to peer West Virginia utilities?

The Potomac Edison Company logged 439.6 SAIDI outage minutes (7.33 hrs/yr, 43.4% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Wheeling Power Co (17.61 c/kWh) across West Virginia.

### Which counties and customers does The Potomac Edison Company serve in West Virginia?

EIA-861 filings list 138,070 customers across 8 counties including Berkeley, Grant, Hampshire, with 1,472 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting The Potomac Edison Company.

## Related Pages

Explore West Virginia energy benchmarks, Wheeling Power Co, county outage profiles, and NEC 705.12 tools alongside The Potomac Edison Company.

[West Virginia State Energy Rates & Utilities](https://epri-peac.com/states/west-virginia/) [All West Virginia County Power & Outage Profiles](https://epri-peac.com/counties/west-virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.1 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)