---
title: "PUD No 2 of Pacific County (WA) Rate & SAIDI"
url: https://epri-peac.com/utilities/wa-pud-no-2-of-pacific-county-14324/
description: "2025 EIA-861 profile for PUD No 2 of Pacific County (WA): 9.36 c/kWh rate, SAIDI Not reported in EIA-861, 104 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# PUD No 2 of Pacific County (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

PUD No 2 of Pacific County (EIA ID 14324, WA) serves 16,586 customers at 9.36 c/kWh (-3.81 c/kWh vs Washington average) with no standalone IEEE SAIDI filing (3 counties served) with 104 net-metered residential solar systems (0.63% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14324

- **Res. Rate** : 9.36 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 104 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does PUD No 2 of Pacific County Compare on Tariffs and Reliability?

EIA-861 rate delta (-3.81 c/kWh vs Washington average), customer scale (16,586), and 2026 solar payback benchmarks for PUD No 2 of Pacific County.

Ranked #89 of 1,989 reporting US utilities for residential rate (top 4.5%; lower than 95.5% of peers), PUD No 2 of Pacific County serves 16,586 accounts in Washington (Political Subdivision). Commercial power averages 8.89 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr), with 104 net-metered residential solar systems (0.63% customer adoption).

## Where Does PUD No 2 of Pacific County Sit Across US Utility Rates?

Positions PUD No 2 of Pacific County (9.36 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does PUD No 2 of Pacific County Rank Across Cost & Reliability?

Percentile placement of PUD No 2 of Pacific County across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for PUD No 2 of Pacific County?

Four key EIA-861 rate, outage, and solar payback benchmarks for PUD No 2 of Pacific County (Political Subdivision) in Washington.

Lowest Rate #89 / 1,989

### 9.36 c/kWh (-3.81 vs WA)

Commercial avg: 8.89 c/kWh; Industrial: 6.2 c/kWh; est. residential bill $91.07/mo.

State Reliability Context

### 380.8 min/yr (WA Avg)

Utility did not file separate IEEE SAIDI in 2025; Washington customer-weighted SAIDI is 380.8 min/yr.

Post-25D Payback

### 23.3 Years @ 9.36 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,011/yr at 1,350 kWh/kW.

Distributed PV

### 104 Net-Metered Systems

0.796 MW residential PV (0.63% of customers) across 3 counties; state FEMA declarations (2015-2026): 96.

PUD No 2 of Pacific County Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0936 = $1,011/yr

EIA-861 2025 Utility ID 14324: Rate=9.36 c/kWh, Cust=16,586, PV=104.

**Result:** 23.3 yr 8 kW cash payback at 9.36 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for PUD No 2 of Pacific County?

Complete Form EIA-861 filing summary for PUD No 2 of Pacific County (ID 14324) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for PUD No 2 of Pacific County (Utility ID 14324).

| EIA Utility ID & BA Code | ID 14324 · BPAT |
|---|---|
| State & Ownership Type | WA · Political Subdivision |
| Retail Electricity Rates | 9.36 c/kWh Res · 8.89 c Comm · 6.2 c Ind |
| Avg Monthly Usage & Bill | 973.3 kWh/mo ($91.07/mo est.) |
| Residential Net-Metered PV | 104 systems (0.796 MW) |
| Counties Served (Sample) | 3 counties (Grays Harbor, Pacific, Wahkiakum) |

## Which Peer Electric Utilities Operate in WA?

Compare PUD No 2 of Pacific County directly with PUD No 1 of Douglas County - (WA) and nearby Washington electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**PUD No 1 of Douglas County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-douglas-county-wa-5326/) | 3.17 c | — | 33 | 16,909 |
| [**Elmhurst Mutual Power & Light Co**](https://epri-peac.com/utilities/wa-elmhurst-mutual-power-light-co-5832/) | 8.68 c | — | 94 | 15,538 |
| [**PUD No 1 of Okanogan County**](https://epri-peac.com/utilities/wa-pud-no-1-of-okanogan-county-14055/) | 10.42 c | — | 123 | 18,230 |
| [**PUD No 1 of Jefferson County**](https://epri-peac.com/utilities/wa-pud-no-1-of-jefferson-county-59013/) | 13.86 c | 773.9 min | 706 | 18,750 |

What to Check & Best-Fit Scenarios

## What Should PUD No 2 of Pacific County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for PUD No 2 of Pacific County (Political Subdivision, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether PUD No 2 of Pacific County acts as a wires-only TDU or bundled utility in WA.
- Transformer limits: PUD No 2 of Pacific County interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### PUD No 2 of Pacific County Solar & Battery Evaluators

Compare your actual PUD No 2 of Pacific County monthly kWh statement against 9.36 c/kWh and verify current export tariffs in WA.

### PUD No 2 of Pacific County Outage & Generator Planners

Use PUD No 2 of Pacific County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for PUD No 2 of Pacific County (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is PUD No 2 of Pacific County's residential electricity rate and 2026 solar payback?

PUD No 2 of Pacific County averages 9.36 c/kWh (-3.81 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,011/yr (23.3-year payback).

### How reliable is PUD No 2 of Pacific County compared to peer Washington utilities?

PUD No 2 of Pacific County did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr); compare rates and outage history directly with PUD No 1 of Douglas County - (WA) (3.17 c/kWh) across Washington.

### Which counties and customers does PUD No 2 of Pacific County serve in Washington?

EIA-861 filings list 16,586 customers across 3 counties including Grays Harbor, Pacific, Wahkiakum, with 104 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting PUD No 2 of Pacific County.

## Related Pages

Explore Washington energy benchmarks, PUD No 1 of Douglas County - (WA), county outage profiles, and NEC 705.12 tools alongside PUD No 2 of Pacific County.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.36 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
