Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

PUD No 1 of Grays Harbor County (EIA ID 7548, WA) serves 40,116 customers at 12.69 c/kWh (-0.48 c/kWh vs Washington average) with 1,036.0 min/yr SAIDI (17.27 hrs/yr) with 343 net-metered residential solar systems (0.86% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7548

- **Res. Rate** : 12.69 c/kWh

- **SAIDI (All Events)** : 1,036.0 min/yr

- **Net-Metered PV** : 343 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does PUD No 1 of Grays Harbor County Compare on Tariffs and Reliability?

How PUD No 1 of Grays Harbor County (Political Subdivision) performs across 5 counties on kWh rates and outage resilience.

Across 5 counties including Grays Harbor, Jefferson, Lewis, PUD No 1 of Grays Harbor County offers a low 12.69 c/kWh residential rate (-5.85 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.2 years without federal 25D compared to peer Inland Power & Light Company (9.56 c/kWh). With 40,116 customer accounts (Political Subdivision), 2025 Form EIA-861 shows PUD No 1 of Grays Harbor County logged 1,036.0 SAIDI outage minutes (17.27 hrs/yr, 67.4% storm-driven), making battery backup or a standby ATS worthwhile, with 343 net-metered residential solar systems (0.86% customer adoption).

## Where Does PUD No 1 of Grays Harbor County Sit Across US Utility Rates?

National utility tariff curve marking PUD No 1 of Grays Harbor County at 12.69 c/kWh vs. 18.54 c/kWh US mean.

## How Does PUD No 1 of Grays Harbor County Rank Across Cost & Reliability?

Relative ranking of PUD No 1 of Grays Harbor County on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for PUD No 1 of Grays Harbor County?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for PUD No 1 of Grays Harbor County in Washington.

Lowest Rate #559 / 1,989

### 12.69 c/kWh (-0.48 vs WA)

Commercial avg: 10.97 c/kWh; Industrial: 6.97 c/kWh; est. residential bill $132.64/mo.

Reliability #717 / 751

### 1,036.0 min/yr (17.27 hrs)

67.4% (698.0 min) from Major Event Days; avg restore 370.0 min (~11.1 kWh @ 1.8 kW).

Post-25D Payback

### 17.2 Years @ 12.69 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,371/yr at 1,350 kWh/kW.

Distributed PV

### 343 Net-Metered Systems

2.788 MW residential PV (0.86% of customers) across 5 counties; state FEMA declarations (2015-2026): 96.

PUD No 1 of Grays Harbor County Reliability & Solar Offset Calculation

Backup_Energy = (370.0 min / 60) * 1.8 kW = 11.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1269 = $1,371/yr

EIA-861 2025 Utility ID 7548: Rate=12.69 c/kWh, Cust=40,116, SAIDI=1,036.0 min, PV=343.

**Result:** 17.27 outage hrs/yr; 17.2 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for PUD No 1 of Grays Harbor County?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by PUD No 1 of Grays Harbor County.

Form EIA-861 2025 filing metrics for PUD No 1 of Grays Harbor County (Utility ID 7548).

| EIA Utility ID & BA Code | ID 7548 · BPAT |
|---|---|
| State & Ownership Type | WA · Political Subdivision |
| Retail Electricity Rates | 12.69 c/kWh Res · 10.97 c Comm · 6.97 c Ind |
| Avg Monthly Usage & Bill | 1,044.9 kWh/mo ($132.64/mo est.) |
| SAIDI (All Events w/ MED) | 1,036.0 min/yr (17.27 hrs/yr) |
| SAIDI (Without Major Events) | 338.0 min/yr (Storm share: 67.4%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.8 /yr · 370.0 min restore |
| Residential Net-Metered PV | 343 systems (2.788 MW) |
| Counties Served (Sample) | 5 counties (Grays Harbor, Jefferson, Lewis, Pacific, Thurston) |

## Which Peer Electric Utilities Operate in WA?

Nearby Washington electric utilities of comparable customer size led by Inland Power & Light Company (9.56 c/kWh). Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Inland Power & Light Company**](https://epri-peac.com/utilities/wa-inland-power-light-company-8699/) | 9.56 c | 536.0 min | 663 | 42,351 |
| [**PUD No 1 of Chelan County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-chelan-county-wa-3413/) | 3.78 c | 327.1 min | 101 | 42,571 |
| [**PUD No 2 of Grant County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-2-of-grant-county-wa-14624/) | 6.17 c | — | 171 | 43,160 |
| [**Peninsula Light Company**](https://epri-peac.com/utilities/wa-peninsula-light-company-14668/) | 11.3 c | 744.5 min | 359 | 35,595 |

What to Check & Best-Fit Scenarios

## What Should PUD No 1 of Grays Harbor County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for PUD No 1 of Grays Harbor County (Political Subdivision, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside PUD No 1 of Grays Harbor County (WA) shift real bills away from 12.69 c/kWh.
- Outage clustering: Major Event Days skew PUD No 1 of Grays Harbor County annual minutes differently than routine non-storm reliability.

### PUD No 1 of Grays Harbor County Solar & Battery Evaluators

Compare your actual PUD No 1 of Grays Harbor County monthly kWh statement against 12.69 c/kWh and verify current export tariffs in WA.

### PUD No 1 of Grays Harbor County Outage & Generator Planners

Use PUD No 1 of Grays Harbor County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for PUD No 1 of Grays Harbor County (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is PUD No 1 of Grays Harbor County's residential electricity rate and 2026 solar payback?

PUD No 1 of Grays Harbor County averages 12.69 c/kWh (-0.48 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,371/yr (17.2-year payback).

### How reliable is PUD No 1 of Grays Harbor County compared to peer Washington utilities?

PUD No 1 of Grays Harbor County logged 1,036.0 SAIDI outage minutes (17.27 hrs/yr, 67.4% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Inland Power & Light Company (9.56 c/kWh) across Washington.

### Which counties and customers does PUD No 1 of Grays Harbor County serve in Washington?

EIA-861 filings list 40,116 customers across 5 counties including Grays Harbor, Jefferson, Lewis, with 343 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting PUD No 1 of Grays Harbor County.

## Related Pages

Explore Washington energy benchmarks, Inland Power & Light Company, county outage profiles, and NEC 705.12 tools alongside PUD No 1 of Grays Harbor County.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.69 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)