# PUD No 1 of Franklin County (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

PUD No 1 of Franklin County (EIA ID 6716, WA) serves 27,692 customers at 9.99 c/kWh (-3.18 c/kWh vs Washington average) with no standalone IEEE SAIDI filing (1 county served) with 923 net-metered residential solar systems (3.33% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6716

- **Res. Rate** : 9.99 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 923 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does PUD No 1 of Franklin County Compare on Tariffs and Reliability?

How PUD No 1 of Franklin County (Political Subdivision) performs across 1 county on kWh rates and outage resilience.

Across 1 county including Franklin, PUD No 1 of Franklin County offers a low 9.99 c/kWh residential rate (-8.55 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 21.9 years without federal 25D compared to peer City of Richland - (WA) (10.0 c/kWh). With 27,692 customer accounts (Political Subdivision), 2025 Form EIA-861 shows PUD No 1 of Franklin County did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr), with 923 net-metered residential solar systems (3.33% customer adoption).

## Where Does PUD No 1 of Franklin County Sit Across US Utility Rates?

National utility tariff curve marking PUD No 1 of Franklin County at 9.99 c/kWh vs. 18.54 c/kWh US mean.

## How Does PUD No 1 of Franklin County Rank Across Cost & Reliability?

Relative ranking of PUD No 1 of Franklin County on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for PUD No 1 of Franklin County?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for PUD No 1 of Franklin County in Washington.

Lowest Rate #134 / 1,989

### 9.99 c/kWh (-3.18 vs WA)

Commercial avg: 7.89 c/kWh; Industrial: 6.92 c/kWh; est. residential bill $121.35/mo.

State Reliability Context

### 380.8 min/yr (WA Avg)

Utility did not file separate IEEE SAIDI in 2025; Washington customer-weighted SAIDI is 380.8 min/yr.

Post-25D Payback

### 21.9 Years @ 9.99 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,079/yr at 1,350 kWh/kW.

Distributed PV

### 923 Net-Metered Systems

6.58 MW residential PV (3.33% of customers) across 1 county; state FEMA declarations (2015-2026): 96.

PUD No 1 of Franklin County Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0999 = $1,079/yr

EIA-861 2025 Utility ID 6716: Rate=9.99 c/kWh, Cust=27,692, PV=923.

**Result:** 21.9 yr 8 kW cash payback at 9.99 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for PUD No 1 of Franklin County?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by PUD No 1 of Franklin County.

Form EIA-861 2025 filing metrics for PUD No 1 of Franklin County (Utility ID 6716).

| EIA Utility ID & BA Code | ID 6716 · BPAT |
|---|---|
| State & Ownership Type | WA · Political Subdivision |
| Retail Electricity Rates | 9.99 c/kWh Res · 7.89 c Comm · 6.92 c Ind |
| Avg Monthly Usage & Bill | 1,214.4 kWh/mo ($121.35/mo est.) |
| Residential Net-Metered PV | 923 systems (6.58 MW) |
| Counties Served (Sample) | 1 county (Franklin) |

## Which Peer Electric Utilities Operate in WA?

Nearby Washington electric utilities of comparable customer size led by City of Richland - (WA) (10.0 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Richland - (WA)**](https://epri-peac.com/utilities/wa-city-of-richland-wa-15979/) | 10.0 c | 38.8 min | 775 | 26,340 |
| [**PUD No 1 of Lewis County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-lewis-county-wa-10944/) | 10.08 c | 662.8 min | 343 | 29,779 |
| [**PUD No 1 of Clallam County**](https://epri-peac.com/utilities/wa-pud-no-1-of-clallam-county-3644/) | 12.14 c | — | 654 | 30,934 |
| [**PUD No 3 of Mason County**](https://epri-peac.com/utilities/wa-pud-no-3-of-mason-county-15419/) | 14.45 c | — | 282 | 34,378 |

What to Check & Best-Fit Scenarios

## What Should PUD No 1 of Franklin County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for PUD No 1 of Franklin County (Political Subdivision, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside PUD No 1 of Franklin County (WA) shift real bills away from 9.99 c/kWh.
- Outage clustering: Major Event Days skew PUD No 1 of Franklin County annual minutes differently than routine non-storm reliability.

### PUD No 1 of Franklin County Solar & Battery Evaluators

Compare your actual PUD No 1 of Franklin County monthly kWh statement against 9.99 c/kWh and verify current export tariffs in WA.

### PUD No 1 of Franklin County Outage & Generator Planners

Use PUD No 1 of Franklin County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for PUD No 1 of Franklin County (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is PUD No 1 of Franklin County's residential electricity rate and 2026 solar payback?

PUD No 1 of Franklin County averages 9.99 c/kWh (-3.18 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,079/yr (21.9-year payback).

### How reliable is PUD No 1 of Franklin County compared to peer Washington utilities?

PUD No 1 of Franklin County did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr); compare rates and outage history directly with City of Richland - (WA) (10.0 c/kWh) across Washington.

### Which counties and customers does PUD No 1 of Franklin County serve in Washington?

EIA-861 filings list 27,692 customers across 1 county including Franklin, with 923 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting PUD No 1 of Franklin County.

## Related Pages

Explore Washington energy benchmarks, City of Richland - (WA), county outage profiles, and NEC 705.12 tools alongside PUD No 1 of Franklin County.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.99 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)