title: "PUD No 1 of Cowlitz County (WA) Rate & SAIDI"
url: https://epri-peac.com/utilities/wa-pud-no-1-of-cowlitz-county-4442/
description: "2025 EIA-861 profile for PUD No 1 of Cowlitz County (WA): 9.23 c/kWh rate, SAIDI 218.7 min/yr, 554 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# PUD No 1 of Cowlitz County (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

PUD No 1 of Cowlitz County (EIA ID 4442, WA) serves 48,849 customers at 9.23 c/kWh (-3.94 c/kWh vs Washington average) with 218.7 min/yr SAIDI (3.65 hrs/yr) with 554 net-metered residential solar systems (1.13% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4442

- **Res. Rate** : 9.23 c/kWh

- **SAIDI (All Events)** : 218.7 min/yr

- **Net-Metered PV** : 554 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does PUD No 1 of Cowlitz County Compare on Tariffs and Reliability?

EIA-861 rate delta (-3.94 c/kWh vs Washington average), customer scale (48,849), and 2026 solar payback benchmarks for PUD No 1 of Cowlitz County.

Ranked #81 of 1,989 reporting US utilities for residential rate (top 4.1%; lower than 95.9% of peers), PUD No 1 of Cowlitz County serves 48,849 accounts in Washington (Political Subdivision). Commercial power averages 9.17 c/kWh. It recorded 218.7 SAIDI outage minutes (3.65 hrs/yr, rank #455 of 751 reporting utilities), with 554 net-metered residential solar systems (1.13% customer adoption).

## Where Does PUD No 1 of Cowlitz County Sit Across US Utility Rates?

Positions PUD No 1 of Cowlitz County (9.23 c/kWh) across 1,989 US electric utility residential tariffs. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does PUD No 1 of Cowlitz County Rank Across Cost & Reliability?

Percentile placement of PUD No 1 of Cowlitz County across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for PUD No 1 of Cowlitz County?

Four key EIA-861 rate, outage, and solar payback benchmarks for PUD No 1 of Cowlitz County (Political Subdivision) in Washington.

Lowest Rate #81 / 1,989

### 9.23 c/kWh (-3.94 vs WA)

Commercial avg: 9.17 c/kWh; Industrial: 5.28 c/kWh; est. residential bill $119.62/mo.

Reliability #455 / 751

### 218.7 min/yr (3.65 hrs)

46.9% (102.6 min) from Major Event Days; avg restore 170.3 min (~5.1 kWh @ 1.8 kW).

Post-25D Payback

### 23.7 Years @ 9.23 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$997/yr at 1,350 kWh/kW.

Distributed PV

### 554 Net-Metered Systems

5.32 MW residential PV (1.13% of customers) across 1 county; state FEMA declarations (2015-2026): 96.

PUD No 1 of Cowlitz County Reliability & Solar Offset Calculation

Backup_Energy = (170.3 min / 60) * 1.8 kW = 5.1 kWh/event | Solar_Offset = 10,800 kWh * $0.0923 = $997/yr

EIA-861 2025 Utility ID 4442: Rate=9.23 c/kWh, Cust=48,849, SAIDI=218.7 min, PV=554.

**Result:** 3.65 outage hrs/yr; 23.7 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for PUD No 1 of Cowlitz County?

Complete Form EIA-861 filing summary for PUD No 1 of Cowlitz County (ID 4442) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for PUD No 1 of Cowlitz County (Utility ID 4442).

| EIA Utility ID & BA Code | ID 4442 · BPAT |
|---|---|
| State & Ownership Type | WA · Political Subdivision |
| Retail Electricity Rates | 9.23 c/kWh Res · 9.17 c Comm · 5.28 c Ind |
| Avg Monthly Usage & Bill | 1,296.4 kWh/mo ($119.62/mo est.) |
| SAIDI (All Events w/ MED) | 218.7 min/yr (3.65 hrs/yr) |
| SAIDI (Without Major Events) | 116.1 min/yr (Storm share: 46.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.284 /yr · 170.3 min restore |
| Residential Net-Metered PV | 554 systems (5.32 MW) |
| Counties Served (Sample) | 1 county (Cowlitz) |

## Which Peer Electric Utilities Operate in WA?

Compare PUD No 1 of Cowlitz County directly with PUD No 1 of Benton County and nearby Washington electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**PUD No 1 of Benton County**](https://epri-peac.com/utilities/wa-pud-no-1-of-benton-county-1579/) | 9.13 c | 36.1 min | 1,304 | 50,835 |
| [**PUD No 2 of Grant County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-2-of-grant-county-wa-14624/) | 6.17 c | — | 171 | 43,160 |
| [**PUD No 1 of Chelan County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-chelan-county-wa-3413/) | 3.78 c | 327.1 min | 101 | 42,571 |
| [**Inland Power & Light Company**](https://epri-peac.com/utilities/wa-inland-power-light-company-8699/) | 9.56 c | 536.0 min | 663 | 42,351 |

What to Check & Best-Fit Scenarios

## What Should PUD No 1 of Cowlitz County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for PUD No 1 of Cowlitz County (Political Subdivision, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether PUD No 1 of Cowlitz County acts as a wires-only TDU or bundled utility in WA.
- Transformer limits: PUD No 1 of Cowlitz County interconnection engineering still checks neighborhood transformer kVA regardless of 218.7 SAIDI.

### PUD No 1 of Cowlitz County Solar & Battery Evaluators

Compare your actual PUD No 1 of Cowlitz County monthly kWh statement against 9.23 c/kWh and verify current export tariffs in WA.

### PUD No 1 of Cowlitz County Outage & Generator Planners

Use PUD No 1 of Cowlitz County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for PUD No 1 of Cowlitz County (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is PUD No 1 of Cowlitz County's residential electricity rate and 2026 solar payback?

PUD No 1 of Cowlitz County averages 9.23 c/kWh (-3.94 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$997/yr (23.7-year payback).

### How reliable is PUD No 1 of Cowlitz County compared to peer Washington utilities?

PUD No 1 of Cowlitz County recorded 218.7 SAIDI outage minutes (3.65 hrs/yr, rank #455 of 751 reporting utilities); compare rates and outage history directly with PUD No 1 of Benton County (9.13 c/kWh) across Washington.

### Which counties and customers does PUD No 1 of Cowlitz County serve in Washington?

EIA-861 filings list 48,849 customers across 1 county including Cowlitz, with 554 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting PUD No 1 of Cowlitz County.

## Related Pages

Explore Washington energy benchmarks, PUD No 1 of Benton County, county outage profiles, and NEC 705.12 tools alongside PUD No 1 of Cowlitz County.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.23 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)