# PUD No 1 of Clallam County (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

PUD No 1 of Clallam County (EIA ID 3644, WA) serves 30,934 customers at 12.14 c/kWh (-1.03 c/kWh vs Washington average) with no standalone IEEE SAIDI filing (2 counties served) with 654 net-metered residential solar systems (2.11% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3644

- **Res. Rate** : 12.14 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 654 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does PUD No 1 of Clallam County Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.03 c/kWh vs Washington average), customer scale (30,934), and 2026 solar payback benchmarks for PUD No 1 of Clallam County.

Serving 30,934 customers across 2 counties including Clallam, Jefferson in Washington, PUD No 1 of Clallam County (Political Subdivision, Balancing Authority BPAT) offers a low 12.14 c/kWh residential rate (-6.40 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.0 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr), with 654 net-metered residential solar systems (2.11% customer adoption).

## Where Does PUD No 1 of Clallam County Sit Across US Utility Rates?

Positions PUD No 1 of Clallam County (12.14 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does PUD No 1 of Clallam County Rank Across Cost & Reliability?

Percentile placement of PUD No 1 of Clallam County across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for PUD No 1 of Clallam County?

Four key EIA-861 rate, outage, and solar payback benchmarks for PUD No 1 of Clallam County (Political Subdivision) in Washington.

Lowest Rate #423 / 1,989

### 12.14 c/kWh (-1.03 vs WA)

Commercial avg: 10.0 c/kWh; Industrial: 7.73 c/kWh; est. residential bill $150.68/mo.

State Reliability Context

### 380.8 min/yr (WA Avg)

Utility did not file separate IEEE SAIDI in 2025; Washington customer-weighted SAIDI is 380.8 min/yr.

Post-25D Payback

### 18.0 Years @ 12.14 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,311/yr at 1,350 kWh/kW.

Distributed PV

### 654 Net-Metered Systems

5.193 MW residential PV (2.11% of customers) across 2 counties; state FEMA declarations (2015-2026): 96.

PUD No 1 of Clallam County Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1214 = $1,311/yr

EIA-861 2025 Utility ID 3644: Rate=12.14 c/kWh, Cust=30,934, PV=654.

**Result:** 18.0 yr 8 kW cash payback at 12.14 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for PUD No 1 of Clallam County?

Complete Form EIA-861 filing summary for PUD No 1 of Clallam County (ID 3644) covering sales, PV, and counties.

Form EIA-861 2025 filing metrics for PUD No 1 of Clallam County (Utility ID 3644).

| EIA Utility ID & BA Code | ID 3644 · BPAT |
|---|---|
| State & Ownership Type | WA · Political Subdivision |
| Retail Electricity Rates | 12.14 c/kWh Res · 10.0 c Comm · 7.73 c Ind |
| Avg Monthly Usage & Bill | 1,241.6 kWh/mo ($150.68/mo est.) |
| Residential Net-Metered PV | 654 systems (5.193 MW) |
| Counties Served (Sample) | 2 counties (Clallam, Jefferson) |

## Which Peer Electric Utilities Operate in WA?

Compare PUD No 1 of Clallam County directly with PUD No 1 of Lewis County - (WA) and nearby Washington electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**PUD No 1 of Lewis County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-lewis-county-wa-10944/) | 10.08 c | 662.8 min | 343 | 29,779 |
| [**PUD No 1 of Franklin County**](https://epri-peac.com/utilities/wa-pud-no-1-of-franklin-county-6716/) | 9.99 c | — | 923 | 27,692 |
| [**PUD No 3 of Mason County**](https://epri-peac.com/utilities/wa-pud-no-3-of-mason-county-15419/) | 14.45 c | — | 282 | 34,378 |
| [**City of Richland - (WA)**](https://epri-peac.com/utilities/wa-city-of-richland-wa-15979/) | 10.0 c | 38.8 min | 775 | 26,340 |

What to Check & Best-Fit Scenarios

## What Should PUD No 1 of Clallam County Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for PUD No 1 of Clallam County (Political Subdivision, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: PUD No 1 of Clallam County's 12.14 c/kWh blended residential rate in WA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: PUD No 1 of Clallam County system-wide SAIDI averages rural and urban circuits across its WA territory or nearby PUD No 1 of Lewis County - (WA).

### PUD No 1 of Clallam County Solar & Battery Evaluators

Compare your actual PUD No 1 of Clallam County monthly kWh statement against 12.14 c/kWh and verify current export tariffs in WA.

### PUD No 1 of Clallam County Outage & Generator Planners

Use PUD No 1 of Clallam County's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for PUD No 1 of Clallam County (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is PUD No 1 of Clallam County's residential electricity rate and 2026 solar payback?

PUD No 1 of Clallam County averages 12.14 c/kWh (-1.03 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,311/yr (18.0-year payback).

### How reliable is PUD No 1 of Clallam County compared to peer Washington utilities?

PUD No 1 of Clallam County did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr); compare rates and outage history directly with PUD No 1 of Lewis County - (WA) (10.08 c/kWh) across Washington.

### Which counties and customers does PUD No 1 of Clallam County serve in Washington?

EIA-861 filings list 30,934 customers across 2 counties including Clallam, Jefferson, with 654 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting PUD No 1 of Clallam County.

## Related Pages

Explore Washington energy benchmarks, PUD No 1 of Lewis County - (WA), county outage profiles, and NEC 705.12 tools alongside PUD No 1 of Clallam County.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.14 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)