---
title: "Peninsula Light Company (WA) Rate & SAIDI"
url: https://epri-peac.com/utilities/wa-peninsula-light-company-14668/
description: "2025 EIA-861 profile for Peninsula Light Company (WA): 11.3 c/kWh rate, SAIDI 744.5 min/yr, 359 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Peninsula Light Company (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Peninsula Light Company (EIA ID 14668, WA) serves 35,595 customers at 11.3 c/kWh (-1.87 c/kWh vs Washington average) with 744.5 min/yr SAIDI (12.41 hrs/yr) with 359 net-metered residential solar systems (1.01% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14668

- **Res. Rate** : 11.3 c/kWh

- **SAIDI (All Events)** : 744.5 min/yr

- **Net-Metered PV** : 359 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Peninsula Light Company Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.87 c/kWh vs Washington average), customer scale (35,595), and 2026 solar payback benchmarks for Peninsula Light Company.

Ranked #280 of 1,989 reporting US utilities for residential rate (top 14.1%; lower than 85.9% of peers), Peninsula Light Company serves 35,595 accounts in Washington (Cooperative). Commercial power averages 7.92 c/kWh. It logged 744.5 SAIDI outage minutes (12.41 hrs/yr, 86.9% storm-driven), making battery backup or a standby ATS worthwhile, with 359 net-metered residential solar systems (1.01% customer adoption).

## Where Does Peninsula Light Company Sit Across US Utility Rates?

Positions Peninsula Light Company (11.3 c/kWh) across 1,989 US electric utility residential tariffs. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## How Does Peninsula Light Company Rank Across Cost & Reliability?

Percentile placement of Peninsula Light Company across retail kWh electricity cost and IEEE grid reliability outage metrics. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Peninsula Light Company?

Four key EIA-861 rate, outage, and solar payback benchmarks for Peninsula Light Company (Cooperative) in Washington. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #280 / 1,989

### 11.3 c/kWh (-1.87 vs WA)

Commercial avg: 7.92 c/kWh; est. residential bill $138.35/mo.

Reliability #684 / 751

### 744.5 min/yr (12.41 hrs)

86.9% (646.8 min) from Major Event Days; avg restore 175.6 min (~5.3 kWh @ 1.8 kW).

Post-25D Payback

### 19.3 Years @ 11.3 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,220/yr at 1,350 kWh/kW.

Distributed PV

### 359 Net-Metered Systems

3.173 MW residential PV (1.01% of customers) across 2 counties; state FEMA declarations (2015-2026): 96.

Peninsula Light Company Reliability & Solar Offset Calculation

Backup_Energy = (175.6 min / 60) * 1.8 kW = 5.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1130 = $1,220/yr

EIA-861 2025 Utility ID 14668: Rate=11.3 c/kWh, Cust=35,595, SAIDI=744.5 min, PV=359.

**Result:** 12.41 outage hrs/yr; 19.3 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Peninsula Light Company?

Complete Form EIA-861 filing summary for Peninsula Light Company (ID 14668) covering sales, PV, and counties. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for Peninsula Light Company (Utility ID 14668).

| EIA Utility ID & BA Code | ID 14668 · BPAT |
|---|---|
| State & Ownership Type | WA · Cooperative |
| Retail Electricity Rates | 11.3 c/kWh Res · 7.92 c Comm |
| Avg Monthly Usage & Bill | 1,224.0 kWh/mo ($138.35/mo est.) |
| SAIDI (All Events w/ MED) | 744.5 min/yr (12.41 hrs/yr) |
| SAIDI (Without Major Events) | 97.7 min/yr (Storm share: 86.9%) |
| SAIFI & CAIDI (Per-Outage Avg) | 4.24 /yr · 175.6 min restore |
| Residential Net-Metered PV | 359 systems (3.173 MW) |
| Counties Served (Sample) | 2 counties (Kitsap, Pierce) |

## Which Peer Electric Utilities Operate in WA?

Compare Peninsula Light Company directly with PUD No 3 of Mason County and nearby Washington electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**PUD No 3 of Mason County**](https://epri-peac.com/utilities/wa-pud-no-3-of-mason-county-15419/) | 14.45 c | — | 282 | 34,378 |
| [**PUD No 1 of Grays Harbor County**](https://epri-peac.com/utilities/wa-pud-no-1-of-grays-harbor-county-7548/) | 12.69 c | 1,036.0 min | 343 | 40,116 |
| [**PUD No 1 of Clallam County**](https://epri-peac.com/utilities/wa-pud-no-1-of-clallam-county-3644/) | 12.14 c | — | 654 | 30,934 |
| [**PUD No 1 of Lewis County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-lewis-county-wa-10944/) | 10.08 c | 662.8 min | 343 | 29,779 |

What to Check & Best-Fit Scenarios

## What Should Peninsula Light Company Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Peninsula Light Company (Cooperative, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Peninsula Light Company acts as a wires-only TDU or bundled utility in WA.
- Transformer limits: Peninsula Light Company interconnection engineering still checks neighborhood transformer kVA regardless of 744.5 SAIDI.

### Peninsula Light Company Solar & Battery Evaluators

Compare your actual Peninsula Light Company monthly kWh statement against 11.3 c/kWh and verify current export tariffs in WA.

### Peninsula Light Company Outage & Generator Planners

Use Peninsula Light Company's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Peninsula Light Company (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

### What is Peninsula Light Company's residential electricity rate and 2026 solar payback?

Peninsula Light Company averages 11.3 c/kWh (-1.87 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,220/yr (19.3-year payback).

### How reliable is Peninsula Light Company compared to peer Washington utilities?

Peninsula Light Company logged 744.5 SAIDI outage minutes (12.41 hrs/yr, 86.9% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with PUD No 3 of Mason County (14.45 c/kWh) across Washington.

### Which counties and customers does Peninsula Light Company serve in Washington?

EIA-861 filings list 35,595 customers across 2 counties including Kitsap, Pierce, with 359 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Peninsula Light Company.

## Related Pages

Explore Washington energy benchmarks, PUD No 3 of Mason County, county outage profiles, and NEC 705.12 tools alongside Peninsula Light Company.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.3 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
