---
title: "Modern Electric Water Company (WA) Rate & SAIDI"
url: https://epri-peac.com/utilities/wa-modern-electric-water-company-12744/
description: "2025 EIA-861 profile for Modern Electric Water Company (WA): 7.67 c/kWh rate, SAIDI Not reported in EIA-861, 33 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Modern Electric Water Company (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Modern Electric Water Company (EIA ID 12744, WA) serves 9,504 customers at 7.67 c/kWh (-5.50 c/kWh vs Washington average) with no standalone IEEE SAIDI filing (1 county served) with 33 net-metered residential solar systems (0.35% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12744

- **Res. Rate** : 7.67 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 33 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Modern Electric Water Company Compare on Tariffs and Reliability?

How Modern Electric Water Company (Cooperative) performs across 1 county on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Modern Electric Water Company (Cooperative) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr). Typical residential meters drew 909.5 kWh/mo ($69.72/mo) in 2025, while its tariff offers a low 7.67 c/kWh residential rate (-10.87 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 28.5 years without federal 25D—compare rates directly with City of Port Angeles - (WA) (10.21 c/kWh).

## Where Does Modern Electric Water Company Sit Across US Utility Rates?

National utility tariff curve marking Modern Electric Water Company at 7.67 c/kWh vs. 18.54 c/kWh US mean.

## How Does Modern Electric Water Company Rank Across Cost & Reliability?

Relative ranking of Modern Electric Water Company on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for Modern Electric Water Company?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Modern Electric Water Company in Washington.

Lowest Rate #27 / 1,989

### 7.67 c/kWh (-5.50 vs WA)

Commercial avg: 7.16 c/kWh; Industrial: 6.94 c/kWh; est. residential bill $69.72/mo.

State Reliability Context

### 380.8 min/yr (WA Avg)

Utility did not file separate IEEE SAIDI in 2025; Washington customer-weighted SAIDI is 380.8 min/yr.

Post-25D Payback

### 28.5 Years @ 7.67 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$828/yr at 1,350 kWh/kW.

Distributed PV

### 33 Net-Metered Systems

0.204 MW residential PV (0.35% of customers) across 1 county; state FEMA declarations (2015-2026): 96.

Modern Electric Water Company Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.0767 = $828/yr

EIA-861 2025 Utility ID 12744: Rate=7.67 c/kWh, Cust=9,504, PV=33.

**Result:** 28.5 yr 8 kW cash payback at 7.67 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Modern Electric Water Company?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Modern Electric Water Company. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for Modern Electric Water Company (Utility ID 12744).

| EIA Utility ID & BA Code | ID 12744 · AVA |
|---|---|
| State & Ownership Type | WA · Cooperative |
| Retail Electricity Rates | 7.67 c/kWh Res · 7.16 c Comm · 6.94 c Ind |
| Avg Monthly Usage & Bill | 909.5 kWh/mo ($69.72/mo est.) |
| Residential Net-Metered PV | 33 systems (0.204 MW) |
| Counties Served (Sample) | 1 county (Spokane) |

## Which Peer Electric Utilities Operate in WA?

Nearby Washington electric utilities of comparable customer size led by City of Port Angeles - (WA) (10.21 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Port Angeles - (WA)**](https://epri-peac.com/utilities/wa-city-of-port-angeles-wa-15231/) | 10.21 c | — | 152 | 9,394 |
| [**PUD No 1 of Pend Oreille County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-pend-oreille-county-wa-14653/) | 8.96 c | — | 37 | 9,209 |
| [**City of Centralia - (WA)**](https://epri-peac.com/utilities/wa-city-of-centralia-wa-3295/) | 9.91 c | 143.4 min | 126 | 9,118 |
| [**City of Ellensburg - (WA)**](https://epri-peac.com/utilities/wa-city-of-ellensburg-wa-6149/) | 11.07 c | — | 189 | 8,846 |

What to Check & Best-Fit Scenarios

## What Should Modern Electric Water Company Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Modern Electric Water Company (Cooperative, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Modern Electric Water Company (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in WA.
- Export credit rules: check Modern Electric Water Company's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Modern Electric Water Company Solar & Battery Evaluators

Compare your actual Modern Electric Water Company monthly kWh statement against 7.67 c/kWh and verify current export tariffs in WA.

### Modern Electric Water Company Outage & Generator Planners

Use Modern Electric Water Company's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Modern Electric Water Company (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Modern Electric Water Company's residential electricity rate and 2026 solar payback?

Modern Electric Water Company averages 7.67 c/kWh (-5.50 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$828/yr (28.5-year payback).

### How reliable is Modern Electric Water Company compared to peer Washington utilities?

Modern Electric Water Company did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 380.8 min/yr); compare rates and outage history directly with City of Port Angeles - (WA) (10.21 c/kWh) across Washington.

### Which counties and customers does Modern Electric Water Company serve in Washington?

EIA-861 filings list 9,504 customers across 1 county including Spokane, with 33 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Modern Electric Water Company.

## Related Pages

Explore Washington energy benchmarks, City of Port Angeles - (WA), county outage profiles, and NEC 705.12 tools alongside Modern Electric Water Company.

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 7.67 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
