---
title: "City of Centralia - (WA) (WA) Rate & SAIDI"
url: https://epri-peac.com/utilities/wa-city-of-centralia-wa-3295/
description: "2025 EIA-861 profile for City of Centralia - (WA) (WA): 9.91 c/kWh rate, SAIDI 143.4 min/yr, 126 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Centralia - (WA) (WA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Centralia - (WA) (EIA ID 3295, WA) serves 9,118 customers at 9.91 c/kWh (-3.26 c/kWh vs Washington average) with 143.4 min/yr SAIDI (2.39 hrs/yr) with 126 net-metered residential solar systems (1.38% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3295

- **Res. Rate** : 9.91 c/kWh

- **SAIDI (All Events)** : 143.4 min/yr

- **Net-Metered PV** : 126 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Centralia - (WA) Compare on Tariffs and Reliability?

EIA-861 rate delta (-3.26 c/kWh vs Washington average), customer scale (9,118), and 2026 solar payback benchmarks for City of Centralia - (WA).

Ranked #128 of 1,989 reporting US utilities for residential rate (top 6.4%; lower than 93.6% of peers), City of Centralia - (WA) serves 9,118 accounts in Washington (Municipal). Commercial power averages 11.61 c/kWh. It recorded 143.4 SAIDI outage minutes (2.39 hrs/yr, rank #321 of 751 reporting utilities), with 126 net-metered residential solar systems (1.38% customer adoption).

## Where Does City of Centralia - (WA) Sit Across US Utility Rates?

Positions City of Centralia - (WA) (9.91 c/kWh) across 1,989 US electric utility residential tariffs. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does City of Centralia - (WA) Rank Across Cost & Reliability?

Percentile placement of City of Centralia - (WA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Centralia - (WA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Centralia - (WA) (Municipal) in Washington. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Lowest Rate #128 / 1,989

### 9.91 c/kWh (-3.26 vs WA)

Commercial avg: 11.61 c/kWh; Industrial: 9.8 c/kWh; est. residential bill $110.85/mo.

Reliability #321 / 751

### 143.4 min/yr (2.39 hrs)

33.5% (48.1 min) from Major Event Days; avg restore 208.8 min (~6.3 kWh @ 1.8 kW).

Post-25D Payback

### 22.1 Years @ 9.91 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,070/yr at 1,350 kWh/kW.

Distributed PV

### 126 Net-Metered Systems

1.019 MW residential PV (1.38% of customers) across 2 counties; state FEMA declarations (2015-2026): 96.

City of Centralia - (WA) Reliability & Solar Offset Calculation

Backup_Energy = (208.8 min / 60) * 1.8 kW = 6.3 kWh/event | Solar_Offset = 10,800 kWh * $0.0991 = $1,070/yr

EIA-861 2025 Utility ID 3295: Rate=9.91 c/kWh, Cust=9,118, SAIDI=143.4 min, PV=126.

**Result:** 2.39 outage hrs/yr; 22.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Centralia - (WA)?

Complete Form EIA-861 filing summary for City of Centralia - (WA) (ID 3295) covering sales, PV, and counties. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Centralia - (WA) (Utility ID 3295).

| EIA Utility ID & BA Code | ID 3295 · BPAT |
|---|---|
| State & Ownership Type | WA · Municipal |
| Retail Electricity Rates | 9.91 c/kWh Res · 11.61 c Comm · 9.8 c Ind |
| Avg Monthly Usage & Bill | 1,118.1 kWh/mo ($110.85/mo est.) |
| SAIDI (All Events w/ MED) | 143.4 min/yr (2.39 hrs/yr) |
| SAIDI (Without Major Events) | 95.3 min/yr (Storm share: 33.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.687 /yr · 208.8 min restore |
| Residential Net-Metered PV | 126 systems (1.019 MW) |
| Counties Served (Sample) | 2 counties (Lewis, Thurston) |

## Which Peer Electric Utilities Operate in WA?

Compare City of Centralia - (WA) directly with PUD No 1 of Pend Oreille County - (WA) and nearby Washington electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**PUD No 1 of Pend Oreille County - (WA)**](https://epri-peac.com/utilities/wa-pud-no-1-of-pend-oreille-county-wa-14653/) | 8.96 c | — | 37 | 9,209 |
| [**City of Ellensburg - (WA)**](https://epri-peac.com/utilities/wa-city-of-ellensburg-wa-6149/) | 11.07 c | — | 189 | 8,846 |
| [**City of Port Angeles - (WA)**](https://epri-peac.com/utilities/wa-city-of-port-angeles-wa-15231/) | 10.21 c | — | 152 | 9,394 |
| [**Modern Electric Water Company**](https://epri-peac.com/utilities/wa-modern-electric-water-company-12744/) | 7.67 c | — | 33 | 9,504 |

What to Check & Best-Fit Scenarios

## What Should City of Centralia - (WA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Centralia - (WA) (Municipal, WA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Centralia - (WA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in WA.
- Export credit rules: check City of Centralia - (WA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Centralia - (WA) Solar & Battery Evaluators

Compare your actual City of Centralia - (WA) monthly kWh statement against 9.91 c/kWh and verify current export tariffs in WA.

### City of Centralia - (WA) Outage & Generator Planners

Use City of Centralia - (WA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Centralia - (WA) (Washington) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Centralia - (WA)'s residential electricity rate and 2026 solar payback?

City of Centralia - (WA) averages 9.91 c/kWh (-3.26 c/kWh vs Washington average vs. Washington). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,070/yr (22.1-year payback).

### How reliable is City of Centralia - (WA) compared to peer Washington utilities?

City of Centralia - (WA) recorded 143.4 SAIDI outage minutes (2.39 hrs/yr, rank #321 of 751 reporting utilities); compare rates and outage history directly with PUD No 1 of Pend Oreille County - (WA) (8.96 c/kWh) across Washington.

### Which counties and customers does City of Centralia - (WA) serve in Washington?

EIA-861 filings list 9,118 customers across 2 counties including Lewis, Thurston, with 126 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Centralia - (WA).

## Related Pages

Explore Washington energy benchmarks, PUD No 1 of Pend Oreille County - (WA), county outage profiles, and NEC 705.12 tools alongside City of Centralia - (WA).

[Washington State Energy Rates & Utilities](https://epri-peac.com/states/washington/) [All Washington County Power & Outage Profiles](https://epri-peac.com/counties/washington/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 9.91 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
