title: "City of Burlington Electric (VT) Rate & SAIDI"
url: https://epri-peac.com/utilities/vt-city-of-burlington-electric-vt-2548/
description: "2025 EIA-861 profile for City of Burlington Electric - (VT) (VT): 19.8 c/kWh rate, SAIDI Not reported in EIA-861, 341 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# City of Burlington Electric - (VT) (VT) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Burlington Electric - (VT) (EIA ID 2548, VT) serves 17,974 customers at 19.8 c/kWh (-2.99 c/kWh vs Vermont average) with no standalone IEEE SAIDI filing (1 county served) with 341 net-metered residential solar systems (1.9% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 2548

- **Res. Rate** : 19.8 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 341 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Burlington Electric - (VT) Compare on Tariffs and Reliability?

How City of Burlington Electric - (VT) (Municipal) performs across 1 county on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Across 1 county including Chittenden, City of Burlington Electric - (VT) bills residential power at 19.8 c/kWh (-2.99 c/kWh vs Vermont average vs. Vermont), offsetting ~$2,138/yr on an 8 kW array compared to peer Sunrun Inc. (29.48 c/kWh). With 17,974 customer accounts (Municipal), 2025 Form EIA-861 shows City of Burlington Electric - (VT) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 251.3 min/yr), with 341 net-metered residential solar systems (1.9% customer adoption).

## Where Does City of Burlington Electric - (VT) Sit Across US Utility Rates?

National utility tariff curve marking City of Burlington Electric - (VT) at 19.8 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Burlington Electric - (VT) Rank Across Cost & Reliability?

Relative ranking of City of Burlington Electric - (VT) on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for City of Burlington Electric - (VT)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Burlington Electric - (VT) in Vermont.

Lowest Rate #1,768 / 1,989

### 19.8 c/kWh (-2.99 vs VT)

Commercial avg: 18.78 c/kWh; Industrial: 14.32 c/kWh; est. residential bill $84.81/mo.

State Reliability Context

### 251.3 min/yr (VT Avg)

Utility did not file separate IEEE SAIDI in 2025; Vermont customer-weighted SAIDI is 251.3 min/yr.

Post-25D Payback

### 11.0 Years @ 19.8 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$2,138/yr at 1,350 kWh/kW.

Distributed PV

### 341 Net-Metered Systems

1.888 MW residential PV (1.9% of customers) across 1 county; state FEMA declarations (2015-2026): 21.

City of Burlington Electric - (VT) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1980 = $2,138/yr

EIA-861 2025 Utility ID 2548: Rate=19.8 c/kWh, Cust=17,974, PV=341.

**Result:** 11.0 yr 8 kW cash payback at 19.8 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Burlington Electric - (VT)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Burlington Electric - (VT). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for City of Burlington Electric - (VT) (Utility ID 2548).

| EIA Utility ID & BA Code | ID 2548 · ISNE |
|---|---|
| State & Ownership Type | VT · Municipal |
| Retail Electricity Rates | 19.8 c/kWh Res · 18.78 c Comm · 14.32 c Ind |
| Avg Monthly Usage & Bill | 428.4 kWh/mo ($84.81/mo est.) |
| Residential Net-Metered PV | 341 systems (1.888 MW) |
| Counties Served (Sample) | 1 county (Chittenden) |

## Which Peer Electric Utilities Operate in VT?

Nearby Vermont electric utilities of comparable customer size led by Sunrun Inc. (29.48 c/kWh). Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Sunrun Inc.**](https://epri-peac.com/utilities/vt-sunrun-inc-59647/) | 29.48 c | — | 0 | 2,561 |
| [**Tesla Inc.**](https://epri-peac.com/utilities/vt-tesla-inc-57313/) | 20.62 c | — | 0 | 1,578 |
| [**Ahana Renewables, LLC**](https://epri-peac.com/utilities/vt-ahana-renewables-llc-59622/) | 27.76 c | — | 0 | 495 |
| [**SunPower Capital, LLC**](https://epri-peac.com/utilities/vt-sunpower-capital-llc-59580/) | 38.8 c | — | 0 | 323 |

What to Check & Best-Fit Scenarios

## What Should City of Burlington Electric - (VT) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Burlington Electric - (VT) (Municipal, VT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Burlington Electric - (VT) (VT) shift real bills away from 19.8 c/kWh.
- Outage clustering: Major Event Days skew City of Burlington Electric - (VT) annual minutes differently than routine non-storm reliability.

### City of Burlington Electric - (VT) Solar & Battery Evaluators

Compare your actual City of Burlington Electric - (VT) monthly kWh statement against 19.8 c/kWh and verify current export tariffs in VT.

### City of Burlington Electric - (VT) Outage & Generator Planners

Use City of Burlington Electric - (VT)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Burlington Electric - (VT) (Vermont) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Burlington Electric - (VT)'s residential electricity rate and 2026 solar payback?

City of Burlington Electric - (VT) averages 19.8 c/kWh (-2.99 c/kWh vs Vermont average vs. Vermont). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$2,138/yr (11.0-year payback).

### How reliable is City of Burlington Electric - (VT) compared to peer Vermont utilities?

City of Burlington Electric - (VT) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 251.3 min/yr); compare rates and outage history directly with Sunrun Inc. (29.48 c/kWh) across Vermont.

### Which counties and customers does City of Burlington Electric - (VT) serve in Vermont?

EIA-861 filings list 17,974 customers across 1 county including Chittenden, with 341 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Burlington Electric - (VT).

## Related Pages

Explore Vermont energy benchmarks, Sunrun Inc., county outage profiles, and NEC 705.12 tools alongside City of Burlington Electric - (VT).

[Vermont State Energy Rates & Utilities](https://epri-peac.com/states/vermont/) [All Vermont County Power & Outage Profiles](https://epri-peac.com/counties/vermont/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 19.8 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)