# Prince George Electric Coop (VA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Prince George Electric Coop (EIA ID 15410, VA) serves 10,917 customers at 13.52 c/kWh (-1.76 c/kWh vs Virginia average) with 383.3 min/yr SAIDI (6.39 hrs/yr) with 185 net-metered residential solar systems (1.69% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 15410

- **Res. Rate** : 13.52 c/kWh

- **SAIDI (All Events)** : 383.3 min/yr

- **Net-Metered PV** : 185 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Prince George Electric Coop Compare on Tariffs and Reliability?

How Prince George Electric Coop (Cooperative) performs across 6 counties on kWh rates and outage resilience. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Prince George Electric Coop (Cooperative) logged 383.3 SAIDI outage minutes (6.39 hrs/yr, 42.0% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 1,393.6 kWh/mo ($188.36/mo) in 2025, while its tariff bills residential power at 13.52 c/kWh (-1.76 c/kWh vs Virginia average vs. Virginia), offsetting ~$1,460/yr on an 8 kW array—compare rates directly with City of Salem - (VA) (15.51 c/kWh).

## Where Does Prince George Electric Coop Sit Across US Utility Rates?

National utility tariff curve marking Prince George Electric Coop at 13.52 c/kWh vs. 18.54 c/kWh US mean.

## How Does Prince George Electric Coop Rank Across Cost & Reliability?

Relative ranking of Prince George Electric Coop on residential electricity pricing and annual IEEE SAIDI outage duration. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## What Do EIA-861 Benchmarks Show for Prince George Electric Coop?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Prince George Electric Coop in Virginia.

Lowest Rate #817 / 1,989

### 13.52 c/kWh (-1.76 vs VA)

Commercial avg: 12.41 c/kWh; Industrial: 10.7 c/kWh; est. residential bill $188.36/mo.

Reliability #581 / 751

### 383.3 min/yr (6.39 hrs)

42.0% (161.1 min) from Major Event Days.

Post-25D Payback

### 16.2 Years @ 13.52 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,460/yr at 1,350 kWh/kW.

Distributed PV

### 185 Net-Metered Systems

1.288 MW residential PV (1.69% of customers) across 6 counties; state FEMA declarations (2015-2026): 15.

Prince George Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1352 = $1,460/yr

EIA-861 2025 Utility ID 15410: Rate=13.52 c/kWh, Cust=10,917, SAIDI=383.3 min, PV=185.

**Result:** 6.39 outage hrs/yr; 16.2 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Prince George Electric Coop?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Prince George Electric Coop. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for Prince George Electric Coop (Utility ID 15410).

| EIA Utility ID & BA Code | ID 15410 · PJM |
|---|---|
| State & Ownership Type | VA · Cooperative |
| Retail Electricity Rates | 13.52 c/kWh Res · 12.41 c Comm · 10.7 c Ind |
| Avg Monthly Usage & Bill | 1,393.6 kWh/mo ($188.36/mo est.) |
| SAIDI (All Events w/ MED) | 383.3 min/yr (6.39 hrs/yr) |
| SAIDI (Without Major Events) | 222.2 min/yr (Storm share: 42.0%) |
| Residential Net-Metered PV | 185 systems (1.288 MW) |
| Counties Served (Sample) | 6 counties (Dinwiddie, Isle of Wight, Prince George, Southampton, Surry, Sussex) |

## Which Peer Electric Utilities Operate in VA?

Nearby Virginia electric utilities of comparable customer size led by City of Salem - (VA) (15.51 c/kWh). Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Salem - (VA)**](https://epri-peac.com/utilities/va-city-of-salem-va-16558/) | 15.51 c | 27.6 min | 113 | 11,426 |
| [**Bristol Virginia Utilities**](https://epri-peac.com/utilities/va-bristol-virginia-utilities-2248/) | 11.62 c | 25.3 min | 0 | 13,648 |
| [**City of Manassas - (VA)**](https://epri-peac.com/utilities/va-city-of-manassas-va-11560/) | 12.31 c | 76.4 min | 0 | 13,945 |
| [**Powell Valley Electric Coop**](https://epri-peac.com/utilities/va-powell-valley-electric-coop-15293/) | 12.13 c | 180.2 min | 0 | 6,571 |

What to Check & Best-Fit Scenarios

## What Should Prince George Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Prince George Electric Coop (Cooperative, VA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Prince George Electric Coop (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in VA.
- Export credit rules: check Prince George Electric Coop's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Prince George Electric Coop Solar & Battery Evaluators

Compare your actual Prince George Electric Coop monthly kWh statement against 13.52 c/kWh and verify current export tariffs in VA.

### Prince George Electric Coop Outage & Generator Planners

Use Prince George Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Prince George Electric Coop (Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Prince George Electric Coop's residential electricity rate and 2026 solar payback?

Prince George Electric Coop averages 13.52 c/kWh (-1.76 c/kWh vs Virginia average vs. Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,460/yr (16.2-year payback).

### How reliable is Prince George Electric Coop compared to peer Virginia utilities?

Prince George Electric Coop logged 383.3 SAIDI outage minutes (6.39 hrs/yr, 42.0% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Salem - (VA) (15.51 c/kWh) across Virginia.

### Which counties and customers does Prince George Electric Coop serve in Virginia?

EIA-861 filings list 10,917 customers across 6 counties including Dinwiddie, Isle of Wight, Prince George, with 185 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Prince George Electric Coop.

## Related Pages

Explore Virginia energy benchmarks, City of Salem - (VA), county outage profiles, and NEC 705.12 tools alongside Prince George Electric Coop.

[Virginia State Energy Rates & Utilities](https://epri-peac.com/states/virginia/) [All Virginia County Power & Outage Profiles](https://epri-peac.com/counties/virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.52 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)