---
title: "City of Salem - (VA) (VA) Rate & SAIDI"
url: https://epri-peac.com/utilities/va-city-of-salem-va-16558/
description: "2025 EIA-861 profile for City of Salem - (VA) (VA): 15.51 c/kWh rate, SAIDI 27.6 min/yr, 113 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Salem - (VA) (VA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Salem - (VA) (EIA ID 16558, VA) serves 11,426 customers at 15.51 c/kWh (+0.23 c/kWh vs Virginia average) with 27.6 min/yr SAIDI (0.46 hrs/yr) with 113 net-metered residential solar systems (0.99% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16558

- **Res. Rate** : 15.51 c/kWh

- **SAIDI (All Events)** : 27.6 min/yr

- **Net-Metered PV** : 113 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Salem - (VA) Compare on Tariffs and Reliability?

How City of Salem - (VA) (Municipal) performs across 2 counties on kWh rates and outage resilience. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Across 2 counties including Roanoke, Salem City, City of Salem - (VA) bills residential power at 15.51 c/kWh (+0.23 c/kWh vs Virginia average vs. Virginia), offsetting ~$1,675/yr on an 8 kW array compared to peer Prince George Electric Coop (13.52 c/kWh). With 11,426 customer accounts (Municipal), 2025 Form EIA-861 shows City of Salem - (VA) recorded 27.6 SAIDI outage minutes (0.46 hrs/yr, rank #59 of 751 reporting utilities), with 113 net-metered residential solar systems (0.99% customer adoption).

## Where Does City of Salem - (VA) Sit Across US Utility Rates?

National utility tariff curve marking City of Salem - (VA) at 15.51 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Salem - (VA) Rank Across Cost & Reliability?

Relative ranking of City of Salem - (VA) on residential electricity pricing and annual IEEE SAIDI outage duration. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for City of Salem - (VA)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Salem - (VA) in Virginia.

Lowest Rate #1,320 / 1,989

### 15.51 c/kWh (+0.23 vs VA)

Commercial avg: 15.47 c/kWh; Industrial: 13.78 c/kWh; est. residential bill $146.86/mo.

Reliability #59 / 751

### 27.6 min/yr (0.46 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 95.7 min (~2.9 kWh @ 1.8 kW).

Post-25D Payback

### 14.1 Years @ 15.51 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,675/yr at 1,350 kWh/kW.

Distributed PV

### 113 Net-Metered Systems

0.684 MW residential PV (0.99% of customers) across 2 counties; state FEMA declarations (2015-2026): 15.

City of Salem - (VA) Reliability & Solar Offset Calculation

Backup_Energy = (95.7 min / 60) * 1.8 kW = 2.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1551 = $1,675/yr

EIA-861 2025 Utility ID 16558: Rate=15.51 c/kWh, Cust=11,426, SAIDI=27.6 min, PV=113.

**Result:** 0.46 outage hrs/yr; 14.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Salem - (VA)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Salem - (VA). Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Salem - (VA) (Utility ID 16558).

| EIA Utility ID & BA Code | ID 16558 · PJM |
|---|---|
| State & Ownership Type | VA · Municipal |
| Retail Electricity Rates | 15.51 c/kWh Res · 15.47 c Comm · 13.78 c Ind |
| Avg Monthly Usage & Bill | 946.7 kWh/mo ($146.86/mo est.) |
| SAIDI (All Events w/ MED) | 27.6 min/yr (0.46 hrs/yr) |
| SAIDI (Without Major Events) | 27.6 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.288 /yr · 95.7 min restore |
| Residential Net-Metered PV | 113 systems (0.684 MW) |
| Counties Served (Sample) | 2 counties (Roanoke, Salem City) |

## Which Peer Electric Utilities Operate in VA?

Nearby Virginia electric utilities of comparable customer size led by Prince George Electric Coop (13.52 c/kWh). Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Prince George Electric Coop**](https://epri-peac.com/utilities/va-prince-george-electric-coop-15410/) | 13.52 c | 383.3 min | 185 | 10,917 |
| [**Bristol Virginia Utilities**](https://epri-peac.com/utilities/va-bristol-virginia-utilities-2248/) | 11.62 c | 25.3 min | 0 | 13,648 |
| [**City of Manassas - (VA)**](https://epri-peac.com/utilities/va-city-of-manassas-va-11560/) | 12.31 c | 76.4 min | 0 | 13,945 |
| [**Powell Valley Electric Coop**](https://epri-peac.com/utilities/va-powell-valley-electric-coop-15293/) | 12.13 c | 180.2 min | 0 | 6,571 |

What to Check & Best-Fit Scenarios

## What Should City of Salem - (VA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Salem - (VA) (Municipal, VA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Salem - (VA)'s 15.51 c/kWh blended residential rate in VA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Salem - (VA) system-wide SAIDI averages rural and urban circuits across its VA territory or nearby Prince George Electric Coop.

### City of Salem - (VA) Solar & Battery Evaluators

Compare your actual City of Salem - (VA) monthly kWh statement against 15.51 c/kWh and verify current export tariffs in VA.

### City of Salem - (VA) Outage & Generator Planners

Use City of Salem - (VA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Salem - (VA) (Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Salem - (VA)'s residential electricity rate and 2026 solar payback?

City of Salem - (VA) averages 15.51 c/kWh (+0.23 c/kWh vs Virginia average vs. Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,675/yr (14.1-year payback).

### How reliable is City of Salem - (VA) compared to peer Virginia utilities?

City of Salem - (VA) recorded 27.6 SAIDI outage minutes (0.46 hrs/yr, rank #59 of 751 reporting utilities); compare rates and outage history directly with Prince George Electric Coop (13.52 c/kWh) across Virginia.

### Which counties and customers does City of Salem - (VA) serve in Virginia?

EIA-861 filings list 11,426 customers across 2 counties including Roanoke, Salem City, with 113 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Salem - (VA).

## Related Pages

Explore Virginia energy benchmarks, Prince George Electric Coop, county outage profiles, and NEC 705.12 tools alongside City of Salem - (VA).

[Virginia State Energy Rates & Utilities](https://epri-peac.com/states/virginia/) [All Virginia County Power & Outage Profiles](https://epri-peac.com/counties/virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.51 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
