---
title: "City of Harrisonburg - (VA) (VA) Rate & SAIDI"
url: https://epri-peac.com/utilities/va-city-of-harrisonburg-va-8198/
description: "2025 EIA-861 profile for City of Harrisonburg - (VA) (VA): 11.51 c/kWh rate, SAIDI Not reported in EIA-861, 329 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# City of Harrisonburg - (VA) (VA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Harrisonburg - (VA) (EIA ID 8198, VA) serves 18,133 customers at 11.51 c/kWh (-3.77 c/kWh vs Virginia average) with no standalone IEEE SAIDI filing (1 county served) with 329 net-metered residential solar systems (1.81% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8198

- **Res. Rate** : 11.51 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 329 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Harrisonburg - (VA) Compare on Tariffs and Reliability?

EIA-861 rate delta (-3.77 c/kWh vs Virginia average), customer scale (18,133), and 2026 solar payback benchmarks for City of Harrisonburg - (VA).

Ranked #312 of 1,989 reporting US utilities for residential rate (top 15.9%; lower than 84.1% of peers), City of Harrisonburg - (VA) serves 18,133 accounts in Virginia (Municipal). Commercial power averages 10.36 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr), with 329 net-metered residential solar systems (1.81% customer adoption).

## Where Does City of Harrisonburg - (VA) Sit Across US Utility Rates?

Positions City of Harrisonburg - (VA) (11.51 c/kWh) across 1,989 US electric utility residential tariffs. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does City of Harrisonburg - (VA) Rank Across Cost & Reliability?

Percentile placement of City of Harrisonburg - (VA) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Harrisonburg - (VA)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Harrisonburg - (VA) (Municipal) in Virginia. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Lowest Rate #312 / 1,989

### 11.51 c/kWh (-3.77 vs VA)

Commercial avg: 10.36 c/kWh; Industrial: 8.59 c/kWh; est. residential bill $112.08/mo.

State Reliability Context

### 763.1 min/yr (VA Avg)

Utility did not file separate IEEE SAIDI in 2025; Virginia customer-weighted SAIDI is 763.1 min/yr.

Post-25D Payback

### 19.0 Years @ 11.51 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,243/yr at 1,350 kWh/kW.

Distributed PV

### 329 Net-Metered Systems

2.18 MW residential PV (1.81% of customers) across 1 county; state FEMA declarations (2015-2026): 15.

City of Harrisonburg - (VA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1151 = $1,243/yr

EIA-861 2025 Utility ID 8198: Rate=11.51 c/kWh, Cust=18,133, PV=329.

**Result:** 19.0 yr 8 kW cash payback at 11.51 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Harrisonburg - (VA)?

Complete Form EIA-861 filing summary for City of Harrisonburg - (VA) (ID 8198) covering sales, PV, and counties. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for City of Harrisonburg - (VA) (Utility ID 8198).

| EIA Utility ID & BA Code | ID 8198 · PJM |
|---|---|
| State & Ownership Type | VA · Municipal |
| Retail Electricity Rates | 11.51 c/kWh Res · 10.36 c Comm · 8.59 c Ind |
| Avg Monthly Usage & Bill | 973.6 kWh/mo ($112.08/mo est.) |
| Residential Net-Metered PV | 329 systems (2.18 MW) |
| Counties Served (Sample) | 1 county (Rockingham) |

## Which Peer Electric Utilities Operate in VA?

Compare City of Harrisonburg - (VA) directly with Northern Neck Elec Coop, Inc and nearby Virginia electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Northern Neck Elec Coop, Inc**](https://epri-peac.com/utilities/va-northern-neck-elec-coop-inc-13762/) | 16.01 c | — | 323 | 18,199 |
| [**City of Manassas - (VA)**](https://epri-peac.com/utilities/va-city-of-manassas-va-11560/) | 12.31 c | 76.4 min | 0 | 13,945 |
| [**Bristol Virginia Utilities**](https://epri-peac.com/utilities/va-bristol-virginia-utilities-2248/) | 11.62 c | 25.3 min | 0 | 13,648 |
| [**Kentucky Utilities Co**](https://epri-peac.com/utilities/va-kentucky-utilities-co-10171/) | 15.32 c | 326.7 min | 67 | 22,759 |

What to Check & Best-Fit Scenarios

## What Should City of Harrisonburg - (VA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Harrisonburg - (VA) (Municipal, VA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Harrisonburg - (VA) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in VA.
- Export credit rules: check City of Harrisonburg - (VA)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Harrisonburg - (VA) Solar & Battery Evaluators

Compare your actual City of Harrisonburg - (VA) monthly kWh statement against 11.51 c/kWh and verify current export tariffs in VA.

### City of Harrisonburg - (VA) Outage & Generator Planners

Use City of Harrisonburg - (VA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Harrisonburg - (VA) (Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Harrisonburg - (VA)'s residential electricity rate and 2026 solar payback?

City of Harrisonburg - (VA) averages 11.51 c/kWh (-3.77 c/kWh vs Virginia average vs. Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,243/yr (19.0-year payback).

### How reliable is City of Harrisonburg - (VA) compared to peer Virginia utilities?

City of Harrisonburg - (VA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr); compare rates and outage history directly with Northern Neck Elec Coop, Inc (16.01 c/kWh) across Virginia.

### Which counties and customers does City of Harrisonburg - (VA) serve in Virginia?

EIA-861 filings list 18,133 customers across 1 county including Rockingham, with 329 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Harrisonburg - (VA).

## Related Pages

Explore Virginia energy benchmarks, Northern Neck Elec Coop, Inc, county outage profiles, and NEC 705.12 tools alongside City of Harrisonburg - (VA).

[Virginia State Energy Rates & Utilities](https://epri-peac.com/states/virginia/) [All Virginia County Power & Outage Profiles](https://epri-peac.com/counties/virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.51 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
