---
title: "City of Danville - (VA) (VA) Rate & SAIDI"
url: https://epri-peac.com/utilities/va-city-of-danville-va-4794/
description: "2025 EIA-861 profile for City of Danville - (VA) (VA): 15.81 c/kWh rate, SAIDI Not reported in EIA-861, 247 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Danville - (VA) (VA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Danville - (VA) (EIA ID 4794, VA) serves 38,226 customers at 15.81 c/kWh (+0.53 c/kWh vs Virginia average) with no standalone IEEE SAIDI filing (5 counties served) with 247 net-metered residential solar systems (0.65% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 4794

- **Res. Rate** : 15.81 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 247 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Danville - (VA) Compare on Tariffs and Reliability?

Solar payback, residential tariff (15.81 c/kWh), and outage history inside City of Danville - (VA) territory. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Homeowners inside City of Danville - (VA)'s Virginia footprint (5 counties including Danville City, Halifax, Henry) face 15.81 c/kWh benchmark pricing (-2.73 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 13.8 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr).

## Where Does City of Danville - (VA) Sit Across US Utility Rates?

Benchmarking City of Danville - (VA)'s 15.81 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does City of Danville - (VA) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Danville - (VA) across Virginia utilities. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

## What Do EIA-861 Benchmarks Show for City of Danville - (VA)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Danville - (VA) in 2025.

Lowest Rate #1,377 / 1,989

### 15.81 c/kWh (+0.53 vs VA)

Commercial avg: 11.13 c/kWh; Industrial: 8.47 c/kWh; est. residential bill $161.96/mo.

State Reliability Context

### 763.1 min/yr (VA Avg)

Utility did not file separate IEEE SAIDI in 2025; Virginia customer-weighted SAIDI is 763.1 min/yr.

Post-25D Payback

### 13.8 Years @ 15.81 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,707/yr at 1,350 kWh/kW.

Distributed PV

### 247 Net-Metered Systems

1.932 MW residential PV (0.65% of customers) across 5 counties; state FEMA declarations (2015-2026): 15.

City of Danville - (VA) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1581 = $1,707/yr

EIA-861 2025 Utility ID 4794: Rate=15.81 c/kWh, Cust=38,226, PV=247.

**Result:** 13.8 yr 8 kW cash payback at 15.81 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Danville - (VA)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 4794. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Danville - (VA) (Utility ID 4794).

| EIA Utility ID & BA Code | ID 4794 · PJM |
|---|---|
| State & Ownership Type | VA · Municipal |
| Retail Electricity Rates | 15.81 c/kWh Res · 11.13 c Comm · 8.47 c Ind |
| Avg Monthly Usage & Bill | 1,024.6 kWh/mo ($161.96/mo est.) |
| Residential Net-Metered PV | 247 systems (1.932 MW) |
| Counties Served (Sample) | 5 counties (Danville City, Halifax, Henry, Patrick, Pittsylvania) |

## Which Peer Electric Utilities Operate in VA?

Benchmark City of Danville - (VA) directly against Central Virginia Electric Coop and peer Virginia retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Central Virginia Electric Coop**](https://epri-peac.com/utilities/va-central-virginia-electric-coop-3291/) | 16.16 c | 796.0 min | 915 | 35,353 |
| [**A & N Electric Coop**](https://epri-peac.com/utilities/va-a-n-electric-coop-84/) | 14.4 c | — | 186 | 33,035 |
| [**Mecklenburg Electric Cooperative**](https://epri-peac.com/utilities/va-mecklenburg-electric-cooperative-12260/) | 14.32 c | 721.1 min | 190 | 30,077 |
| [**Kentucky Utilities Co**](https://epri-peac.com/utilities/va-kentucky-utilities-co-10171/) | 15.32 c | 326.7 min | 67 | 22,759 |

What to Check & Best-Fit Scenarios

## What Should City of Danville - (VA) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Danville - (VA) (Municipal, VA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Danville - (VA)'s 15.81 c/kWh blended residential rate in VA does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Danville - (VA) system-wide SAIDI averages rural and urban circuits across its VA territory or nearby Central Virginia Electric Coop.

### City of Danville - (VA) Solar & Battery Evaluators

Compare your actual City of Danville - (VA) monthly kWh statement against 15.81 c/kWh and verify current export tariffs in VA.

### City of Danville - (VA) Outage & Generator Planners

Use City of Danville - (VA)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Danville - (VA) (Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Danville - (VA)'s residential electricity rate and 2026 solar payback?

City of Danville - (VA) averages 15.81 c/kWh (+0.53 c/kWh vs Virginia average vs. Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,707/yr (13.8-year payback).

### How reliable is City of Danville - (VA) compared to peer Virginia utilities?

City of Danville - (VA) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr); compare rates and outage history directly with Central Virginia Electric Coop (16.16 c/kWh) across Virginia.

### Which counties and customers does City of Danville - (VA) serve in Virginia?

EIA-861 filings list 38,226 customers across 5 counties including Danville City, Halifax, Henry, with 247 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Danville - (VA).

## Related Pages

Explore Virginia energy benchmarks, Central Virginia Electric Coop, county outage profiles, and NEC 705.12 tools alongside City of Danville - (VA).

[Virginia State Energy Rates & Utilities](https://epri-peac.com/states/virginia/) [All Virginia County Power & Outage Profiles](https://epri-peac.com/counties/virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 15.81 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
