title: "A & N Electric Coop (VA) Rate & SAIDI"
url: https://epri-peac.com/utilities/va-a-n-electric-coop-84/
description: "2025 EIA-861 profile for A & N Electric Coop (VA): 14.4 c/kWh rate, SAIDI Not reported in EIA-861, 186 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# A & N Electric Coop (VA) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

A & N Electric Coop (EIA ID 84, VA) serves 33,035 customers at 14.4 c/kWh (-0.88 c/kWh vs Virginia average) with no standalone IEEE SAIDI filing (2 counties served) with 186 net-metered residential solar systems (0.56% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 84

- **Res. Rate** : 14.4 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 186 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does A & N Electric Coop Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.88 c/kWh vs Virginia average), customer scale (33,035), and 2026 solar payback benchmarks for A & N Electric Coop.

Ranked #1,073 of 1,989 reporting US utilities for residential rate (above US utility median; lower than 45.9% of peers), A & N Electric Coop serves 33,035 accounts in Virginia (Cooperative). Commercial power averages 12.53 c/kWh. It did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr), with 186 net-metered residential solar systems (0.56% customer adoption).

## Where Does A & N Electric Coop Sit Across US Utility Rates?

Positions A & N Electric Coop (14.4 c/kWh) across 1,989 US electric utility residential tariffs. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## How Does A & N Electric Coop Rank Across Cost & Reliability?

Percentile placement of A & N Electric Coop across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for A & N Electric Coop?

Four key EIA-861 rate, outage, and solar payback benchmarks for A & N Electric Coop (Cooperative) in Virginia. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Lowest Rate #1,073 / 1,989

### 14.4 c/kWh (-0.88 vs VA)

Commercial avg: 12.53 c/kWh; Industrial: 9.87 c/kWh; est. residential bill $142.90/mo.

State Reliability Context

### 763.1 min/yr (VA Avg)

Utility did not file separate IEEE SAIDI in 2025; Virginia customer-weighted SAIDI is 763.1 min/yr.

Post-25D Payback

### 15.2 Years @ 14.4 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,555/yr at 1,350 kWh/kW.

Distributed PV

### 186 Net-Metered Systems

1.432 MW residential PV (0.56% of customers) across 2 counties; state FEMA declarations (2015-2026): 15.

A & N Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1440 = $1,555/yr

EIA-861 2025 Utility ID 84: Rate=14.4 c/kWh, Cust=33,035, PV=186.

**Result:** 15.2 yr 8 kW cash payback at 14.4 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for A & N Electric Coop?

Complete Form EIA-861 filing summary for A & N Electric Coop (ID 84) covering sales, PV, and counties. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for A & N Electric Coop (Utility ID 84).

| EIA Utility ID & BA Code | ID 84 · PJM |
|---|---|
| State & Ownership Type | VA · Cooperative |
| Retail Electricity Rates | 14.4 c/kWh Res · 12.53 c Comm · 9.87 c Ind |
| Avg Monthly Usage & Bill | 992.5 kWh/mo ($142.90/mo est.) |
| Residential Net-Metered PV | 186 systems (1.432 MW) |
| Counties Served (Sample) | 2 counties (Accomack, Northampton) |

## Which Peer Electric Utilities Operate in VA?

Compare A & N Electric Coop directly with Central Virginia Electric Coop and nearby Virginia electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Central Virginia Electric Coop**](https://epri-peac.com/utilities/va-central-virginia-electric-coop-3291/) | 16.16 c | 796.0 min | 915 | 35,353 |
| [**Mecklenburg Electric Cooperative**](https://epri-peac.com/utilities/va-mecklenburg-electric-cooperative-12260/) | 14.32 c | 721.1 min | 190 | 30,077 |
| [**City of Danville - (VA)**](https://epri-peac.com/utilities/va-city-of-danville-va-4794/) | 15.81 c | — | 247 | 38,226 |
| [**Kentucky Utilities Co**](https://epri-peac.com/utilities/va-kentucky-utilities-co-10171/) | 15.32 c | 326.7 min | 67 | 22,759 |

What to Check & Best-Fit Scenarios

## What Should A & N Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for A & N Electric Coop (Cooperative, VA) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether A & N Electric Coop acts as a wires-only TDU or bundled utility in VA.
- Transformer limits: A & N Electric Coop interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### A & N Electric Coop Solar & Battery Evaluators

Compare your actual A & N Electric Coop monthly kWh statement against 14.4 c/kWh and verify current export tariffs in VA.

### A & N Electric Coop Outage & Generator Planners

Use A & N Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for A & N Electric Coop (Virginia) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is A & N Electric Coop's residential electricity rate and 2026 solar payback?

A & N Electric Coop averages 14.4 c/kWh (-0.88 c/kWh vs Virginia average vs. Virginia). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,555/yr (15.2-year payback).

### How reliable is A & N Electric Coop compared to peer Virginia utilities?

A & N Electric Coop did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 763.1 min/yr); compare rates and outage history directly with Central Virginia Electric Coop (16.16 c/kWh) across Virginia.

### Which counties and customers does A & N Electric Coop serve in Virginia?

EIA-861 filings list 33,035 customers across 2 counties including Accomack, Northampton, with 186 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting A & N Electric Coop.

## Related Pages

Explore Virginia energy benchmarks, Central Virginia Electric Coop, county outage profiles, and NEC 705.12 tools alongside A & N Electric Coop.

[Virginia State Energy Rates & Utilities](https://epri-peac.com/states/virginia/) [All Virginia County Power & Outage Profiles](https://epri-peac.com/counties/virginia/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.4 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)