title: "Lehi City Corporation (UT) Rate & SAIDI"
url: https://epri-peac.com/utilities/ut-lehi-city-corporation-10879/
description: "2025 EIA-861 profile for Lehi City Corporation (UT): 10.05 c/kWh rate, SAIDI 42.1 min/yr, 1,081 solar systems. Verified US government and CEC engineering data."
---

EIA-861 Grid Reliability & Net Metering

# Lehi City Corporation (UT) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Lehi City Corporation (EIA ID 10879, UT) serves 28,051 customers at 10.05 c/kWh (-2.97 c/kWh vs Utah average) with 42.1 min/yr SAIDI (0.7 hrs/yr) with 1,081 net-metered residential solar systems (3.85% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10879

- **Res. Rate** : 10.05 c/kWh

- **SAIDI (All Events)** : 42.1 min/yr

- **Net-Metered PV** : 1,081 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Lehi City Corporation Compare on Tariffs and Reliability?

How Lehi City Corporation (Municipal) performs across 1 county on kWh rates and outage resilience. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Lehi City Corporation (Municipal) recorded 42.1 SAIDI outage minutes (0.7 hrs/yr, rank #91 of 751 reporting utilities). Typical residential meters drew 831.3 kWh/mo ($83.59/mo) in 2025, while its tariff offers a low 10.05 c/kWh residential rate (-8.49 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 21.8 years without federal 25D—compare rates directly with Dixie Escalante R E A, Inc (9.17 c/kWh).

## Where Does Lehi City Corporation Sit Across US Utility Rates?

National utility tariff curve marking Lehi City Corporation at 10.05 c/kWh vs. 18.54 c/kWh US mean.

## How Does Lehi City Corporation Rank Across Cost & Reliability?

Relative ranking of Lehi City Corporation on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for Lehi City Corporation?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Lehi City Corporation in Utah. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #143 / 1,989

### 10.05 c/kWh (-2.97 vs UT)

Commercial avg: 10.44 c/kWh; est. residential bill $83.59/mo.

Reliability #91 / 751

### 42.1 min/yr (0.7 hrs)

0.0% (0.0 min) from Major Event Days; avg restore 93.9 min (~2.8 kWh @ 1.8 kW).

Post-25D Payback

### 21.8 Years @ 10.05 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,085/yr at 1,350 kWh/kW.

Distributed PV

### 1,081 Net-Metered Systems

7.741 MW residential PV (3.85% of customers) across 1 county; state FEMA declarations (2015-2026): 30.

Lehi City Corporation Reliability & Solar Offset Calculation

Backup_Energy = (93.9 min / 60) * 1.8 kW = 2.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1005 = $1,085/yr

EIA-861 2025 Utility ID 10879: Rate=10.05 c/kWh, Cust=28,051, SAIDI=42.1 min, PV=1,081.

**Result:** 0.7 outage hrs/yr; 21.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Lehi City Corporation?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Lehi City Corporation. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for Lehi City Corporation (Utility ID 10879).

| EIA Utility ID & BA Code | ID 10879 · PACE |
|---|---|
| State & Ownership Type | UT · Municipal |
| Retail Electricity Rates | 10.05 c/kWh Res · 10.44 c Comm |
| Avg Monthly Usage & Bill | 831.3 kWh/mo ($83.59/mo est.) |
| SAIDI (All Events w/ MED) | 42.1 min/yr (0.7 hrs/yr) |
| SAIDI (Without Major Events) | 42.1 min/yr (Storm share: 0.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.449 /yr · 93.9 min restore |
| Residential Net-Metered PV | 1,081 systems (7.741 MW) |
| Counties Served (Sample) | 1 county (Utah) |

## Which Peer Electric Utilities Operate in UT?

Nearby Utah electric utilities of comparable customer size led by Dixie Escalante R E A, Inc (9.17 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Dixie Escalante R E A, Inc**](https://epri-peac.com/utilities/ut-dixie-escalante-r-e-a-inc-40165/) | 9.17 c | 43.7 min | 220 | 28,410 |
| [**City of St George - (UT)**](https://epri-peac.com/utilities/ut-city-of-st-george-ut-17874/) | 11.71 c | 21.7 min | 872 | 28,681 |
| [**Provo City Corp**](https://epri-peac.com/utilities/ut-provo-city-corp-15444/) | 11.38 c | 53.3 min | 1,283 | 36,032 |
| [**City of Logan - (UT)**](https://epri-peac.com/utilities/ut-city-of-logan-ut-11135/) | 12.99 c | 28.6 min | 1,197 | 19,879 |

What to Check & Best-Fit Scenarios

## What Should Lehi City Corporation Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Lehi City Corporation (Municipal, UT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: Lehi City Corporation (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in UT.
- Export credit rules: check Lehi City Corporation's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### Lehi City Corporation Solar & Battery Evaluators

Compare your actual Lehi City Corporation monthly kWh statement against 10.05 c/kWh and verify current export tariffs in UT.

### Lehi City Corporation Outage & Generator Planners

Use Lehi City Corporation's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Lehi City Corporation (Utah) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

### What is Lehi City Corporation's residential electricity rate and 2026 solar payback?

Lehi City Corporation averages 10.05 c/kWh (-2.97 c/kWh vs Utah average vs. Utah). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,085/yr (21.8-year payback).

### How reliable is Lehi City Corporation compared to peer Utah utilities?

Lehi City Corporation recorded 42.1 SAIDI outage minutes (0.7 hrs/yr, rank #91 of 751 reporting utilities); compare rates and outage history directly with Dixie Escalante R E A, Inc (9.17 c/kWh) across Utah.

### Which counties and customers does Lehi City Corporation serve in Utah?

EIA-861 filings list 28,051 customers across 1 county including Utah, with 1,081 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Lehi City Corporation.

## Related Pages

Explore Utah energy benchmarks, Dixie Escalante R E A, Inc, county outage profiles, and NEC 705.12 tools alongside Lehi City Corporation.

[Utah State Energy Rates & Utilities](https://epri-peac.com/states/utah/) [All Utah County Power & Outage Profiles](https://epri-peac.com/counties/utah/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.05 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)