EIA-861 Grid Reliability & Net Metering

# Garkane Energy Coop, Inc (UT) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Garkane Energy Coop, Inc (EIA ID 6957, UT) serves 11,895 customers at 11.62 c/kWh (-1.40 c/kWh vs Utah average) with 898.6 min/yr SAIDI (14.98 hrs/yr) with 220 net-metered residential solar systems (1.85% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6957

- **Res. Rate** : 11.62 c/kWh

- **SAIDI (All Events)** : 898.6 min/yr

- **Net-Metered PV** : 220 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Garkane Energy Coop, Inc Compare on Tariffs and Reliability?

How Garkane Energy Coop, Inc (Cooperative) performs across 7 counties on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Garkane Energy Coop, Inc (Cooperative) logged 898.6 SAIDI outage minutes (14.98 hrs/yr, 36.0% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 873.6 kWh/mo ($101.53/mo) in 2025, while its tariff offers a low 11.62 c/kWh residential rate (-6.92 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.8 years without federal 25D—compare rates directly with City of Springville - (UT) (12.95 c/kWh).

## Where Does Garkane Energy Coop, Inc Sit Across US Utility Rates?

National utility tariff curve marking Garkane Energy Coop, Inc at 11.62 c/kWh vs. 18.54 c/kWh US mean.

## How Does Garkane Energy Coop, Inc Rank Across Cost & Reliability?

Relative ranking of Garkane Energy Coop, Inc on residential electricity pricing and annual IEEE SAIDI outage duration. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

## What Do EIA-861 Benchmarks Show for Garkane Energy Coop, Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Garkane Energy Coop, Inc in Utah.

Lowest Rate #334 / 1,989

### 11.62 c/kWh (-1.40 vs UT)

Commercial avg: 11.37 c/kWh; Industrial: 7.46 c/kWh; est. residential bill $101.53/mo.

Reliability #702 / 751

### 898.6 min/yr (14.98 hrs)

36.0% (323.2 min) from Major Event Days.

Post-25D Payback

### 18.8 Years @ 11.62 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,255/yr at 1,350 kWh/kW.

Distributed PV

### 220 Net-Metered Systems

1.269 MW residential PV (1.85% of customers) across 7 counties; state FEMA declarations (2015-2026): 30.

Garkane Energy Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1162 = $1,255/yr

EIA-861 2025 Utility ID 6957: Rate=11.62 c/kWh, Cust=11,895, SAIDI=898.6 min, PV=220.

**Result:** 14.98 outage hrs/yr; 18.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Garkane Energy Coop, Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Garkane Energy Coop, Inc. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for Garkane Energy Coop, Inc (Utility ID 6957).

| EIA Utility ID & BA Code | ID 6957 · WACM |
|---|---|
| State & Ownership Type | UT · Cooperative |
| Retail Electricity Rates | 11.62 c/kWh Res · 11.37 c Comm · 7.46 c Ind |
| Avg Monthly Usage & Bill | 873.6 kWh/mo ($101.53/mo est.) |
| SAIDI (All Events w/ MED) | 898.6 min/yr (14.98 hrs/yr) |
| SAIDI (Without Major Events) | 575.4 min/yr (Storm share: 36.0%) |
| Residential Net-Metered PV | 220 systems (1.269 MW) |
| Counties Served (Sample) | 7 counties (Garfield, Iron, Kane, Piute, Sevier, Washington, Wayne) |

## Which Peer Electric Utilities Operate in UT?

Nearby Utah electric utilities of comparable customer size led by City of Springville - (UT) (12.95 c/kWh). Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Springville - (UT)**](https://epri-peac.com/utilities/ut-city-of-springville-ut-17845/) | 12.95 c | 46.0 min | 310 | 10,918 |
| [**Moon Lake Electric Assn Inc**](https://epri-peac.com/utilities/ut-moon-lake-electric-assn-inc-12866/) | 9.3 c | — | 91 | 13,441 |
| [**Heber Light & Power Company**](https://epri-peac.com/utilities/ut-heber-light-power-company-8366/) | 14.4 c | 116.1 min | 551 | 13,903 |
| [**City of Bountiful - (UT)**](https://epri-peac.com/utilities/ut-city-of-bountiful-ut-2010/) | 13.48 c | — | 296 | 15,762 |

What to Check & Best-Fit Scenarios

## What Should Garkane Energy Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Garkane Energy Coop, Inc (Cooperative, UT) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Garkane Energy Coop, Inc acts as a wires-only TDU or bundled utility in UT.
- Transformer limits: Garkane Energy Coop, Inc interconnection engineering still checks neighborhood transformer kVA regardless of 898.6 SAIDI.

### Garkane Energy Coop, Inc Solar & Battery Evaluators

Compare your actual Garkane Energy Coop, Inc monthly kWh statement against 11.62 c/kWh and verify current export tariffs in UT.

### Garkane Energy Coop, Inc Outage & Generator Planners

Use Garkane Energy Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Garkane Energy Coop, Inc (Utah) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Garkane Energy Coop, Inc's residential electricity rate and 2026 solar payback?

Garkane Energy Coop, Inc averages 11.62 c/kWh (-1.40 c/kWh vs Utah average vs. Utah). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,255/yr (18.8-year payback).

### How reliable is Garkane Energy Coop, Inc compared to peer Utah utilities?

Garkane Energy Coop, Inc logged 898.6 SAIDI outage minutes (14.98 hrs/yr, 36.0% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Springville - (UT) (12.95 c/kWh) across Utah.

### Which counties and customers does Garkane Energy Coop, Inc serve in Utah?

EIA-861 filings list 11,895 customers across 7 counties including Garfield, Iron, Kane, with 220 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Garkane Energy Coop, Inc.

## Related Pages

Explore Utah energy benchmarks, City of Springville - (UT), county outage profiles, and NEC 705.12 tools alongside Garkane Energy Coop, Inc.

[Utah State Energy Rates & Utilities](https://epri-peac.com/states/utah/) [All Utah County Power & Outage Profiles](https://epri-peac.com/counties/utah/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.62 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)