---
title: "Rio Grande Electric Coop, Inc (TX) Rate & SAIDI"
url: https://epri-peac.com/utilities/tx-rio-grande-electric-coop-inc-16057/
description: "2025 EIA-861 profile for Rio Grande Electric Coop, Inc (TX): 18.29 c/kWh rate, SAIDI 194.7 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Rio Grande Electric Coop, Inc (TX) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Rio Grande Electric Coop, Inc (EIA ID 16057, TX) serves 9,371 customers at 18.29 c/kWh (+2.89 c/kWh vs Texas average) with 194.7 min/yr SAIDI (3.24 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16057

- **Res. Rate** : 18.29 c/kWh

- **SAIDI (All Events)** : 194.7 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Rio Grande Electric Coop, Inc Compare on Tariffs and Reliability?

How Rio Grande Electric Coop, Inc (Cooperative) performs across 18 counties on kWh rates and outage resilience. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Across 18 counties including Brewster, Crockett, Culberson, Rio Grande Electric Coop, Inc bills residential power at 18.29 c/kWh (+2.89 c/kWh vs Texas average vs. Texas), offsetting ~$1,975/yr on an 8 kW array compared to peer Panola-Harrison Elec Coop, Inc (10.66 c/kWh). With 9,371 customer accounts (Cooperative), 2025 Form EIA-861 shows Rio Grande Electric Coop, Inc recorded 194.7 SAIDI outage minutes (3.24 hrs/yr, rank #402 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does Rio Grande Electric Coop, Inc Sit Across US Utility Rates?

National utility tariff curve marking Rio Grande Electric Coop, Inc at 18.29 c/kWh vs. 18.54 c/kWh US mean.

## How Does Rio Grande Electric Coop, Inc Rank Across Cost & Reliability?

Relative ranking of Rio Grande Electric Coop, Inc on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Rio Grande Electric Coop, Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Rio Grande Electric Coop, Inc in Texas.

Lowest Rate #1,661 / 1,989

### 18.29 c/kWh (+2.89 vs TX)

Commercial avg: 13.28 c/kWh; Industrial: 10.02 c/kWh; est. residential bill $168.11/mo.

Reliability #402 / 751

### 194.7 min/yr (3.24 hrs)

31.0% (60.3 min) from Major Event Days.

Post-25D Payback

### 11.9 Years @ 18.29 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,975/yr at 1,350 kWh/kW.

Service Territory

### 9,371 Customers · 18 Counties

Serves 18 counties including Brewster, Crockett, Culberson in Texas; state FEMA declarations (2015-2026): 56.

Rio Grande Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1829 = $1,975/yr

EIA-861 2025 Utility ID 16057: Rate=18.29 c/kWh, Cust=9,371, SAIDI=194.7 min.

**Result:** 3.24 outage hrs/yr; 11.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Rio Grande Electric Coop, Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Rio Grande Electric Coop, Inc. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Form EIA-861 2025 filing metrics for Rio Grande Electric Coop, Inc (Utility ID 16057).

| EIA Utility ID & BA Code | ID 16057 · ERCO |
|---|---|
| State & Ownership Type | TX · Cooperative |
| Retail Electricity Rates | 18.29 c/kWh Res · 13.28 c Comm · 10.02 c Ind |
| Avg Monthly Usage & Bill | 919.3 kWh/mo ($168.11/mo est.) |
| SAIDI (All Events w/ MED) | 194.7 min/yr (3.24 hrs/yr) |
| SAIDI (Without Major Events) | 134.4 min/yr (Storm share: 31.0%) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 18 counties (Brewster, Crockett, Culberson, Dimmit, Edwards, El Paso, Hudspeth, Jeff Davis, Kinney, Maverick) |

## Which Peer Electric Utilities Operate in TX?

Nearby Texas electric utilities of comparable customer size led by Panola-Harrison Elec Coop, Inc (10.66 c/kWh). Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Panola-Harrison Elec Coop, Inc**](https://epri-peac.com/utilities/tx-panola-harrison-elec-coop-inc-14424/) | 10.66 c | — | 0 | 9,432 |
| [**Big Country Electric Coop, Inc**](https://epri-peac.com/utilities/tx-big-country-electric-coop-inc-1591/) | 13.33 c | — | 40 | 9,533 |
| [**Lyntegar Electric Coop, Inc**](https://epri-peac.com/utilities/tx-lyntegar-electric-coop-inc-11364/) | 10.35 c | 266.9 min | 0 | 9,163 |
| [**City of Seguin - (TX)**](https://epri-peac.com/utilities/tx-city-of-seguin-tx-16900/) | 11.06 c | — | 0 | 8,913 |

What to Check & Best-Fit Scenarios

## What Should Rio Grande Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Rio Grande Electric Coop, Inc (Cooperative, TX) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Rio Grande Electric Coop, Inc (TX) shift real bills away from 18.29 c/kWh.
- Outage clustering: Major Event Days skew Rio Grande Electric Coop, Inc annual minutes differently than routine non-storm reliability.

### Rio Grande Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Rio Grande Electric Coop, Inc monthly kWh statement against 18.29 c/kWh and verify current export tariffs in TX.

### Rio Grande Electric Coop, Inc Outage & Generator Planners

Use Rio Grande Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Rio Grande Electric Coop, Inc (Texas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Rio Grande Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Rio Grande Electric Coop, Inc averages 18.29 c/kWh (+2.89 c/kWh vs Texas average vs. Texas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,975/yr (11.9-year payback).

### How reliable is Rio Grande Electric Coop, Inc compared to peer Texas utilities?

Rio Grande Electric Coop, Inc recorded 194.7 SAIDI outage minutes (3.24 hrs/yr, rank #402 of 751 reporting utilities); compare rates and outage history directly with Panola-Harrison Elec Coop, Inc (10.66 c/kWh) across Texas.

### Which counties and customers does Rio Grande Electric Coop, Inc serve in Texas?

EIA-861 filings list 9,371 customers across 18 counties including Brewster, Crockett, Culberson, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Rio Grande Electric Coop, Inc.

## Related Pages

Explore Texas energy benchmarks, Panola-Harrison Elec Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Rio Grande Electric Coop, Inc.

[Texas State Energy Rates & Utilities](https://epri-peac.com/states/texas/) [All Texas County Power & Outage Profiles](https://epri-peac.com/counties/texas/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 18.29 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
