---
title: "Lyntegar Electric Coop, Inc (TX) Rate & SAIDI"
url: https://epri-peac.com/utilities/tx-lyntegar-electric-coop-inc-11364/
description: "2025 EIA-861 profile for Lyntegar Electric Coop, Inc (TX): 10.35 c/kWh rate, SAIDI 266.9 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Lyntegar Electric Coop, Inc (TX) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Lyntegar Electric Coop, Inc (EIA ID 11364, TX) serves 9,163 customers at 10.35 c/kWh (-5.05 c/kWh vs Texas average) with 266.9 min/yr SAIDI (4.45 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 11364

- **Res. Rate** : 10.35 c/kWh

- **SAIDI (All Events)** : 266.9 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Lyntegar Electric Coop, Inc Compare on Tariffs and Reliability?

Solar payback, residential tariff (10.35 c/kWh), and outage history inside Lyntegar Electric Coop, Inc territory. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Homeowners inside Lyntegar Electric Coop, Inc's Texas footprint (12 counties including Andrews, Borden, Dawson) face 10.35 c/kWh benchmark pricing (-8.19 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 21.1 years. Reliability data logged 266.9 SAIDI outage minutes (4.45 hrs/yr, 0.0% storm-driven), making battery backup or a standby ATS worthwhile.

## Where Does Lyntegar Electric Coop, Inc Sit Across US Utility Rates?

Benchmarking Lyntegar Electric Coop, Inc's 10.35 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does Lyntegar Electric Coop, Inc Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for Lyntegar Electric Coop, Inc across Texas utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for Lyntegar Electric Coop, Inc?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by Lyntegar Electric Coop, Inc in 2025.

Lowest Rate #171 / 1,989

### 10.35 c/kWh (-5.05 vs TX)

Commercial avg: 7.48 c/kWh; Industrial: 10.83 c/kWh; est. residential bill $113.73/mo.

Reliability #502 / 751

### 266.9 min/yr (4.45 hrs)

0.0% (0.0 min) from Major Event Days.

Post-25D Payback

### 21.1 Years @ 10.35 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,118/yr at 1,350 kWh/kW.

Service Territory

### 9,163 Customers · 12 Counties

Serves 12 counties including Andrews, Borden, Dawson in Texas; state FEMA declarations (2015-2026): 56.

Lyntegar Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1035 = $1,118/yr

EIA-861 2025 Utility ID 11364: Rate=10.35 c/kWh, Cust=9,163, SAIDI=266.9 min.

**Result:** 4.45 outage hrs/yr; 21.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Lyntegar Electric Coop, Inc?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 11364. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Lyntegar Electric Coop, Inc (Utility ID 11364).

| EIA Utility ID & BA Code | ID 11364 · SWPP |
|---|---|
| State & Ownership Type | TX · Cooperative |
| Retail Electricity Rates | 10.35 c/kWh Res · 7.48 c Comm · 10.83 c Ind |
| Avg Monthly Usage & Bill | 1,099.0 kWh/mo ($113.73/mo est.) |
| SAIDI (All Events w/ MED) | 266.9 min/yr (4.45 hrs/yr) |
| SAIDI (Without Major Events) | 266.9 min/yr (Storm share: 0.0%) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 12 counties (Andrews, Borden, Dawson, Gaines, Garza, Hockley, Howard, Lubbock, Lynn, Martin) |

## Which Peer Electric Utilities Operate in TX?

Benchmark Lyntegar Electric Coop, Inc directly against Rio Grande Electric Coop, Inc and peer Texas retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Rio Grande Electric Coop, Inc**](https://epri-peac.com/utilities/tx-rio-grande-electric-coop-inc-16057/) | 18.29 c | 194.7 min | 0 | 9,371 |
| [**City of Seguin - (TX)**](https://epri-peac.com/utilities/tx-city-of-seguin-tx-16900/) | 11.06 c | — | 0 | 8,913 |
| [**Panola-Harrison Elec Coop, Inc**](https://epri-peac.com/utilities/tx-panola-harrison-elec-coop-inc-14424/) | 10.66 c | — | 0 | 9,432 |
| [**Big Country Electric Coop, Inc**](https://epri-peac.com/utilities/tx-big-country-electric-coop-inc-1591/) | 13.33 c | — | 40 | 9,533 |

What to Check & Best-Fit Scenarios

## What Should Lyntegar Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Lyntegar Electric Coop, Inc (Cooperative, TX) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Lyntegar Electric Coop, Inc's 10.35 c/kWh blended residential rate in TX does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Lyntegar Electric Coop, Inc system-wide SAIDI averages rural and urban circuits across its TX territory or nearby Rio Grande Electric Coop, Inc.

### Lyntegar Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Lyntegar Electric Coop, Inc monthly kWh statement against 10.35 c/kWh and verify current export tariffs in TX.

### Lyntegar Electric Coop, Inc Outage & Generator Planners

Use Lyntegar Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Lyntegar Electric Coop, Inc (Texas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Lyntegar Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Lyntegar Electric Coop, Inc averages 10.35 c/kWh (-5.05 c/kWh vs Texas average vs. Texas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,118/yr (21.1-year payback).

### How reliable is Lyntegar Electric Coop, Inc compared to peer Texas utilities?

Lyntegar Electric Coop, Inc logged 266.9 SAIDI outage minutes (4.45 hrs/yr, 0.0% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Rio Grande Electric Coop, Inc (18.29 c/kWh) across Texas.

### Which counties and customers does Lyntegar Electric Coop, Inc serve in Texas?

EIA-861 filings list 9,163 customers across 12 counties including Andrews, Borden, Dawson, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Lyntegar Electric Coop, Inc.

## Related Pages

Explore Texas energy benchmarks, Rio Grande Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Lyntegar Electric Coop, Inc.

[Texas State Energy Rates & Utilities](https://epri-peac.com/states/texas/) [All Texas County Power & Outage Profiles](https://epri-peac.com/counties/texas/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.35 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
