---
title: "City of Seguin - (TX) (TX) Rate & SAIDI"
url: https://epri-peac.com/utilities/tx-city-of-seguin-tx-16900/
description: "2025 EIA-861 profile for City of Seguin - (TX) (TX): 11.06 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Seguin - (TX) (TX) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Seguin - (TX) (EIA ID 16900, TX) serves 8,913 customers at 11.06 c/kWh (-4.34 c/kWh vs Texas average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 16900

- **Res. Rate** : 11.06 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Seguin - (TX) Compare on Tariffs and Reliability?

Solar payback, residential tariff (11.06 c/kWh), and outage history inside City of Seguin - (TX) territory. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Homeowners inside City of Seguin - (TX)'s Texas footprint (1 county including Guadalupe) face 11.06 c/kWh benchmark pricing (-7.48 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 19.8 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr).

## Where Does City of Seguin - (TX) Sit Across US Utility Rates?

Benchmarking City of Seguin - (TX)'s 11.06 c/kWh residential rate against 1,989 EIA-861 utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## How Does City of Seguin - (TX) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Seguin - (TX) across Texas utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for City of Seguin - (TX)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Seguin - (TX) in 2025.

Lowest Rate #249 / 1,989

### 11.06 c/kWh (-4.34 vs TX)

Commercial avg: 9.02 c/kWh; Industrial: 7.83 c/kWh; est. residential bill $111.56/mo.

State Reliability Context

### 211.1 min/yr (TX Avg)

Utility did not file separate IEEE SAIDI in 2025; Texas customer-weighted SAIDI is 211.1 min/yr.

Post-25D Payback

### 19.8 Years @ 11.06 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,194/yr at 1,350 kWh/kW.

Service Territory

### 8,913 Customers · 1 County

Serves 1 county including Guadalupe in Texas; state FEMA declarations (2015-2026): 56.

City of Seguin - (TX) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1106 = $1,194/yr

EIA-861 2025 Utility ID 16900: Rate=11.06 c/kWh, Cust=8,913.

**Result:** 19.8 yr 8 kW cash payback at 11.06 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Seguin - (TX)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 16900. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Seguin - (TX) (Utility ID 16900).

| EIA Utility ID & BA Code | ID 16900 · ERCO |
|---|---|
| State & Ownership Type | TX · Municipal |
| Retail Electricity Rates | 11.06 c/kWh Res · 9.02 c Comm · 7.83 c Ind |
| Avg Monthly Usage & Bill | 1,009.1 kWh/mo ($111.56/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Guadalupe) |

## Which Peer Electric Utilities Operate in TX?

Benchmark City of Seguin - (TX) directly against Lyntegar Electric Coop, Inc and peer Texas retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Lyntegar Electric Coop, Inc**](https://epri-peac.com/utilities/tx-lyntegar-electric-coop-inc-11364/) | 10.35 c | 266.9 min | 0 | 9,163 |
| [**Rio Grande Electric Coop, Inc**](https://epri-peac.com/utilities/tx-rio-grande-electric-coop-inc-16057/) | 18.29 c | 194.7 min | 0 | 9,371 |
| [**Panola-Harrison Elec Coop, Inc**](https://epri-peac.com/utilities/tx-panola-harrison-elec-coop-inc-14424/) | 10.66 c | — | 0 | 9,432 |
| [**Big Country Electric Coop, Inc**](https://epri-peac.com/utilities/tx-big-country-electric-coop-inc-1591/) | 13.33 c | — | 40 | 9,533 |

What to Check & Best-Fit Scenarios

## What Should City of Seguin - (TX) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Seguin - (TX) (Municipal, TX) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside City of Seguin - (TX) (TX) shift real bills away from 11.06 c/kWh.
- Outage clustering: Major Event Days skew City of Seguin - (TX) annual minutes differently than routine non-storm reliability.

### City of Seguin - (TX) Solar & Battery Evaluators

Compare your actual City of Seguin - (TX) monthly kWh statement against 11.06 c/kWh and verify current export tariffs in TX.

### City of Seguin - (TX) Outage & Generator Planners

Use City of Seguin - (TX)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Seguin - (TX) (Texas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Seguin - (TX)'s residential electricity rate and 2026 solar payback?

City of Seguin - (TX) averages 11.06 c/kWh (-4.34 c/kWh vs Texas average vs. Texas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,194/yr (19.8-year payback).

### How reliable is City of Seguin - (TX) compared to peer Texas utilities?

City of Seguin - (TX) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr); compare rates and outage history directly with Lyntegar Electric Coop, Inc (10.35 c/kWh) across Texas.

### Which counties and customers does City of Seguin - (TX) serve in Texas?

EIA-861 filings list 8,913 customers across 1 county including Guadalupe, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Seguin - (TX).

## Related Pages

Explore Texas energy benchmarks, Lyntegar Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside City of Seguin - (TX).

[Texas State Energy Rates & Utilities](https://epri-peac.com/states/texas/) [All Texas County Power & Outage Profiles](https://epri-peac.com/counties/texas/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.06 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
