---
title: "City of Garland - (TX) (TX) Rate & SAIDI"
url: https://epri-peac.com/utilities/tx-city-of-garland-tx-6958/
description: "2025 EIA-861 profile for City of Garland - (TX) (TX): 13.68 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Garland - (TX) (TX) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Garland - (TX) (EIA ID 6958, TX) serves 70,627 customers at 13.68 c/kWh (-1.72 c/kWh vs Texas average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6958

- **Res. Rate** : 13.68 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Garland - (TX) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.68 c/kWh), and outage history inside City of Garland - (TX) territory. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Homeowners inside City of Garland - (TX)'s Texas footprint (1 county including Dallas) face 13.68 c/kWh benchmark pricing (-4.86 c/kWh vs US weighted mean). At 0% federal 25D credit in 2026, an 8 kW cash array ($23,600) pays back in 16.0 years. Reliability data did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr).

## Where Does City of Garland - (TX) Sit Across US Utility Rates?

Benchmarking City of Garland - (TX)'s 13.68 c/kWh residential rate against 1,989 EIA-861 utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## How Does City of Garland - (TX) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Garland - (TX) across Texas utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for City of Garland - (TX)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Garland - (TX) in 2025.

Lowest Rate #865 / 1,989

### 13.68 c/kWh (-1.72 vs TX)

Commercial avg: 12.25 c/kWh; Industrial: 6.52 c/kWh; est. residential bill $145.86/mo.

State Reliability Context

### 211.1 min/yr (TX Avg)

Utility did not file separate IEEE SAIDI in 2025; Texas customer-weighted SAIDI is 211.1 min/yr.

Post-25D Payback

### 16.0 Years @ 13.68 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,477/yr at 1,350 kWh/kW.

Service Territory

### 70,627 Customers · 1 County

Serves 1 county including Dallas in Texas; state FEMA declarations (2015-2026): 56.

City of Garland - (TX) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1368 = $1,477/yr

EIA-861 2025 Utility ID 6958: Rate=13.68 c/kWh, Cust=70,627.

**Result:** 16.0 yr 8 kW cash payback at 13.68 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Garland - (TX)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 6958. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Form EIA-861 2025 filing metrics for City of Garland - (TX) (Utility ID 6958).

| EIA Utility ID & BA Code | ID 6958 · ERCO |
|---|---|
| State & Ownership Type | TX · Municipal |
| Retail Electricity Rates | 13.68 c/kWh Res · 12.25 c Comm · 6.52 c Ind |
| Avg Monthly Usage & Bill | 1,066.3 kWh/mo ($145.86/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Dallas) |

## Which Peer Electric Utilities Operate in TX?

Benchmark City of Garland - (TX) directly against City of Denton - (TX) and peer Texas retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Denton - (TX)**](https://epri-peac.com/utilities/tx-city-of-denton-tx-5063/) | 13.6 c | 47.6 min | 1,330 | 63,757 |
| [**City of Bryan - (TX)**](https://epri-peac.com/utilities/tx-city-of-bryan-tx-2442/) | 10.89 c | — | 797 | 62,535 |
| [**Trinity Valley Elec Coop Inc**](https://epri-peac.com/utilities/tx-trinity-valley-elec-coop-inc-18976/) | 12.24 c | 179.0 min | 1,769 | 82,224 |
| [**City of New Braunfels - (TX)**](https://epri-peac.com/utilities/tx-city-of-new-braunfels-tx-13418/) | 12.39 c | 57.9 min | 1,361 | 57,050 |

What to Check & Best-Fit Scenarios

## What Should City of Garland - (TX) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Garland - (TX) (Municipal, TX) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Garland - (TX)'s 13.68 c/kWh blended residential rate in TX does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Garland - (TX) system-wide SAIDI averages rural and urban circuits across its TX territory or nearby City of Denton - (TX).

### City of Garland - (TX) Solar & Battery Evaluators

Compare your actual City of Garland - (TX) monthly kWh statement against 13.68 c/kWh and verify current export tariffs in TX.

### City of Garland - (TX) Outage & Generator Planners

Use City of Garland - (TX)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Garland - (TX) (Texas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Garland - (TX)'s residential electricity rate and 2026 solar payback?

City of Garland - (TX) averages 13.68 c/kWh (-1.72 c/kWh vs Texas average vs. Texas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,477/yr (16.0-year payback).

### How reliable is City of Garland - (TX) compared to peer Texas utilities?

City of Garland - (TX) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr); compare rates and outage history directly with City of Denton - (TX) (13.6 c/kWh) across Texas.

### Which counties and customers does City of Garland - (TX) serve in Texas?

EIA-861 filings list 70,627 customers across 1 county including Dallas, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Garland - (TX).

## Related Pages

Explore Texas energy benchmarks, City of Denton - (TX), county outage profiles, and NEC 705.12 tools alongside City of Garland - (TX).

[Texas State Energy Rates & Utilities](https://epri-peac.com/states/texas/) [All Texas County Power & Outage Profiles](https://epri-peac.com/counties/texas/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.68 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
