---
title: "City of Brenham - (TX) (TX) Rate & SAIDI"
url: https://epri-peac.com/utilities/tx-city-of-brenham-tx-2194/
description: "2025 EIA-861 profile for City of Brenham - (TX) (TX): 10.36 c/kWh rate, SAIDI Not reported in EIA-861, 18 solar systems. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Brenham - (TX) (TX) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Brenham - (TX) (EIA ID 2194, TX) serves 6,073 customers at 10.36 c/kWh (-5.04 c/kWh vs Texas average) with no standalone IEEE SAIDI filing (1 county served) with 18 net-metered residential solar systems (0.3% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 2194

- **Res. Rate** : 10.36 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 18 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Brenham - (TX) Compare on Tariffs and Reliability?

EIA-861 rate delta (-5.04 c/kWh vs Texas average), customer scale (6,073), and 2026 solar payback benchmarks for City of Brenham - (TX).

Serving 6,073 customers across 1 county including Washington in Texas, City of Brenham - (TX) (Municipal, Balancing Authority ERCO) offers a low 10.36 c/kWh residential rate (-8.18 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 21.1 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr), with 18 net-metered residential solar systems (0.3% customer adoption).

## Where Does City of Brenham - (TX) Sit Across US Utility Rates?

Positions City of Brenham - (TX) (10.36 c/kWh) across 1,989 US electric utility residential tariffs. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

## How Does City of Brenham - (TX) Rank Across Cost & Reliability?

Percentile placement of City of Brenham - (TX) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Brenham - (TX)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Brenham - (TX) (Municipal) in Texas. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Lowest Rate #173 / 1,989

### 10.36 c/kWh (-5.04 vs TX)

Commercial avg: 8.99 c/kWh; Industrial: 7.51 c/kWh; est. residential bill $112.58/mo.

State Reliability Context

### 211.1 min/yr (TX Avg)

Utility did not file separate IEEE SAIDI in 2025; Texas customer-weighted SAIDI is 211.1 min/yr.

Post-25D Payback

### 21.1 Years @ 10.36 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,119/yr at 1,350 kWh/kW.

Distributed PV

### 18 Net-Metered Systems

0.154 MW residential PV (0.3% of customers) across 1 county; state FEMA declarations (2015-2026): 56.

City of Brenham - (TX) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1036 = $1,119/yr

EIA-861 2025 Utility ID 2194: Rate=10.36 c/kWh, Cust=6,073, PV=18.

**Result:** 21.1 yr 8 kW cash payback at 10.36 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Brenham - (TX)?

Complete Form EIA-861 filing summary for City of Brenham - (TX) (ID 2194) covering sales, PV, and counties. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Brenham - (TX) (Utility ID 2194).

| EIA Utility ID & BA Code | ID 2194 · ERCO |
|---|---|
| State & Ownership Type | TX · Municipal |
| Retail Electricity Rates | 10.36 c/kWh Res · 8.99 c Comm · 7.51 c Ind |
| Avg Monthly Usage & Bill | 1,086.7 kWh/mo ($112.58/mo est.) |
| Residential Net-Metered PV | 18 systems (0.154 MW) |
| Counties Served (Sample) | 1 county (Washington) |

## Which Peer Electric Utilities Operate in TX?

Compare City of Brenham - (TX) directly with Tesla Inc. and nearby Texas electric utilities by customer base. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tesla Inc.**](https://epri-peac.com/utilities/tx-tesla-inc-57313/) | 13.31 c | — | 0 | 6,027 |
| [**Southwest Texas Elec Coop, Inc**](https://epri-peac.com/utilities/tx-southwest-texas-elec-coop-inc-17693/) | 14.65 c | — | 0 | 5,934 |
| [**Wharton County Elec Coop, Inc**](https://epri-peac.com/utilities/tx-wharton-county-elec-coop-inc-20472/) | 14.18 c | — | 0 | 5,583 |
| [**Comanche County Elec Coop Assn**](https://epri-peac.com/utilities/tx-comanche-county-elec-coop-assn-4295/) | 15.65 c | — | 149 | 7,487 |

What to Check & Best-Fit Scenarios

## What Should City of Brenham - (TX) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Brenham - (TX) (Municipal, TX) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Brenham - (TX)'s 10.36 c/kWh blended residential rate in TX does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Brenham - (TX) system-wide SAIDI averages rural and urban circuits across its TX territory or nearby Tesla Inc..

### City of Brenham - (TX) Solar & Battery Evaluators

Compare your actual City of Brenham - (TX) monthly kWh statement against 10.36 c/kWh and verify current export tariffs in TX.

### City of Brenham - (TX) Outage & Generator Planners

Use City of Brenham - (TX)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Brenham - (TX) (Texas) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Brenham - (TX)'s residential electricity rate and 2026 solar payback?

City of Brenham - (TX) averages 10.36 c/kWh (-5.04 c/kWh vs Texas average vs. Texas). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,119/yr (21.1-year payback).

### How reliable is City of Brenham - (TX) compared to peer Texas utilities?

City of Brenham - (TX) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 211.1 min/yr); compare rates and outage history directly with Tesla Inc. (13.31 c/kWh) across Texas.

### Which counties and customers does City of Brenham - (TX) serve in Texas?

EIA-861 filings list 6,073 customers across 1 county including Washington, with 18 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Brenham - (TX).

## Related Pages

Explore Texas energy benchmarks, Tesla Inc., county outage profiles, and NEC 705.12 tools alongside City of Brenham - (TX).

[Texas State Energy Rates & Utilities](https://epri-peac.com/states/texas/) [All Texas County Power & Outage Profiles](https://epri-peac.com/counties/texas/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.36 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
