Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Weakley County Mun Elec Sys (EIA ID 20228, TN) serves 15,323 customers at 12.29 c/kWh (-0.93 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (3 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 20228

- **Res. Rate** : 12.29 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Weakley County Mun Elec Sys Compare on Tariffs and Reliability?

How Weakley County Mun Elec Sys (Municipal) performs across 3 counties on kWh rates and outage resilience. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Across 3 counties including Gibson, Obion, Weakley, Weakley County Mun Elec Sys offers a low 12.29 c/kWh residential rate (-6.25 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.8 years without federal 25D compared to peer City of Oak Ridge (13.37 c/kWh). With 15,323 customer accounts (Municipal), 2025 Form EIA-861 shows Weakley County Mun Elec Sys did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does Weakley County Mun Elec Sys Sit Across US Utility Rates?

National utility tariff curve marking Weakley County Mun Elec Sys at 12.29 c/kWh vs. 18.54 c/kWh US mean.

## How Does Weakley County Mun Elec Sys Rank Across Cost & Reliability?

Relative ranking of Weakley County Mun Elec Sys on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Weakley County Mun Elec Sys?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Weakley County Mun Elec Sys in Tennessee.

Lowest Rate #460 / 1,989

### 12.29 c/kWh (-0.93 vs TN)

Commercial avg: 12.73 c/kWh; Industrial: 9.56 c/kWh; est. residential bill $164.58/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 17.8 Years @ 12.29 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,327/yr at 1,350 kWh/kW.

Service Territory

### 15,323 Customers · 3 Counties

Serves 3 counties including Gibson, Obion, Weakley in Tennessee; state FEMA declarations (2015-2026): 35.

Weakley County Mun Elec Sys Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1229 = $1,327/yr

EIA-861 2025 Utility ID 20228: Rate=12.29 c/kWh, Cust=15,323.

**Result:** 17.8 yr 8 kW cash payback at 12.29 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Weakley County Mun Elec Sys?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Weakley County Mun Elec Sys. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Form EIA-861 2025 filing metrics for Weakley County Mun Elec Sys (Utility ID 20228).

| EIA Utility ID & BA Code | ID 20228 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.29 c/kWh Res · 12.73 c Comm · 9.56 c Ind |
| Avg Monthly Usage & Bill | 1,338.8 kWh/mo ($164.58/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Gibson, Obion, Weakley) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by City of Oak Ridge (13.37 c/kWh). Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Oak Ridge**](https://epri-peac.com/utilities/tn-city-of-oak-ridge-13933/) | 13.37 c | — | 0 | 15,586 |
| [**City of Cookeville - (TN)**](https://epri-peac.com/utilities/tn-city-of-cookeville-tn-4294/) | 11.85 c | — | 0 | 16,182 |
| [**City of Paris - (TN)**](https://epri-peac.com/utilities/tn-city-of-paris-tn-14455/) | 12.29 c | 488.3 min | 0 | 16,316 |
| [**Plateau Electric Cooperative**](https://epri-peac.com/utilities/tn-plateau-electric-cooperative-15141/) | 14.04 c | 26.0 min | 0 | 14,323 |

What to Check & Best-Fit Scenarios

## What Should Weakley County Mun Elec Sys Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Weakley County Mun Elec Sys (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Not a substitute for meter bills: tiered and seasonal kWh blocks inside Weakley County Mun Elec Sys (TN) shift real bills away from 12.29 c/kWh.
- Outage clustering: Major Event Days skew Weakley County Mun Elec Sys annual minutes differently than routine non-storm reliability.

### Weakley County Mun Elec Sys Solar & Battery Evaluators

Compare your actual Weakley County Mun Elec Sys monthly kWh statement against 12.29 c/kWh and verify current export tariffs in TN.

### Weakley County Mun Elec Sys Outage & Generator Planners

Use Weakley County Mun Elec Sys's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Weakley County Mun Elec Sys (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Weakley County Mun Elec Sys's residential electricity rate and 2026 solar payback?

Weakley County Mun Elec Sys averages 12.29 c/kWh (-0.93 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,327/yr (17.8-year payback).

### How reliable is Weakley County Mun Elec Sys compared to peer Tennessee utilities?

Weakley County Mun Elec Sys did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with City of Oak Ridge (13.37 c/kWh) across Tennessee.

### Which counties and customers does Weakley County Mun Elec Sys serve in Tennessee?

EIA-861 filings list 15,323 customers across 3 counties including Gibson, Obion, Weakley, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Weakley County Mun Elec Sys.

## Related Pages

Explore Tennessee energy benchmarks, City of Oak Ridge, county outage profiles, and NEC 705.12 tools alongside Weakley County Mun Elec Sys.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.29 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)