# Fort Loudoun Electric Coop (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Fort Loudoun Electric Coop (EIA ID 6608, TN) serves 30,743 customers at 12.83 c/kWh (-0.39 c/kWh vs Tennessee average) with 529.5 min/yr SAIDI (8.82 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 6608

- **Res. Rate** : 12.83 c/kWh

- **SAIDI (All Events)** : 529.5 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Fort Loudoun Electric Coop Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.39 c/kWh vs Tennessee average), customer scale (30,743), and 2026 solar payback benchmarks for Fort Loudoun Electric Coop.

Serving 30,743 customers across 3 counties including Blount, Loudon, Monroe in Tennessee, Fort Loudoun Electric Coop (Cooperative, Balancing Authority TVA) offers a low 12.83 c/kWh residential rate (-5.71 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.0 years without federal 25D. Grid filings show the utility logged 529.5 SAIDI outage minutes (8.82 hrs/yr, 18.2% storm-driven), making battery backup or a standby ATS worthwhile, with zero residential net-metered PV reported in 2025 filings.

## Where Does Fort Loudoun Electric Coop Sit Across US Utility Rates?

Positions Fort Loudoun Electric Coop (12.83 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does Fort Loudoun Electric Coop Rank Across Cost & Reliability?

Percentile placement of Fort Loudoun Electric Coop across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Fort Loudoun Electric Coop?

Four key EIA-861 rate, outage, and solar payback benchmarks for Fort Loudoun Electric Coop (Cooperative) in Tennessee. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Lowest Rate #598 / 1,989

### 12.83 c/kWh (-0.39 vs TN)

Commercial avg: 14.36 c/kWh; Industrial: 7.36 c/kWh; est. residential bill $175.54/mo.

Reliability #643 / 751

### 529.5 min/yr (8.82 hrs)

18.2% (96.2 min) from Major Event Days; avg restore 186.8 min (~5.6 kWh @ 1.8 kW).

Post-25D Payback

### 17.0 Years @ 12.83 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,386/yr at 1,350 kWh/kW.

Service Territory

### 30,743 Customers · 3 Counties

Serves 3 counties including Blount, Loudon, Monroe in Tennessee; state FEMA declarations (2015-2026): 35.

Fort Loudoun Electric Coop Reliability & Solar Offset Calculation

Backup_Energy = (186.8 min / 60) * 1.8 kW = 5.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1283 = $1,386/yr

EIA-861 2025 Utility ID 6608: Rate=12.83 c/kWh, Cust=30,743, SAIDI=529.5 min.

**Result:** 8.82 outage hrs/yr; 17.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Fort Loudoun Electric Coop?

Complete Form EIA-861 filing summary for Fort Loudoun Electric Coop (ID 6608) covering sales, PV, and counties. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for Fort Loudoun Electric Coop (Utility ID 6608).

| EIA Utility ID & BA Code | ID 6608 · TVA |
|---|---|
| State & Ownership Type | TN · Cooperative |
| Retail Electricity Rates | 12.83 c/kWh Res · 14.36 c Comm · 7.36 c Ind |
| Avg Monthly Usage & Bill | 1,368.3 kWh/mo ($175.54/mo est.) |
| SAIDI (All Events w/ MED) | 529.5 min/yr (8.82 hrs/yr) |
| SAIDI (Without Major Events) | 433.3 min/yr (Storm share: 18.2%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.835 /yr · 186.8 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Blount, Loudon, Monroe) |

## Which Peer Electric Utilities Operate in TN?

Compare Fort Loudoun Electric Coop directly with City of Dickson and nearby Tennessee electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Dickson**](https://epri-peac.com/utilities/tn-city-of-dickson-5148/) | 13.0 c | 391.0 min | 0 | 31,000 |
| [**Meriwether Lewis Electric Coop**](https://epri-peac.com/utilities/tn-meriwether-lewis-electric-coop-12330/) | 14.24 c | — | 0 | 30,485 |
| [**City of Bristol - (TN)**](https://epri-peac.com/utilities/tn-city-of-bristol-tn-2247/) | 11.54 c | 59.1 min | 0 | 30,081 |
| [**Caney Fork Electric Coop, Inc**](https://epri-peac.com/utilities/tn-caney-fork-electric-coop-inc-2960/) | 13.6 c | — | 0 | 29,863 |

What to Check & Best-Fit Scenarios

## What Should Fort Loudoun Electric Coop Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Fort Loudoun Electric Coop (Cooperative, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Fort Loudoun Electric Coop's 12.83 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Fort Loudoun Electric Coop system-wide SAIDI averages rural and urban circuits across its TN territory or nearby City of Dickson.

### Fort Loudoun Electric Coop Solar & Battery Evaluators

Compare your actual Fort Loudoun Electric Coop monthly kWh statement against 12.83 c/kWh and verify current export tariffs in TN.

### Fort Loudoun Electric Coop Outage & Generator Planners

Use Fort Loudoun Electric Coop's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Fort Loudoun Electric Coop (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Fort Loudoun Electric Coop's residential electricity rate and 2026 solar payback?

Fort Loudoun Electric Coop averages 12.83 c/kWh (-0.39 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,386/yr (17.0-year payback).

### How reliable is Fort Loudoun Electric Coop compared to peer Tennessee utilities?

Fort Loudoun Electric Coop logged 529.5 SAIDI outage minutes (8.82 hrs/yr, 18.2% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Dickson (13.0 c/kWh) across Tennessee.

### Which counties and customers does Fort Loudoun Electric Coop serve in Tennessee?

EIA-861 filings list 30,743 customers across 3 counties including Blount, Loudon, Monroe, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Fort Loudoun Electric Coop.

## Related Pages

Explore Tennessee energy benchmarks, City of Dickson, county outage profiles, and NEC 705.12 tools alongside Fort Loudoun Electric Coop.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.83 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)