---
title: "City of Paris - (TN) (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-city-of-paris-tn-14455/
description: "2025 EIA-861 profile for City of Paris - (TN) (TN): 12.29 c/kWh rate, SAIDI 488.3 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Paris - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Paris - (TN) (EIA ID 14455, TN) serves 16,316 customers at 12.29 c/kWh (-0.93 c/kWh vs Tennessee average) with 488.3 min/yr SAIDI (8.14 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14455

- **Res. Rate** : 12.29 c/kWh

- **SAIDI (All Events)** : 488.3 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Paris - (TN) Compare on Tariffs and Reliability?

EIA-861 rate delta (-0.93 c/kWh vs Tennessee average), customer scale (16,316), and 2026 solar payback benchmarks for City of Paris - (TN).

Ranked #460 of 1,989 reporting US utilities for residential rate (top 23.3%; lower than 76.7% of peers), City of Paris - (TN) serves 16,316 accounts in Tennessee (Municipal). Commercial power averages 12.9 c/kWh. It logged 488.3 SAIDI outage minutes (8.14 hrs/yr, 9.1% storm-driven), making battery backup or a standby ATS worthwhile, with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Paris - (TN) Sit Across US Utility Rates?

Positions City of Paris - (TN) (12.29 c/kWh) across 1,989 US electric utility residential tariffs. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does City of Paris - (TN) Rank Across Cost & Reliability?

Percentile placement of City of Paris - (TN) across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for City of Paris - (TN)?

Four key EIA-861 rate, outage, and solar payback benchmarks for City of Paris - (TN) (Municipal) in Tennessee. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Lowest Rate #460 / 1,989

### 12.29 c/kWh (-0.93 vs TN)

Commercial avg: 12.9 c/kWh; Industrial: 6.2 c/kWh; est. residential bill $140.16/mo.

Reliability #628 / 751

### 488.3 min/yr (8.14 hrs)

9.1% (44.6 min) from Major Event Days; avg restore 95.2 min (~2.9 kWh @ 1.8 kW).

Post-25D Payback

### 17.8 Years @ 12.29 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,327/yr at 1,350 kWh/kW.

Service Territory

### 16,316 Customers · 1 County

Serves 1 county including Henry in Tennessee; state FEMA declarations (2015-2026): 35.

City of Paris - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (95.2 min / 60) * 1.8 kW = 2.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1229 = $1,327/yr

EIA-861 2025 Utility ID 14455: Rate=12.29 c/kWh, Cust=16,316, SAIDI=488.3 min.

**Result:** 8.14 outage hrs/yr; 17.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Paris - (TN)?

Complete Form EIA-861 filing summary for City of Paris - (TN) (ID 14455) covering sales, PV, and counties. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Paris - (TN) (Utility ID 14455).

| EIA Utility ID & BA Code | ID 14455 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.29 c/kWh Res · 12.9 c Comm · 6.2 c Ind |
| Avg Monthly Usage & Bill | 1,140.8 kWh/mo ($140.16/mo est.) |
| SAIDI (All Events w/ MED) | 488.3 min/yr (8.14 hrs/yr) |
| SAIDI (Without Major Events) | 443.7 min/yr (Storm share: 9.1%) |
| SAIFI & CAIDI (Per-Outage Avg) | 5.127 /yr · 95.2 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Henry) |

## Which Peer Electric Utilities Operate in TN?

Compare City of Paris - (TN) directly with City of Cookeville - (TN) and nearby Tennessee electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Cookeville - (TN)**](https://epri-peac.com/utilities/tn-city-of-cookeville-tn-4294/) | 11.85 c | — | 0 | 16,182 |
| [**Pickwick Electric Coop**](https://epri-peac.com/utilities/tn-pickwick-electric-coop-15016/) | 13.42 c | — | 0 | 16,595 |
| [**City of Fayetteville**](https://epri-peac.com/utilities/tn-city-of-fayetteville-6234/) | 12.49 c | 228.8 min | 0 | 16,729 |
| [**Tennessee Valley Electric Coop**](https://epri-peac.com/utilities/tn-tennessee-valley-electric-coop-18643/) | 13.03 c | — | 0 | 16,919 |

What to Check & Best-Fit Scenarios

## What Should City of Paris - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Paris - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Paris - (TN) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Paris - (TN)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Paris - (TN) Solar & Battery Evaluators

Compare your actual City of Paris - (TN) monthly kWh statement against 12.29 c/kWh and verify current export tariffs in TN.

### City of Paris - (TN) Outage & Generator Planners

Use City of Paris - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Paris - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Paris - (TN)'s residential electricity rate and 2026 solar payback?

City of Paris - (TN) averages 12.29 c/kWh (-0.93 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,327/yr (17.8-year payback).

### How reliable is City of Paris - (TN) compared to peer Tennessee utilities?

City of Paris - (TN) logged 488.3 SAIDI outage minutes (8.14 hrs/yr, 9.1% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with City of Cookeville - (TN) (11.85 c/kWh) across Tennessee.

### Which counties and customers does City of Paris - (TN) serve in Tennessee?

EIA-861 filings list 16,316 customers across 1 county including Henry, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Paris - (TN).

## Related Pages

Explore Tennessee energy benchmarks, City of Cookeville - (TN), county outage profiles, and NEC 705.12 tools alongside City of Paris - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.29 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
