# City of Morristown - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Morristown - (TN) (EIA ID 12988, TN) serves 13,571 customers at 13.4 c/kWh (+0.18 c/kWh vs Tennessee average) with 125.8 min/yr SAIDI (2.1 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 12988

- **Res. Rate** : 13.4 c/kWh

- **SAIDI (All Events)** : 125.8 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Morristown - (TN) Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.4 c/kWh), and outage history inside City of Morristown - (TN) territory. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Evaluating solar or generator backup under City of Morristown - (TN) (Tennessee) starts with its 13.4 c/kWh residential baseline (+0.18 c/kWh vs Tennessee average) and 16.3-year 8 kW cash payback. EIA-861 records show City of Morristown - (TN) recorded 125.8 SAIDI outage minutes (2.1 hrs/yr, rank #287 of 751 reporting utilities) across 13,571 accounts.

## Where Does City of Morristown - (TN) Sit Across US Utility Rates?

Benchmarking City of Morristown - (TN)'s 13.4 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does City of Morristown - (TN) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Morristown - (TN) across Tennessee utilities. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

## What Do EIA-861 Benchmarks Show for City of Morristown - (TN)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Morristown - (TN) in 2025.

Lowest Rate #782 / 1,989

### 13.4 c/kWh (+0.18 vs TN)

Commercial avg: 12.2 c/kWh; Industrial: 7.27 c/kWh; est. residential bill $146.44/mo.

Reliability #287 / 751

### 125.8 min/yr (2.1 hrs)

50.1% (63.0 min) from Major Event Days; avg restore 50.2 min (~1.5 kWh @ 1.8 kW).

Post-25D Payback

### 16.3 Years @ 13.4 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,447/yr at 1,350 kWh/kW.

Service Territory

### 13,571 Customers · 1 County

Serves 1 county including Hamblen in Tennessee; state FEMA declarations (2015-2026): 35.

City of Morristown - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (50.2 min / 60) * 1.8 kW = 1.5 kWh/event | Solar_Offset = 10,800 kWh * $0.1340 = $1,447/yr

EIA-861 2025 Utility ID 12988: Rate=13.4 c/kWh, Cust=13,571, SAIDI=125.8 min.

**Result:** 2.1 outage hrs/yr; 16.3 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Morristown - (TN)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 12988. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

Form EIA-861 2025 filing metrics for City of Morristown - (TN) (Utility ID 12988).

| EIA Utility ID & BA Code | ID 12988 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 13.4 c/kWh Res · 12.2 c Comm · 7.27 c Ind |
| Avg Monthly Usage & Bill | 1,093.0 kWh/mo ($146.44/mo est.) |
| SAIDI (All Events w/ MED) | 125.8 min/yr (2.1 hrs/yr) |
| SAIDI (Without Major Events) | 62.8 min/yr (Storm share: 50.1%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.507 /yr · 50.2 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Hamblen) |

## Which Peer Electric Utilities Operate in TN?

Benchmark City of Morristown - (TN) directly against Loudon Utilities Board and peer Tennessee retail electric power providers. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Loudon Utilities Board**](https://epri-peac.com/utilities/tn-loudon-utilities-board-11222/) | 12.24 c | — | 0 | 12,846 |
| [**Plateau Electric Cooperative**](https://epri-peac.com/utilities/tn-plateau-electric-cooperative-15141/) | 14.04 c | 26.0 min | 0 | 14,323 |
| [**City of Pulaski - (TN)**](https://epri-peac.com/utilities/tn-city-of-pulaski-tn-15507/) | 14.1 c | 442.5 min | 0 | 12,496 |
| [**Mountain Electric Coop, Inc**](https://epri-peac.com/utilities/tn-mountain-electric-coop-inc-13027/) | 13.09 c | 79.3 min | 0 | 12,388 |

What to Check & Best-Fit Scenarios

## What Should City of Morristown - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Morristown - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Morristown - (TN) acts as a wires-only TDU or bundled utility in TN.
- Transformer limits: City of Morristown - (TN) interconnection engineering still checks neighborhood transformer kVA regardless of 125.8 SAIDI.

### City of Morristown - (TN) Solar & Battery Evaluators

Compare your actual City of Morristown - (TN) monthly kWh statement against 13.4 c/kWh and verify current export tariffs in TN.

### City of Morristown - (TN) Outage & Generator Planners

Use City of Morristown - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Morristown - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Morristown - (TN)'s residential electricity rate and 2026 solar payback?

City of Morristown - (TN) averages 13.4 c/kWh (+0.18 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,447/yr (16.3-year payback).

### How reliable is City of Morristown - (TN) compared to peer Tennessee utilities?

City of Morristown - (TN) recorded 125.8 SAIDI outage minutes (2.1 hrs/yr, rank #287 of 751 reporting utilities); compare rates and outage history directly with Loudon Utilities Board (12.24 c/kWh) across Tennessee.

### Which counties and customers does City of Morristown - (TN) serve in Tennessee?

EIA-861 filings list 13,571 customers across 1 county including Hamblen, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Morristown - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Loudon Utilities Board, county outage profiles, and NEC 705.12 tools alongside City of Morristown - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.4 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)