Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Lexington - (TN) (EIA ID 10968, TN) serves 17,991 customers at 12.8 c/kWh (-0.42 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (4 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10968

- **Res. Rate** : 12.8 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Lexington - (TN) Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.8 c/kWh), and outage history inside City of Lexington - (TN) territory. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Evaluating solar or generator backup under City of Lexington - (TN) (Tennessee) starts with its 12.8 c/kWh residential baseline (-0.42 c/kWh vs Tennessee average) and 17.1-year 8 kW cash payback. EIA-861 records show City of Lexington - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr) across 17,991 accounts.

## Where Does City of Lexington - (TN) Sit Across US Utility Rates?

Benchmarking City of Lexington - (TN)'s 12.8 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does City of Lexington - (TN) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Lexington - (TN) across Tennessee utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for City of Lexington - (TN)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Lexington - (TN) in 2025.

Lowest Rate #588 / 1,989

### 12.8 c/kWh (-0.42 vs TN)

Commercial avg: 13.75 c/kWh; Industrial: 9.63 c/kWh; est. residential bill $140.45/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 17.1 Years @ 12.8 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,382/yr at 1,350 kWh/kW.

Service Territory

### 17,991 Customers · 4 Counties

Serves 4 counties including Carroll, Decatur, Hardin in Tennessee; state FEMA declarations (2015-2026): 35.

City of Lexington - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1280 = $1,382/yr

EIA-861 2025 Utility ID 10968: Rate=12.8 c/kWh, Cust=17,991.

**Result:** 17.1 yr 8 kW cash payback at 12.8 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Lexington - (TN)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 10968. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Form EIA-861 2025 filing metrics for City of Lexington - (TN) (Utility ID 10968).

| EIA Utility ID & BA Code | ID 10968 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.8 c/kWh Res · 13.75 c Comm · 9.63 c Ind |
| Avg Monthly Usage & Bill | 1,097.0 kWh/mo ($140.45/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 4 counties (Carroll, Decatur, Hardin, Henderson) |

## Which Peer Electric Utilities Operate in TN?

Benchmark City of Lexington - (TN) directly against City of Lawrenceburg and peer Tennessee retail electric power providers. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Lawrenceburg**](https://epri-peac.com/utilities/tn-city-of-lawrenceburg-10799/) | 13.0 c | — | 0 | 18,239 |
| [**Tennessee Valley Electric Coop**](https://epri-peac.com/utilities/tn-tennessee-valley-electric-coop-18643/) | 13.03 c | — | 0 | 16,919 |
| [**City of Fayetteville**](https://epri-peac.com/utilities/tn-city-of-fayetteville-6234/) | 12.49 c | 228.8 min | 0 | 16,729 |
| [**Pickwick Electric Coop**](https://epri-peac.com/utilities/tn-pickwick-electric-coop-15016/) | 13.42 c | — | 0 | 16,595 |

What to Check & Best-Fit Scenarios

## What Should City of Lexington - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Lexington - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Lexington - (TN) acts as a wires-only TDU or bundled utility in TN.
- Transformer limits: City of Lexington - (TN) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Lexington - (TN) Solar & Battery Evaluators

Compare your actual City of Lexington - (TN) monthly kWh statement against 12.8 c/kWh and verify current export tariffs in TN.

### City of Lexington - (TN) Outage & Generator Planners

Use City of Lexington - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Lexington - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Lexington - (TN)'s residential electricity rate and 2026 solar payback?

City of Lexington - (TN) averages 12.8 c/kWh (-0.42 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,382/yr (17.1-year payback).

### How reliable is City of Lexington - (TN) compared to peer Tennessee utilities?

City of Lexington - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with City of Lawrenceburg (13.0 c/kWh) across Tennessee.

### Which counties and customers does City of Lexington - (TN) serve in Tennessee?

EIA-861 filings list 17,991 customers across 4 counties including Carroll, Decatur, Hardin, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Lexington - (TN).

## Related Pages

Explore Tennessee energy benchmarks, City of Lawrenceburg, county outage profiles, and NEC 705.12 tools alongside City of Lexington - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.8 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)