---
title: "City of Lenoir - (TN) (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-city-of-lenoir-tn-10906/
description: "2025 EIA-861 profile for City of Lenoir - (TN) (TN): 12.82 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Lenoir - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Lenoir - (TN) (EIA ID 10906, TN) serves 63,379 customers at 12.82 c/kWh (-0.40 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (3 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 10906

- **Res. Rate** : 12.82 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Lenoir - (TN) Compare on Tariffs and Reliability?

How City of Lenoir - (TN) (Municipal) performs across 3 counties on kWh rates and outage resilience. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Across 3 counties including Knox, Loudon, Roane, City of Lenoir - (TN) offers a low 12.82 c/kWh residential rate (-5.72 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.0 years without federal 25D compared to peer Duck River Elec Member Corp (13.59 c/kWh). With 63,379 customer accounts (Municipal), 2025 Form EIA-861 shows City of Lenoir - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Lenoir - (TN) Sit Across US Utility Rates?

National utility tariff curve marking City of Lenoir - (TN) at 12.82 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Lenoir - (TN) Rank Across Cost & Reliability?

Relative ranking of City of Lenoir - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for City of Lenoir - (TN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Lenoir - (TN) in Tennessee.

Lowest Rate #596 / 1,989

### 12.82 c/kWh (-0.40 vs TN)

Commercial avg: 12.63 c/kWh; Industrial: 5.31 c/kWh; est. residential bill $158.94/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 17.0 Years @ 12.82 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,385/yr at 1,350 kWh/kW.

Service Territory

### 63,379 Customers · 3 Counties

Serves 3 counties including Knox, Loudon, Roane in Tennessee; state FEMA declarations (2015-2026): 35.

City of Lenoir - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1282 = $1,385/yr

EIA-861 2025 Utility ID 10906: Rate=12.82 c/kWh, Cust=63,379.

**Result:** 17.0 yr 8 kW cash payback at 12.82 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Lenoir - (TN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Lenoir - (TN). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for City of Lenoir - (TN) (Utility ID 10906).

| EIA Utility ID & BA Code | ID 10906 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.82 c/kWh Res · 12.63 c Comm · 5.31 c Ind |
| Avg Monthly Usage & Bill | 1,240.1 kWh/mo ($158.94/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Knox, Loudon, Roane) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by Duck River Elec Member Corp (13.59 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Duck River Elec Member Corp**](https://epri-peac.com/utilities/tn-duck-river-elec-member-corp-5399/) | 13.59 c | 190.4 min | 0 | 71,969 |
| [**Johnson City - (TN)**](https://epri-peac.com/utilities/tn-johnson-city-tn-9777/) | 13.22 c | 100.6 min | 0 | 72,729 |
| [**City of Clarksville - (TN)**](https://epri-peac.com/utilities/tn-city-of-clarksville-tn-3704/) | 13.67 c | 117.2 min | 0 | 77,509 |
| [**Upper Cumberland E M C**](https://epri-peac.com/utilities/tn-upper-cumberland-e-m-c-19574/) | 13.71 c | — | 0 | 45,862 |

What to Check & Best-Fit Scenarios

## What Should City of Lenoir - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Lenoir - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Lenoir - (TN)'s 12.82 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Lenoir - (TN) system-wide SAIDI averages rural and urban circuits across its TN territory or nearby Duck River Elec Member Corp.

### City of Lenoir - (TN) Solar & Battery Evaluators

Compare your actual City of Lenoir - (TN) monthly kWh statement against 12.82 c/kWh and verify current export tariffs in TN.

### City of Lenoir - (TN) Outage & Generator Planners

Use City of Lenoir - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Lenoir - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Lenoir - (TN)'s residential electricity rate and 2026 solar payback?

City of Lenoir - (TN) averages 12.82 c/kWh (-0.40 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,385/yr (17.0-year payback).

### How reliable is City of Lenoir - (TN) compared to peer Tennessee utilities?

City of Lenoir - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with Duck River Elec Member Corp (13.59 c/kWh) across Tennessee.

### Which counties and customers does City of Lenoir - (TN) serve in Tennessee?

EIA-861 filings list 63,379 customers across 3 counties including Knox, Loudon, Roane, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Lenoir - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Duck River Elec Member Corp, county outage profiles, and NEC 705.12 tools alongside City of Lenoir - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.82 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
