EIA-861 Grid Reliability & Net Metering

# City of Jellico (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Jellico (EIA ID 9697, TN) serves 1,621 customers at 14.06 c/kWh (+0.84 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 9697

- **Res. Rate** : 14.06 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Jellico Compare on Tariffs and Reliability?

Solar payback, residential tariff (14.06 c/kWh), and outage history inside City of Jellico territory. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

Evaluating solar or generator backup under City of Jellico (Tennessee) starts with its 14.06 c/kWh residential baseline (+0.84 c/kWh vs Tennessee average) and 15.5-year 8 kW cash payback. EIA-861 records show City of Jellico did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr) across 1,621 accounts.

## Where Does City of Jellico Sit Across US Utility Rates?

Benchmarking City of Jellico's 14.06 c/kWh residential rate against 1,989 EIA-861 utilities. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## How Does City of Jellico Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Jellico across Tennessee utilities. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

## What Do EIA-861 Benchmarks Show for City of Jellico?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Jellico in 2025. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Lowest Rate #996 / 1,989

### 14.06 c/kWh (+0.84 vs TN)

Commercial avg: 15.31 c/kWh; Industrial: 5.35 c/kWh; est. residential bill $161.99/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 15.5 Years @ 14.06 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,518/yr at 1,350 kWh/kW.

Service Territory

### 1,621 Customers · 1 County

Serves 1 county including Campbell in Tennessee; state FEMA declarations (2015-2026): 35.

City of Jellico Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1406 = $1,518/yr

EIA-861 2025 Utility ID 9697: Rate=14.06 c/kWh, Cust=1,621.

**Result:** 15.5 yr 8 kW cash payback at 14.06 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Jellico?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 9697. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Form EIA-861 2025 filing metrics for City of Jellico (Utility ID 9697).

| EIA Utility ID & BA Code | ID 9697 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 14.06 c/kWh Res · 15.31 c Comm · 5.35 c Ind |
| Avg Monthly Usage & Bill | 1,152.5 kWh/mo ($161.99/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Campbell) |

## Which Peer Electric Utilities Operate in TN?

Benchmark City of Jellico directly against City of Newbern and peer Tennessee retail electric power providers. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Newbern**](https://epri-peac.com/utilities/tn-city-of-newbern-13437/) | 10.89 c | — | 0 | 1,500 |
| [**City of Trenton - (TN)**](https://epri-peac.com/utilities/tn-city-of-trenton-tn-19149/) | 13.58 c | — | 0 | 1,959 |
| [**French Broad Elec Member Corp**](https://epri-peac.com/utilities/tn-french-broad-elec-member-corp-6784/) | 16.4 c | — | 0 | 1,003 |
| [**City of Sparta**](https://epri-peac.com/utilities/tn-city-of-sparta-17740/) | 12.5 c | — | 0 | 2,270 |

What to Check & Best-Fit Scenarios

## What Should City of Jellico Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Jellico (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Jellico (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Jellico's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Jellico Solar & Battery Evaluators

Compare your actual City of Jellico monthly kWh statement against 14.06 c/kWh and verify current export tariffs in TN.

### City of Jellico Outage & Generator Planners

Use City of Jellico's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Jellico (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

### What is City of Jellico's residential electricity rate and 2026 solar payback?

City of Jellico averages 14.06 c/kWh (+0.84 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,518/yr (15.5-year payback).

### How reliable is City of Jellico compared to peer Tennessee utilities?

City of Jellico did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with City of Newbern (10.89 c/kWh) across Tennessee.

### Which counties and customers does City of Jellico serve in Tennessee?

EIA-861 filings list 1,621 customers across 1 county including Campbell, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Jellico.

## Related Pages

Explore Tennessee energy benchmarks, City of Newbern, county outage profiles, and NEC 705.12 tools alongside City of Jellico.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.06 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)