title: "City of Harriman - (TN) (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-city-of-harriman-tn-8147/
description: "2025 EIA-861 profile for City of Harriman - (TN) (TN): 14.04 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Harriman - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Harriman - (TN) (EIA ID 8147, TN) serves 9,375 customers at 14.04 c/kWh (+0.82 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (2 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 8147

- **Res. Rate** : 14.04 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Harriman - (TN) Compare on Tariffs and Reliability?

Solar payback, residential tariff (14.04 c/kWh), and outage history inside City of Harriman - (TN) territory. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Evaluating solar or generator backup under City of Harriman - (TN) (Tennessee) starts with its 14.04 c/kWh residential baseline (+0.82 c/kWh vs Tennessee average) and 15.6-year 8 kW cash payback. EIA-861 records show City of Harriman - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr) across 9,375 accounts.

## Where Does City of Harriman - (TN) Sit Across US Utility Rates?

Benchmarking City of Harriman - (TN)'s 14.04 c/kWh residential rate against 1,989 EIA-861 utilities. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## How Does City of Harriman - (TN) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Harriman - (TN) across Tennessee utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## What Do EIA-861 Benchmarks Show for City of Harriman - (TN)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Harriman - (TN) in 2025.

Lowest Rate #985 / 1,989

### 14.04 c/kWh (+0.82 vs TN)

Commercial avg: 15.71 c/kWh; Industrial: 5.03 c/kWh; est. residential bill $161.32/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 15.6 Years @ 14.04 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,516/yr at 1,350 kWh/kW.

Service Territory

### 9,375 Customers · 2 Counties

Serves 2 counties including Morgan, Roane in Tennessee; state FEMA declarations (2015-2026): 35.

City of Harriman - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1404 = $1,516/yr

EIA-861 2025 Utility ID 8147: Rate=14.04 c/kWh, Cust=9,375.

**Result:** 15.6 yr 8 kW cash payback at 14.04 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Harriman - (TN)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 8147. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

Form EIA-861 2025 filing metrics for City of Harriman - (TN) (Utility ID 8147).

| EIA Utility ID & BA Code | ID 8147 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 14.04 c/kWh Res · 15.71 c Comm · 5.03 c Ind |
| Avg Monthly Usage & Bill | 1,149.3 kWh/mo ($161.32/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Morgan, Roane) |

## Which Peer Electric Utilities Operate in TN?

Benchmark City of Harriman - (TN) directly against Tullahoma Board-Public Utils and peer Tennessee retail electric power providers. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Tullahoma Board-Public Utils**](https://epri-peac.com/utilities/tn-tullahoma-board-public-utils-19266/) | 11.72 c | 73.9 min | 0 | 9,324 |
| [**City of Dyersburg**](https://epri-peac.com/utilities/tn-city-of-dyersburg-5509/) | 11.69 c | 25.5 min | 0 | 9,495 |
| [**City of Dayton - (TN)**](https://epri-peac.com/utilities/tn-city-of-dayton-tn-4920/) | 12.55 c | — | 0 | 9,149 |
| [**Bolivar Energy Authority**](https://epri-peac.com/utilities/tn-bolivar-energy-authority-1936/) | 14.17 c | 564.1 min | 0 | 8,913 |

What to Check & Best-Fit Scenarios

## What Should City of Harriman - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Harriman - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Harriman - (TN) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Harriman - (TN)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Harriman - (TN) Solar & Battery Evaluators

Compare your actual City of Harriman - (TN) monthly kWh statement against 14.04 c/kWh and verify current export tariffs in TN.

### City of Harriman - (TN) Outage & Generator Planners

Use City of Harriman - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Harriman - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Harriman - (TN)'s residential electricity rate and 2026 solar payback?

City of Harriman - (TN) averages 14.04 c/kWh (+0.82 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,516/yr (15.6-year payback).

### How reliable is City of Harriman - (TN) compared to peer Tennessee utilities?

City of Harriman - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with Tullahoma Board-Public Utils (11.72 c/kWh) across Tennessee.

### Which counties and customers does City of Harriman - (TN) serve in Tennessee?

EIA-861 filings list 9,375 customers across 2 counties including Morgan, Roane, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Harriman - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Tullahoma Board-Public Utils, county outage profiles, and NEC 705.12 tools alongside City of Harriman - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.04 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)