title: "City of Greeneville - (TN) (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-city-of-greeneville-tn-7625/
description: "2025 EIA-861 profile for City of Greeneville - (TN) (TN): 12.69 c/kWh rate, SAIDI 238.0 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Greeneville - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Greeneville - (TN) (EIA ID 7625, TN) serves 32,686 customers at 12.69 c/kWh (-0.53 c/kWh vs Tennessee average) with 238.0 min/yr SAIDI (3.97 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 7625

- **Res. Rate** : 12.69 c/kWh

- **SAIDI (All Events)** : 238.0 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Greeneville - (TN) Compare on Tariffs and Reliability?

How City of Greeneville - (TN) (Municipal) performs across 1 county on kWh rates and outage resilience. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

City of Greeneville - (TN) (Municipal) recorded 238.0 SAIDI outage minutes (3.97 hrs/yr, rank #477 of 751 reporting utilities). Typical residential meters drew 1,244.5 kWh/mo ($157.90/mo) in 2025, while its tariff offers a low 12.69 c/kWh residential rate (-5.85 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.2 years without federal 25D—compare rates directly with City of Jackson - (TN) (12.57 c/kWh).

## Where Does City of Greeneville - (TN) Sit Across US Utility Rates?

National utility tariff curve marking City of Greeneville - (TN) at 12.69 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Greeneville - (TN) Rank Across Cost & Reliability?

Relative ranking of City of Greeneville - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for City of Greeneville - (TN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Greeneville - (TN) in Tennessee.

Lowest Rate #559 / 1,989

### 12.69 c/kWh (-0.53 vs TN)

Commercial avg: 13.58 c/kWh; Industrial: 6.98 c/kWh; est. residential bill $157.90/mo.

Reliability #477 / 751

### 238.0 min/yr (3.97 hrs)

51.5% (122.6 min) from Major Event Days; avg restore 128.4 min (~3.9 kWh @ 1.8 kW).

Post-25D Payback

### 17.2 Years @ 12.69 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,371/yr at 1,350 kWh/kW.

Service Territory

### 32,686 Customers · 1 County

Serves 1 county including Greene in Tennessee; state FEMA declarations (2015-2026): 35.

City of Greeneville - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (128.4 min / 60) * 1.8 kW = 3.9 kWh/event | Solar_Offset = 10,800 kWh * $0.1269 = $1,371/yr

EIA-861 2025 Utility ID 7625: Rate=12.69 c/kWh, Cust=32,686, SAIDI=238.0 min.

**Result:** 3.97 outage hrs/yr; 17.2 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Greeneville - (TN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Greeneville - (TN). Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Greeneville - (TN) (Utility ID 7625).

| EIA Utility ID & BA Code | ID 7625 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.69 c/kWh Res · 13.58 c Comm · 6.98 c Ind |
| Avg Monthly Usage & Bill | 1,244.5 kWh/mo ($157.90/mo est.) |
| SAIDI (All Events w/ MED) | 238.0 min/yr (3.97 hrs/yr) |
| SAIDI (Without Major Events) | 115.4 min/yr (Storm share: 51.5%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.854 /yr · 128.4 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Greene) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by City of Jackson - (TN) (12.57 c/kWh). Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Jackson - (TN)**](https://epri-peac.com/utilities/tn-city-of-jackson-tn-9612/) | 12.57 c | 185.5 min | 0 | 32,264 |
| [**Sequachee Valley Electric Coop**](https://epri-peac.com/utilities/tn-sequachee-valley-electric-coop-16930/) | 13.77 c | 304.9 min | 0 | 33,315 |
| [**Columbia Power System - (TN)**](https://epri-peac.com/utilities/tn-columbia-power-system-tn-3855/) | 12.73 c | 142.5 min | 0 | 32,032 |
| [**City of Dickson**](https://epri-peac.com/utilities/tn-city-of-dickson-5148/) | 13.0 c | 391.0 min | 0 | 31,000 |

What to Check & Best-Fit Scenarios

## What Should City of Greeneville - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Greeneville - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Greeneville - (TN) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Greeneville - (TN)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Greeneville - (TN) Solar & Battery Evaluators

Compare your actual City of Greeneville - (TN) monthly kWh statement against 12.69 c/kWh and verify current export tariffs in TN.

### City of Greeneville - (TN) Outage & Generator Planners

Use City of Greeneville - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Greeneville - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Greeneville - (TN)'s residential electricity rate and 2026 solar payback?

City of Greeneville - (TN) averages 12.69 c/kWh (-0.53 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,371/yr (17.2-year payback).

### How reliable is City of Greeneville - (TN) compared to peer Tennessee utilities?

City of Greeneville - (TN) recorded 238.0 SAIDI outage minutes (3.97 hrs/yr, rank #477 of 751 reporting utilities); compare rates and outage history directly with City of Jackson - (TN) (12.57 c/kWh) across Tennessee.

### Which counties and customers does City of Greeneville - (TN) serve in Tennessee?

EIA-861 filings list 32,686 customers across 1 county including Greene, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Greeneville - (TN).

## Related Pages

Explore Tennessee energy benchmarks, City of Jackson - (TN), county outage profiles, and NEC 705.12 tools alongside City of Greeneville - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.69 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)