---
title: "City of Dickson (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-city-of-dickson-5148/
description: "2025 EIA-861 profile for City of Dickson (TN): 13.0 c/kWh rate, SAIDI 391.0 min/yr, 2025 rate & service profile. Source-verified US engineering data."
---

EIA-861 Grid Reliability & Net Metering

# City of Dickson (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Dickson (EIA ID 5148, TN) serves 31,000 customers at 13.0 c/kWh (-0.22 c/kWh vs Tennessee average) with 391.0 min/yr SAIDI (6.52 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 5148

- **Res. Rate** : 13.0 c/kWh

- **SAIDI (All Events)** : 391.0 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Dickson Compare on Tariffs and Reliability?

How City of Dickson (Municipal) performs across 5 counties on kWh rates and outage resilience. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

City of Dickson (Municipal) logged 391.0 SAIDI outage minutes (6.52 hrs/yr, 48.3% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 1,268.4 kWh/mo ($164.87/mo) in 2025, while its tariff offers a low 13.0 c/kWh residential rate (-5.54 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 16.8 years without federal 25D—compare rates directly with Fort Loudoun Electric Coop (12.83 c/kWh).

## Where Does City of Dickson Sit Across US Utility Rates?

National utility tariff curve marking City of Dickson at 13.0 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Dickson Rank Across Cost & Reliability?

Relative ranking of City of Dickson on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for City of Dickson?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Dickson in Tennessee. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Lowest Rate #656 / 1,989

### 13.0 c/kWh (-0.22 vs TN)

Commercial avg: 14.1 c/kWh; Industrial: 9.33 c/kWh; est. residential bill $164.87/mo.

Reliability #585 / 751

### 391.0 min/yr (6.52 hrs)

48.3% (188.8 min) from Major Event Days; avg restore 158.7 min (~4.8 kWh @ 1.8 kW).

Post-25D Payback

### 16.8 Years @ 13.0 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,404/yr at 1,350 kWh/kW.

Service Territory

### 31,000 Customers · 5 Counties

Serves 5 counties including Cheatham, Dickson, Hickman in Tennessee; state FEMA declarations (2015-2026): 35.

City of Dickson Reliability & Solar Offset Calculation

Backup_Energy = (158.7 min / 60) * 1.8 kW = 4.8 kWh/event | Solar_Offset = 10,800 kWh * $0.1300 = $1,404/yr

EIA-861 2025 Utility ID 5148: Rate=13.0 c/kWh, Cust=31,000, SAIDI=391.0 min.

**Result:** 6.52 outage hrs/yr; 16.8 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Dickson?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Dickson. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Dickson (Utility ID 5148).

| EIA Utility ID & BA Code | ID 5148 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 13.0 c/kWh Res · 14.1 c Comm · 9.33 c Ind |
| Avg Monthly Usage & Bill | 1,268.4 kWh/mo ($164.87/mo est.) |
| SAIDI (All Events w/ MED) | 391.0 min/yr (6.52 hrs/yr) |
| SAIDI (Without Major Events) | 202.2 min/yr (Storm share: 48.3%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.463 /yr · 158.7 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 5 counties (Cheatham, Dickson, Hickman, Houston, Montgomery) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by Fort Loudoun Electric Coop (12.83 c/kWh). Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Fort Loudoun Electric Coop**](https://epri-peac.com/utilities/tn-fort-loudoun-electric-coop-6608/) | 12.83 c | 529.5 min | 0 | 30,743 |
| [**Meriwether Lewis Electric Coop**](https://epri-peac.com/utilities/tn-meriwether-lewis-electric-coop-12330/) | 14.24 c | — | 0 | 30,485 |
| [**City of Bristol - (TN)**](https://epri-peac.com/utilities/tn-city-of-bristol-tn-2247/) | 11.54 c | 59.1 min | 0 | 30,081 |
| [**Columbia Power System - (TN)**](https://epri-peac.com/utilities/tn-columbia-power-system-tn-3855/) | 12.73 c | 142.5 min | 0 | 32,032 |

What to Check & Best-Fit Scenarios

## What Should City of Dickson Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Dickson (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Dickson (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Dickson's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Dickson Solar & Battery Evaluators

Compare your actual City of Dickson monthly kWh statement against 13.0 c/kWh and verify current export tariffs in TN.

### City of Dickson Outage & Generator Planners

Use City of Dickson's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Dickson (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

### What is City of Dickson's residential electricity rate and 2026 solar payback?

City of Dickson averages 13.0 c/kWh (-0.22 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,404/yr (16.8-year payback).

### How reliable is City of Dickson compared to peer Tennessee utilities?

City of Dickson logged 391.0 SAIDI outage minutes (6.52 hrs/yr, 48.3% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Fort Loudoun Electric Coop (12.83 c/kWh) across Tennessee.

### Which counties and customers does City of Dickson serve in Tennessee?

EIA-861 filings list 31,000 customers across 5 counties including Cheatham, Dickson, Hickman, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Dickson.

## Related Pages

Explore Tennessee energy benchmarks, Fort Loudoun Electric Coop, county outage profiles, and NEC 705.12 tools alongside City of Dickson.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.0 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)
