# City of Clinton - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Clinton - (TN) (EIA ID 3812, TN) serves 26,320 customers at 13.66 c/kWh (+0.44 c/kWh vs Tennessee average) with 158.6 min/yr SAIDI (2.64 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3812

- **Res. Rate** : 13.66 c/kWh

- **SAIDI (All Events)** : 158.6 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Clinton - (TN) Compare on Tariffs and Reliability?

How City of Clinton - (TN) (Municipal) performs across 6 counties on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

Across 6 counties including Anderson, Campbell, Knox, City of Clinton - (TN) bills residential power at 13.66 c/kWh (+0.44 c/kWh vs Tennessee average vs. Tennessee), offsetting ~$1,475/yr on an 8 kW array compared to peer Holston Electric Coop, Inc (13.97 c/kWh). With 26,320 customer accounts (Municipal), 2025 Form EIA-861 shows City of Clinton - (TN) recorded 158.6 SAIDI outage minutes (2.64 hrs/yr, rank #345 of 751 reporting utilities), with zero residential net-metered PV reported in 2025 filings.

## Where Does City of Clinton - (TN) Sit Across US Utility Rates?

National utility tariff curve marking City of Clinton - (TN) at 13.66 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Clinton - (TN) Rank Across Cost & Reliability?

Relative ranking of City of Clinton - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for City of Clinton - (TN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Clinton - (TN) in Tennessee.

Lowest Rate #860 / 1,989

### 13.66 c/kWh (+0.44 vs TN)

Commercial avg: 13.9 c/kWh; Industrial: 7.2 c/kWh; est. residential bill $166.61/mo.

Reliability #345 / 751

### 158.6 min/yr (2.64 hrs)

25.7% (40.8 min) from Major Event Days; avg restore 80.6 min (~2.4 kWh @ 1.8 kW).

Post-25D Payback

### 16.0 Years @ 13.66 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,475/yr at 1,350 kWh/kW.

Service Territory

### 26,320 Customers · 6 Counties

Serves 6 counties including Anderson, Campbell, Knox in Tennessee; state FEMA declarations (2015-2026): 35.

City of Clinton - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (80.6 min / 60) * 1.8 kW = 2.4 kWh/event | Solar_Offset = 10,800 kWh * $0.1366 = $1,475/yr

EIA-861 2025 Utility ID 3812: Rate=13.66 c/kWh, Cust=26,320, SAIDI=158.6 min.

**Result:** 2.64 outage hrs/yr; 16.0 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Clinton - (TN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Clinton - (TN). Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for City of Clinton - (TN) (Utility ID 3812).

| EIA Utility ID & BA Code | ID 3812 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 13.66 c/kWh Res · 13.9 c Comm · 7.2 c Ind |
| Avg Monthly Usage & Bill | 1,219.4 kWh/mo ($166.61/mo est.) |
| SAIDI (All Events w/ MED) | 158.6 min/yr (2.64 hrs/yr) |
| SAIDI (Without Major Events) | 117.8 min/yr (Storm share: 25.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.967 /yr · 80.6 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 6 counties (Anderson, Campbell, Knox, Morgan, Roane, Union) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by Holston Electric Coop, Inc (13.97 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Holston Electric Coop, Inc**](https://epri-peac.com/utilities/tn-holston-electric-coop-inc-8764/) | 13.97 c | 183.7 min | 0 | 25,947 |
| [**Tri-County Elec Member Corp (TN)**](https://epri-peac.com/utilities/tn-tri-county-elec-member-corp-tn-19162/) | 12.92 c | 527.7 min | 0 | 25,085 |
| [**City of Alcoa Utilities**](https://epri-peac.com/utilities/tn-city-of-alcoa-utilities-577/) | 12.99 c | — | 0 | 28,498 |
| [**City of Gallatin - (TN)**](https://epri-peac.com/utilities/tn-city-of-gallatin-tn-6923/) | 12.79 c | 49.3 min | 0 | 23,744 |

What to Check & Best-Fit Scenarios

## What Should City of Clinton - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Clinton - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: City of Clinton - (TN)'s 13.66 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: City of Clinton - (TN) system-wide SAIDI averages rural and urban circuits across its TN territory or nearby Holston Electric Coop, Inc.

### City of Clinton - (TN) Solar & Battery Evaluators

Compare your actual City of Clinton - (TN) monthly kWh statement against 13.66 c/kWh and verify current export tariffs in TN.

### City of Clinton - (TN) Outage & Generator Planners

Use City of Clinton - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Clinton - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Clinton - (TN)'s residential electricity rate and 2026 solar payback?

City of Clinton - (TN) averages 13.66 c/kWh (+0.44 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,475/yr (16.0-year payback).

### How reliable is City of Clinton - (TN) compared to peer Tennessee utilities?

City of Clinton - (TN) recorded 158.6 SAIDI outage minutes (2.64 hrs/yr, rank #345 of 751 reporting utilities); compare rates and outage history directly with Holston Electric Coop, Inc (13.97 c/kWh) across Tennessee.

### Which counties and customers does City of Clinton - (TN) serve in Tennessee?

EIA-861 filings list 26,320 customers across 6 counties including Anderson, Campbell, Knox, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Clinton - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Holston Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside City of Clinton - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.66 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)