Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Chattanooga - (TN) (EIA ID 3408, TN) serves 164,914 customers at 12.89 c/kWh (-0.33 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (6 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 3408

- **Res. Rate** : 12.89 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Chattanooga - (TN) Compare on Tariffs and Reliability?

Solar payback, residential tariff (12.89 c/kWh), and outage history inside City of Chattanooga - (TN) territory. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Evaluating solar or generator backup under City of Chattanooga - (TN) (Tennessee) starts with its 12.89 c/kWh residential baseline (-0.33 c/kWh vs Tennessee average) and 17.0-year 8 kW cash payback. EIA-861 records show City of Chattanooga - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr) across 164,914 accounts.

## Where Does City of Chattanooga - (TN) Sit Across US Utility Rates?

Benchmarking City of Chattanooga - (TN)'s 12.89 c/kWh residential rate against 1,989 EIA-861 utilities. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does City of Chattanooga - (TN) Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for City of Chattanooga - (TN) across Tennessee utilities. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for City of Chattanooga - (TN)?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by City of Chattanooga - (TN) in 2025.

Lowest Rate #617 / 1,989

### 12.89 c/kWh (-0.33 vs TN)

Commercial avg: 12.46 c/kWh; Industrial: 7.01 c/kWh; est. residential bill $144.47/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 17.0 Years @ 12.89 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,392/yr at 1,350 kWh/kW.

Service Territory

### 164,914 Customers · 6 Counties

Serves 6 counties including Bledsoe, Bradley, Hamilton in Tennessee; state FEMA declarations (2015-2026): 35.

City of Chattanooga - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1289 = $1,392/yr

EIA-861 2025 Utility ID 3408: Rate=12.89 c/kWh, Cust=164,914.

**Result:** 17.0 yr 8 kW cash payback at 12.89 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Chattanooga - (TN)?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 3408. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for City of Chattanooga - (TN) (Utility ID 3408).

| EIA Utility ID & BA Code | ID 3408 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 12.89 c/kWh Res · 12.46 c Comm · 7.01 c Ind |
| Avg Monthly Usage & Bill | 1,121.2 kWh/mo ($144.47/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 6 counties (Bledsoe, Bradley, Hamilton, Marion, Rhea, Sequatchie) |

## Which Peer Electric Utilities Operate in TN?

Benchmark City of Chattanooga - (TN) directly against Knoxville Utilities Board and peer Tennessee retail electric power providers. Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Knoxville Utilities Board**](https://epri-peac.com/utilities/tn-knoxville-utilities-board-10421/) | 13.83 c | 274.0 min | 0 | 196,674 |
| [**Volunteer Electric Coop**](https://epri-peac.com/utilities/tn-volunteer-electric-coop-19898/) | 13.08 c | — | 0 | 105,248 |
| [**Cumberland Elec Member Corp**](https://epri-peac.com/utilities/tn-cumberland-elec-member-corp-4624/) | 13.76 c | — | 0 | 101,734 |
| [**City of Clarksville - (TN)**](https://epri-peac.com/utilities/tn-city-of-clarksville-tn-3704/) | 13.67 c | 117.2 min | 0 | 77,509 |

What to Check & Best-Fit Scenarios

## What Should City of Chattanooga - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Chattanooga - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Chattanooga - (TN) acts as a wires-only TDU or bundled utility in TN.
- Transformer limits: City of Chattanooga - (TN) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Chattanooga - (TN) Solar & Battery Evaluators

Compare your actual City of Chattanooga - (TN) monthly kWh statement against 12.89 c/kWh and verify current export tariffs in TN.

### City of Chattanooga - (TN) Outage & Generator Planners

Use City of Chattanooga - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Chattanooga - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Chattanooga - (TN)'s residential electricity rate and 2026 solar payback?

City of Chattanooga - (TN) averages 12.89 c/kWh (-0.33 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,392/yr (17.0-year payback).

### How reliable is City of Chattanooga - (TN) compared to peer Tennessee utilities?

City of Chattanooga - (TN) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with Knoxville Utilities Board (13.83 c/kWh) across Tennessee.

### Which counties and customers does City of Chattanooga - (TN) serve in Tennessee?

EIA-861 filings list 164,914 customers across 6 counties including Bledsoe, Bradley, Hamilton, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Chattanooga - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Knoxville Utilities Board, county outage profiles, and NEC 705.12 tools alongside City of Chattanooga - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.89 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)