# City of Bristol - (TN) (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Bristol - (TN) (EIA ID 2247, TN) serves 30,081 customers at 11.54 c/kWh (-1.68 c/kWh vs Tennessee average) with 59.1 min/yr SAIDI (0.98 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 2247

- **Res. Rate** : 11.54 c/kWh

- **SAIDI (All Events)** : 59.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Bristol - (TN) Compare on Tariffs and Reliability?

How City of Bristol - (TN) (Municipal) performs across 1 county on kWh rates and outage resilience. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

City of Bristol - (TN) (Municipal) recorded 59.1 SAIDI outage minutes (0.98 hrs/yr, rank #138 of 751 reporting utilities). Typical residential meters drew 1,296.0 kWh/mo ($149.60/mo) in 2025, while its tariff offers a low 11.54 c/kWh residential rate (-7.00 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.9 years without federal 25D—compare rates directly with Caney Fork Electric Coop, Inc (13.6 c/kWh).

## Where Does City of Bristol - (TN) Sit Across US Utility Rates?

National utility tariff curve marking City of Bristol - (TN) at 11.54 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Bristol - (TN) Rank Across Cost & Reliability?

Relative ranking of City of Bristol - (TN) on residential electricity pricing and annual IEEE SAIDI outage duration. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

## What Do EIA-861 Benchmarks Show for City of Bristol - (TN)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Bristol - (TN) in Tennessee.

Lowest Rate #320 / 1,989

### 11.54 c/kWh (-1.68 vs TN)

Commercial avg: 12.86 c/kWh; Industrial: 7.55 c/kWh; est. residential bill $149.60/mo.

Reliability #138 / 751

### 59.1 min/yr (0.98 hrs)

100.0% (59.1 min) from Major Event Days; avg restore 74.9 min (~2.2 kWh @ 1.8 kW).

Post-25D Payback

### 18.9 Years @ 11.54 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,246/yr at 1,350 kWh/kW.

Service Territory

### 30,081 Customers · 1 County

Serves 1 county including Sullivan in Tennessee; state FEMA declarations (2015-2026): 35.

City of Bristol - (TN) Reliability & Solar Offset Calculation

Backup_Energy = (74.9 min / 60) * 1.8 kW = 2.2 kWh/event | Solar_Offset = 10,800 kWh * $0.1154 = $1,246/yr

EIA-861 2025 Utility ID 2247: Rate=11.54 c/kWh, Cust=30,081, SAIDI=59.1 min.

**Result:** 0.98 outage hrs/yr; 18.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Bristol - (TN)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Bristol - (TN). Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for City of Bristol - (TN) (Utility ID 2247).

| EIA Utility ID & BA Code | ID 2247 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 11.54 c/kWh Res · 12.86 c Comm · 7.55 c Ind |
| Avg Monthly Usage & Bill | 1,296.0 kWh/mo ($149.60/mo est.) |
| SAIDI (All Events w/ MED) | 59.1 min/yr (0.98 hrs/yr) |
| SAIDI (Without Major Events) | 0.0 min/yr (Storm share: 100.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 0.79 /yr · 74.9 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Sullivan) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by Caney Fork Electric Coop, Inc (13.6 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Caney Fork Electric Coop, Inc**](https://epri-peac.com/utilities/tn-caney-fork-electric-coop-inc-2960/) | 13.6 c | — | 0 | 29,863 |
| [**City of Cleveland - (TN)**](https://epri-peac.com/utilities/tn-city-of-cleveland-tn-3758/) | 13.34 c | 56.5 min | 0 | 29,740 |
| [**Meriwether Lewis Electric Coop**](https://epri-peac.com/utilities/tn-meriwether-lewis-electric-coop-12330/) | 14.24 c | — | 0 | 30,485 |
| [**Gibson Electric Members Corp**](https://epri-peac.com/utilities/tn-gibson-electric-members-corp-7174/) | 13.72 c | — | 0 | 29,483 |

What to Check & Best-Fit Scenarios

## What Should City of Bristol - (TN) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Bristol - (TN) (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: City of Bristol - (TN) (Municipal) reports historical 2025 EIA-861 averages rather than live rate-case riders in TN.
- Export credit rules: check City of Bristol - (TN)'s active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### City of Bristol - (TN) Solar & Battery Evaluators

Compare your actual City of Bristol - (TN) monthly kWh statement against 11.54 c/kWh and verify current export tariffs in TN.

### City of Bristol - (TN) Outage & Generator Planners

Use City of Bristol - (TN)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Bristol - (TN) (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Bristol - (TN)'s residential electricity rate and 2026 solar payback?

City of Bristol - (TN) averages 11.54 c/kWh (-1.68 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,246/yr (18.9-year payback).

### How reliable is City of Bristol - (TN) compared to peer Tennessee utilities?

City of Bristol - (TN) recorded 59.1 SAIDI outage minutes (0.98 hrs/yr, rank #138 of 751 reporting utilities); compare rates and outage history directly with Caney Fork Electric Coop, Inc (13.6 c/kWh) across Tennessee.

### Which counties and customers does City of Bristol - (TN) serve in Tennessee?

EIA-861 filings list 30,081 customers across 1 county including Sullivan, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Bristol - (TN).

## Related Pages

Explore Tennessee energy benchmarks, Caney Fork Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside City of Bristol - (TN).

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.54 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)