title: "Chickasaw Electric Coop, Inc (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-chickasaw-electric-coop-inc-40166/
description: "2025 EIA-861 profile for Chickasaw Electric Coop, Inc (TN): 11.8 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Chickasaw Electric Coop, Inc (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Chickasaw Electric Coop, Inc (EIA ID 40166, TN) serves 19,723 customers at 11.8 c/kWh (-1.42 c/kWh vs Tennessee average) with no standalone IEEE SAIDI filing (3 counties served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 40166

- **Res. Rate** : 11.8 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Chickasaw Electric Coop, Inc Compare on Tariffs and Reliability?

EIA-861 rate delta (-1.42 c/kWh vs Tennessee average), customer scale (19,723), and 2026 solar payback benchmarks for Chickasaw Electric Coop, Inc.

Serving 19,723 customers across 3 counties including Fayette, Hardeman, Haywood in Tennessee, Chickasaw Electric Coop, Inc (Cooperative, Balancing Authority TVA) offers a low 11.8 c/kWh residential rate (-6.74 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 18.5 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr), with zero residential net-metered PV reported in 2025 filings.

## Where Does Chickasaw Electric Coop, Inc Sit Across US Utility Rates?

Positions Chickasaw Electric Coop, Inc (11.8 c/kWh) across 1,989 US electric utility residential tariffs. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## How Does Chickasaw Electric Coop, Inc Rank Across Cost & Reliability?

Percentile placement of Chickasaw Electric Coop, Inc across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Chickasaw Electric Coop, Inc?

Four key EIA-861 rate, outage, and solar payback benchmarks for Chickasaw Electric Coop, Inc (Cooperative) in Tennessee. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Lowest Rate #361 / 1,989

### 11.8 c/kWh (-1.42 vs TN)

Commercial avg: 12.37 c/kWh; Industrial: 5.85 c/kWh; est. residential bill $168.68/mo.

State Reliability Context

### 227.7 min/yr (TN Avg)

Utility did not file separate IEEE SAIDI in 2025; Tennessee customer-weighted SAIDI is 227.7 min/yr.

Post-25D Payback

### 18.5 Years @ 11.8 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,274/yr at 1,350 kWh/kW.

Service Territory

### 19,723 Customers · 3 Counties

Serves 3 counties including Fayette, Hardeman, Haywood in Tennessee; state FEMA declarations (2015-2026): 35.

Chickasaw Electric Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1180 = $1,274/yr

EIA-861 2025 Utility ID 40166: Rate=11.8 c/kWh, Cust=19,723.

**Result:** 18.5 yr 8 kW cash payback at 11.8 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Chickasaw Electric Coop, Inc?

Complete Form EIA-861 filing summary for Chickasaw Electric Coop, Inc (ID 40166) covering sales, PV, and counties. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Form EIA-861 2025 filing metrics for Chickasaw Electric Coop, Inc (Utility ID 40166).

| EIA Utility ID & BA Code | ID 40166 · TVA |
|---|---|
| State & Ownership Type | TN · Cooperative |
| Retail Electricity Rates | 11.8 c/kWh Res · 12.37 c Comm · 5.85 c Ind |
| Avg Monthly Usage & Bill | 1,429.3 kWh/mo ($168.68/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 3 counties (Fayette, Hardeman, Haywood) |

## Which Peer Electric Utilities Operate in TN?

Compare Chickasaw Electric Coop, Inc directly with Maryville Utilities and nearby Tennessee electric utilities by customer base. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Maryville Utilities**](https://epri-peac.com/utilities/tn-maryville-utilities-11789/) | 12.11 c | 77.7 min | 0 | 19,485 |
| [**City of Newport - (TN)**](https://epri-peac.com/utilities/tn-city-of-newport-tn-13550/) | 15.05 c | — | 0 | 20,003 |
| [**City of LaFollette**](https://epri-peac.com/utilities/tn-city-of-lafollette-10579/) | 14.33 c | 791.0 min | 0 | 20,083 |
| [**City of Lawrenceburg**](https://epri-peac.com/utilities/tn-city-of-lawrenceburg-10799/) | 13.0 c | — | 0 | 18,239 |

What to Check & Best-Fit Scenarios

## What Should Chickasaw Electric Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Chickasaw Electric Coop, Inc (Cooperative, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Chickasaw Electric Coop, Inc's 11.8 c/kWh blended residential rate in TN does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Chickasaw Electric Coop, Inc system-wide SAIDI averages rural and urban circuits across its TN territory or nearby Maryville Utilities.

### Chickasaw Electric Coop, Inc Solar & Battery Evaluators

Compare your actual Chickasaw Electric Coop, Inc monthly kWh statement against 11.8 c/kWh and verify current export tariffs in TN.

### Chickasaw Electric Coop, Inc Outage & Generator Planners

Use Chickasaw Electric Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Chickasaw Electric Coop, Inc (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Chickasaw Electric Coop, Inc's residential electricity rate and 2026 solar payback?

Chickasaw Electric Coop, Inc averages 11.8 c/kWh (-1.42 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,274/yr (18.5-year payback).

### How reliable is Chickasaw Electric Coop, Inc compared to peer Tennessee utilities?

Chickasaw Electric Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 227.7 min/yr); compare rates and outage history directly with Maryville Utilities (12.11 c/kWh) across Tennessee.

### Which counties and customers does Chickasaw Electric Coop, Inc serve in Tennessee?

EIA-861 filings list 19,723 customers across 3 counties including Fayette, Hardeman, Haywood, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Chickasaw Electric Coop, Inc.

## Related Pages

Explore Tennessee energy benchmarks, Maryville Utilities, county outage profiles, and NEC 705.12 tools alongside Chickasaw Electric Coop, Inc.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.8 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)