title: "Bolivar Energy Authority (TN) Rate & SAIDI"
url: https://epri-peac.com/utilities/tn-bolivar-energy-authority-1936/
description: "2025 EIA-861 profile for Bolivar Energy Authority (TN): 14.17 c/kWh rate, SAIDI 564.1 min/yr, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# Bolivar Energy Authority (TN) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Bolivar Energy Authority (EIA ID 1936, TN) serves 8,913 customers at 14.17 c/kWh (+0.95 c/kWh vs Tennessee average) with 564.1 min/yr SAIDI (9.4 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 1936

- **Res. Rate** : 14.17 c/kWh

- **SAIDI (All Events)** : 564.1 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Bolivar Energy Authority Compare on Tariffs and Reliability?

How Bolivar Energy Authority (Municipal) performs across 2 counties on kWh rates and outage resilience. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

Bolivar Energy Authority (Municipal) logged 564.1 SAIDI outage minutes (9.4 hrs/yr, 66.7% storm-driven), making battery backup or a standby ATS worthwhile. Typical residential meters drew 1,189.4 kWh/mo ($168.57/mo) in 2025, while its tariff bills residential power at 14.17 c/kWh (+0.95 c/kWh vs Tennessee average vs. Tennessee), offsetting ~$1,530/yr on an 8 kW array—compare rates directly with Benton County (15.11 c/kWh).

## Where Does Bolivar Energy Authority Sit Across US Utility Rates?

National utility tariff curve marking Bolivar Energy Authority at 14.17 c/kWh vs. 18.54 c/kWh US mean.

## How Does Bolivar Energy Authority Rank Across Cost & Reliability?

Relative ranking of Bolivar Energy Authority on residential electricity pricing and annual IEEE SAIDI outage duration. Review related calculators, peer benchmarks, and source citations below to validate design assumptions for your electrical service.

## What Do EIA-861 Benchmarks Show for Bolivar Energy Authority?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Bolivar Energy Authority in Tennessee. Data intervals combine current 2025 federal utility and BLS wage releases with verified state electrical board rosters.

Lowest Rate #1,018 / 1,989

### 14.17 c/kWh (+0.95 vs TN)

Commercial avg: 15.55 c/kWh; Industrial: 8.06 c/kWh; est. residential bill $168.57/mo.

Reliability #654 / 751

### 564.1 min/yr (9.4 hrs)

66.7% (376.3 min) from Major Event Days; avg restore 236.2 min (~7.1 kWh @ 1.8 kW).

Post-25D Payback

### 15.4 Years @ 14.17 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,530/yr at 1,350 kWh/kW.

Service Territory

### 8,913 Customers · 2 Counties

Serves 2 counties including Fayette, Hardeman in Tennessee; state FEMA declarations (2015-2026): 35.

Bolivar Energy Authority Reliability & Solar Offset Calculation

Backup_Energy = (236.2 min / 60) * 1.8 kW = 7.1 kWh/event | Solar_Offset = 10,800 kWh * $0.1417 = $1,530/yr

EIA-861 2025 Utility ID 1936: Rate=14.17 c/kWh, Cust=8,913, SAIDI=564.1 min.

**Result:** 9.4 outage hrs/yr; 15.4 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Bolivar Energy Authority?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Bolivar Energy Authority. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for Bolivar Energy Authority (Utility ID 1936).

| EIA Utility ID & BA Code | ID 1936 · TVA |
|---|---|
| State & Ownership Type | TN · Municipal |
| Retail Electricity Rates | 14.17 c/kWh Res · 15.55 c Comm · 8.06 c Ind |
| Avg Monthly Usage & Bill | 1,189.4 kWh/mo ($168.57/mo est.) |
| SAIDI (All Events w/ MED) | 564.1 min/yr (9.4 hrs/yr) |
| SAIDI (Without Major Events) | 187.8 min/yr (Storm share: 66.7%) |
| SAIFI & CAIDI (Per-Outage Avg) | 2.388 /yr · 236.2 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 2 counties (Fayette, Hardeman) |

## Which Peer Electric Utilities Operate in TN?

Nearby Tennessee electric utilities of comparable customer size led by Benton County (15.11 c/kWh). Always verify current state NEC adoption cycles, local utility interconnection tariffs, and panel busbar ratings before pulling project permits.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Benton County**](https://epri-peac.com/utilities/tn-benton-county-1578/) | 15.11 c | — | 0 | 8,750 |
| [**City of Dayton - (TN)**](https://epri-peac.com/utilities/tn-city-of-dayton-tn-4920/) | 12.55 c | — | 0 | 9,149 |
| [**Tullahoma Board-Public Utils**](https://epri-peac.com/utilities/tn-tullahoma-board-public-utils-19266/) | 11.72 c | 73.9 min | 0 | 9,324 |
| [**City of Harriman - (TN)**](https://epri-peac.com/utilities/tn-city-of-harriman-tn-8147/) | 14.04 c | — | 0 | 9,375 |

What to Check & Best-Fit Scenarios

## What Should Bolivar Energy Authority Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Bolivar Energy Authority (Municipal, TN) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Bolivar Energy Authority acts as a wires-only TDU or bundled utility in TN.
- Transformer limits: Bolivar Energy Authority interconnection engineering still checks neighborhood transformer kVA regardless of 564.1 SAIDI.

### Bolivar Energy Authority Solar & Battery Evaluators

Compare your actual Bolivar Energy Authority monthly kWh statement against 14.17 c/kWh and verify current export tariffs in TN.

### Bolivar Energy Authority Outage & Generator Planners

Use Bolivar Energy Authority's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Bolivar Energy Authority (Tennessee) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

### What is Bolivar Energy Authority's residential electricity rate and 2026 solar payback?

Bolivar Energy Authority averages 14.17 c/kWh (+0.95 c/kWh vs Tennessee average vs. Tennessee). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,530/yr (15.4-year payback).

### How reliable is Bolivar Energy Authority compared to peer Tennessee utilities?

Bolivar Energy Authority logged 564.1 SAIDI outage minutes (9.4 hrs/yr, 66.7% storm-driven), making battery backup or a standby ATS worthwhile; compare rates and outage history directly with Benton County (15.11 c/kWh) across Tennessee.

### Which counties and customers does Bolivar Energy Authority serve in Tennessee?

EIA-861 filings list 8,913 customers across 2 counties including Fayette, Hardeman, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Bolivar Energy Authority.

## Related Pages

Explore Tennessee energy benchmarks, Benton County, county outage profiles, and NEC 705.12 tools alongside Bolivar Energy Authority. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

[Tennessee State Energy Rates & Utilities](https://epri-peac.com/states/tennessee/) [All Tennessee County Power & Outage Profiles](https://epri-peac.com/counties/tennessee/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 14.17 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)