Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Otter Tail Power Co (EIA ID 14232, SD) serves 9,094 customers at 11.42 c/kWh (-1.90 c/kWh vs South Dakota average) with 191.0 min/yr SAIDI (3.18 hrs/yr) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14232

- **Res. Rate** : 11.42 c/kWh

- **SAIDI (All Events)** : 191.0 min/yr

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Otter Tail Power Co Compare on Tariffs and Reliability?

How Otter Tail Power Co (Investor Owned) performs across 11 counties on kWh rates and outage resilience. Published percentiles compare local state, county, metro, and certified equipment metrics against nationwide residential electrical baselines.

Otter Tail Power Co (Investor Owned) recorded 191.0 SAIDI outage minutes (3.18 hrs/yr, rank #398 of 751 reporting utilities). Typical residential meters drew 1,079.9 kWh/mo ($123.34/mo) in 2025, while its tariff offers a low 11.42 c/kWh residential rate (-7.12 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 19.1 years without federal 25D—compare rates directly with Black Hills Electric Coop, Inc (14.79 c/kWh).

## Where Does Otter Tail Power Co Sit Across US Utility Rates?

National utility tariff curve marking Otter Tail Power Co at 11.42 c/kWh vs. 18.54 c/kWh US mean.

## How Does Otter Tail Power Co Rank Across Cost & Reliability?

Relative ranking of Otter Tail Power Co on residential electricity pricing and annual IEEE SAIDI outage duration. Inspect manufacturer nameplate documentation, UL listing boundaries, and utility rate schedules closely before ordering electrical hardware.

## What Do EIA-861 Benchmarks Show for Otter Tail Power Co?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Otter Tail Power Co in South Dakota.

Lowest Rate #295 / 1,989

### 11.42 c/kWh (-1.90 vs SD)

Commercial avg: 7.85 c/kWh; est. residential bill $123.34/mo.

Reliability #398 / 751

### 191.0 min/yr (3.18 hrs)

1.1% (2.1 min) from Major Event Days; avg restore 110.4 min (~3.3 kWh @ 1.8 kW).

Post-25D Payback

### 19.1 Years @ 11.42 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,233/yr at 1,350 kWh/kW.

Service Territory

### 9,094 Customers · 11 Counties

Serves 11 counties including Brookings, Codington, Day in South Dakota; state FEMA declarations (2015-2026): 30.

Otter Tail Power Co Reliability & Solar Offset Calculation

Backup_Energy = (110.4 min / 60) * 1.8 kW = 3.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1142 = $1,233/yr

EIA-861 2025 Utility ID 14232: Rate=11.42 c/kWh, Cust=9,094, SAIDI=191.0 min.

**Result:** 3.18 outage hrs/yr; 19.1 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for Otter Tail Power Co?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Otter Tail Power Co. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

Form EIA-861 2025 filing metrics for Otter Tail Power Co (Utility ID 14232).

| EIA Utility ID & BA Code | ID 14232 · MISO |
|---|---|
| State & Ownership Type | SD · Investor Owned |
| Retail Electricity Rates | 11.42 c/kWh Res · 7.85 c Comm |
| Avg Monthly Usage & Bill | 1,079.9 kWh/mo ($123.34/mo est.) |
| SAIDI (All Events w/ MED) | 191.0 min/yr (3.18 hrs/yr) |
| SAIDI (Without Major Events) | 188.9 min/yr (Storm share: 1.1%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.731 /yr · 110.4 min restore |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 11 counties (Brookings, Codington, Day, Deuel, Grant, Hamlin, Kingsbury, Lake, Marshall, Moody) |

## Which Peer Electric Utilities Operate in SD?

Nearby South Dakota electric utilities of comparable customer size led by Black Hills Electric Coop, Inc (14.79 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Black Hills Electric Coop, Inc**](https://epri-peac.com/utilities/sd-black-hills-electric-coop-inc-1769/) | 14.79 c | 2,486.8 min | 86 | 9,415 |
| [**City of Brookings - (SD)**](https://epri-peac.com/utilities/sd-city-of-brookings-sd-2285/) | 10.69 c | 13.2 min | 0 | 10,769 |
| [**Central Electric Coop, Inc - (SD)**](https://epri-peac.com/utilities/sd-central-electric-coop-inc-sd-3236/) | 14.67 c | — | 0 | 6,515 |
| [**Watertown Municipal Utilities**](https://epri-peac.com/utilities/sd-watertown-municipal-utilities-20187/) | 9.29 c | 4.2 min | 0 | 11,775 |

What to Check & Best-Fit Scenarios

## What Should Otter Tail Power Co Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Otter Tail Power Co (Investor Owned, SD) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether Otter Tail Power Co acts as a wires-only TDU or bundled utility in SD.
- Transformer limits: Otter Tail Power Co interconnection engineering still checks neighborhood transformer kVA regardless of 191.0 SAIDI.

### Otter Tail Power Co Solar & Battery Evaluators

Compare your actual Otter Tail Power Co monthly kWh statement against 11.42 c/kWh and verify current export tariffs in SD.

### Otter Tail Power Co Outage & Generator Planners

Use Otter Tail Power Co's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Otter Tail Power Co (South Dakota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Otter Tail Power Co's residential electricity rate and 2026 solar payback?

Otter Tail Power Co averages 11.42 c/kWh (-1.90 c/kWh vs South Dakota average vs. South Dakota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,233/yr (19.1-year payback).

### How reliable is Otter Tail Power Co compared to peer South Dakota utilities?

Otter Tail Power Co recorded 191.0 SAIDI outage minutes (3.18 hrs/yr, rank #398 of 751 reporting utilities); compare rates and outage history directly with Black Hills Electric Coop, Inc (14.79 c/kWh) across South Dakota.

### Which counties and customers does Otter Tail Power Co serve in South Dakota?

EIA-861 filings list 9,094 customers across 11 counties including Brookings, Codington, Day, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Otter Tail Power Co.

## Related Pages

Explore South Dakota energy benchmarks, Black Hills Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside Otter Tail Power Co.

[South Dakota State Energy Rates & Utilities](https://epri-peac.com/states/south-dakota/) [All South Dakota County Power & Outage Profiles](https://epri-peac.com/counties/south-dakota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 11.42 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)