title: "City of Volga - (SD) (SD) Rate & SAIDI"
url: https://epri-peac.com/utilities/sd-city-of-volga-sd-19896/
description: "2025 EIA-861 profile for City of Volga - (SD) (SD): 12.79 c/kWh rate, SAIDI Not reported in EIA-861, 2025 rate & service profile."
---

EIA-861 Grid Reliability & Net Metering

# City of Volga - (SD) (SD) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

City of Volga - (SD) (EIA ID 19896, SD) serves 1,094 customers at 12.79 c/kWh (-0.53 c/kWh vs South Dakota average) with no standalone IEEE SAIDI filing (1 county served) with zero residential net-metered PV reported in 2025 filings. All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 19896

- **Res. Rate** : 12.79 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : Unreported

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does City of Volga - (SD) Compare on Tariffs and Reliability?

How City of Volga - (SD) (Municipal) performs across 1 county on kWh rates and outage resilience. Every reported metric links directly to federal public records or state regulatory filings with zero paid contractor placements.

City of Volga - (SD) (Municipal) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 284.3 min/yr). Typical residential meters drew 929.5 kWh/mo ($118.87/mo) in 2025, while its tariff offers a low 12.79 c/kWh residential rate (-5.75 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.1 years without federal 25D—compare rates directly with Nebraska Public Power District (10.08 c/kWh).

## Where Does City of Volga - (SD) Sit Across US Utility Rates?

National utility tariff curve marking City of Volga - (SD) at 12.79 c/kWh vs. 18.54 c/kWh US mean.

## How Does City of Volga - (SD) Rank Across Cost & Reliability?

Relative ranking of City of Volga - (SD) on residential electricity pricing and annual IEEE SAIDI outage duration. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## What Do EIA-861 Benchmarks Show for City of Volga - (SD)?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for City of Volga - (SD) in South Dakota.

Lowest Rate #586 / 1,989

### 12.79 c/kWh (-0.53 vs SD)

Commercial avg: 12.65 c/kWh; Industrial: 8.01 c/kWh; est. residential bill $118.87/mo.

State Reliability Context

### 284.3 min/yr (SD Avg)

Utility did not file separate IEEE SAIDI in 2025; South Dakota customer-weighted SAIDI is 284.3 min/yr.

Post-25D Payback

### 17.1 Years @ 12.79 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,381/yr at 1,350 kWh/kW.

Service Territory

### 1,094 Customers · 1 County

Serves 1 county including Brookings in South Dakota; state FEMA declarations (2015-2026): 30.

City of Volga - (SD) Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1279 = $1,381/yr

EIA-861 2025 Utility ID 19896: Rate=12.79 c/kWh, Cust=1,094.

**Result:** 17.1 yr 8 kW cash payback at 12.79 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for City of Volga - (SD)?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by City of Volga - (SD). Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Form EIA-861 2025 filing metrics for City of Volga - (SD) (Utility ID 19896).

| EIA Utility ID & BA Code | ID 19896 · SWPP |
|---|---|
| State & Ownership Type | SD · Municipal |
| Retail Electricity Rates | 12.79 c/kWh Res · 12.65 c Comm · 8.01 c Ind |
| Avg Monthly Usage & Bill | 929.5 kWh/mo ($118.87/mo est.) |
| Residential Net-Metered PV | Not reported in 2025 EIA-861 |
| Counties Served (Sample) | 1 county (Brookings) |

## Which Peer Electric Utilities Operate in SD?

Nearby South Dakota electric utilities of comparable customer size led by Nebraska Public Power District (10.08 c/kWh).

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Nebraska Public Power District**](https://epri-peac.com/utilities/sd-nebraska-public-power-district-13337/) | 10.08 c | — | 0 | 1,047 |
| [**Oahe Electric Coop Inc**](https://epri-peac.com/utilities/sd-oahe-electric-coop-inc-13853/) | 10.54 c | — | 6 | 2,335 |
| [**City of Madison - (SD)**](https://epri-peac.com/utilities/sd-city-of-madison-sd-11475/) | 12.41 c | — | 0 | 2,818 |
| [**Dakota Energy Coop Inc**](https://epri-peac.com/utilities/sd-dakota-energy-coop-inc-4720/) | 16.28 c | — | 0 | 3,231 |

What to Check & Best-Fit Scenarios

## What Should City of Volga - (SD) Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for City of Volga - (SD) (Municipal, SD) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- ERCOT / retail choice note or local riders: confirm whether City of Volga - (SD) acts as a wires-only TDU or bundled utility in SD.
- Transformer limits: City of Volga - (SD) interconnection engineering still checks neighborhood transformer kVA regardless of reported SAIDI.

### City of Volga - (SD) Solar & Battery Evaluators

Compare your actual City of Volga - (SD) monthly kWh statement against 12.79 c/kWh and verify current export tariffs in SD.

### City of Volga - (SD) Outage & Generator Planners

Use City of Volga - (SD)'s SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for City of Volga - (SD) (South Dakota) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is City of Volga - (SD)'s residential electricity rate and 2026 solar payback?

City of Volga - (SD) averages 12.79 c/kWh (-0.53 c/kWh vs South Dakota average vs. South Dakota). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,381/yr (17.1-year payback).

### How reliable is City of Volga - (SD) compared to peer South Dakota utilities?

City of Volga - (SD) did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 284.3 min/yr); compare rates and outage history directly with Nebraska Public Power District (10.08 c/kWh) across South Dakota.

### Which counties and customers does City of Volga - (SD) serve in South Dakota?

EIA-861 filings list 1,094 customers across 1 county including Brookings, with 0 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting City of Volga - (SD).

## Related Pages

Explore South Dakota energy benchmarks, Nebraska Public Power District, county outage profiles, and NEC 705.12 tools alongside City of Volga - (SD).

[South Dakota State Energy Rates & Utilities](https://epri-peac.com/states/south-dakota/) [All South Dakota County Power & Outage Profiles](https://epri-peac.com/counties/south-dakota/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.79 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)