Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

MPD Electric Cooperative (EIA ID 66073, SC) serves 32,130 customers at 13.73 c/kWh (-1.39 c/kWh vs South Carolina average) with 135.9 min/yr SAIDI (2.27 hrs/yr) with 214 net-metered residential solar systems (0.67% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 66073

- **Res. Rate** : 13.73 c/kWh

- **SAIDI (All Events)** : 135.9 min/yr

- **Net-Metered PV** : 214 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does MPD Electric Cooperative Compare on Tariffs and Reliability?

Solar payback, residential tariff (13.73 c/kWh), and outage history inside MPD Electric Cooperative territory. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

Evaluating solar or generator backup under MPD Electric Cooperative (South Carolina) starts with its 13.73 c/kWh residential baseline (-1.39 c/kWh vs South Carolina average) and 15.9-year 8 kW cash payback. EIA-861 records show MPD Electric Cooperative recorded 135.9 SAIDI outage minutes (2.27 hrs/yr, rank #309 of 751 reporting utilities) across 32,130 accounts.

## Where Does MPD Electric Cooperative Sit Across US Utility Rates?

Benchmarking MPD Electric Cooperative's 13.73 c/kWh residential rate against 1,989 EIA-861 utilities. All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

## How Does MPD Electric Cooperative Rank Across Cost & Reliability?

Residential electricity cost and IEEE outage reliability percentiles for MPD Electric Cooperative across South Carolina utilities. Cross-check local Authority Having Jurisdiction amendments and serving utility net-metering terms before finalizing project sizing.

## What Do EIA-861 Benchmarks Show for MPD Electric Cooperative?

Key retail tariff, annual SAIDI outage, and distributed solar numbers reported by MPD Electric Cooperative in 2025. Homeowners and permit reviewers can filter tables below to benchmark specific ratings, wiring ages, and code allowances side by side.

Lowest Rate #881 / 1,989

### 13.73 c/kWh (-1.39 vs SC)

Commercial avg: 14.7 c/kWh; Industrial: 9.97 c/kWh; est. residential bill $180.11/mo.

Reliability #309 / 751

### 135.9 min/yr (2.27 hrs)

24.0% (32.6 min) from Major Event Days; avg restore 109.5 min (~3.3 kWh @ 1.8 kW).

Post-25D Payback

### 15.9 Years @ 13.73 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,483/yr at 1,350 kWh/kW.

Distributed PV

### 214 Net-Metered Systems

1.803 MW residential PV (0.67% of customers) across 7 counties; state FEMA declarations (2015-2026): 28.

MPD Electric Cooperative Reliability & Solar Offset Calculation

Backup_Energy = (109.5 min / 60) * 1.8 kW = 3.3 kWh/event | Solar_Offset = 10,800 kWh * $0.1373 = $1,483/yr

EIA-861 2025 Utility ID 66073: Rate=13.73 c/kWh, Cust=32,130, SAIDI=135.9 min, PV=214.

**Result:** 2.27 outage hrs/yr; 15.9 yr 8 kW cash payback (0% 25D).

## What Are the EIA-861 Filing Metrics for MPD Electric Cooperative?

2025 Form EIA-861 reliability, retail rate, and county territory data for Utility ID 66073. Regional housing vintage, storm hazard frequency, and wholesale utility prices directly govern residential upgrade payback across jurisdictions.

Form EIA-861 2025 filing metrics for MPD Electric Cooperative (Utility ID 66073).

| EIA Utility ID & BA Code | ID 66073 · SC |
|---|---|
| State & Ownership Type | SC · Cooperative |
| Retail Electricity Rates | 13.73 c/kWh Res · 14.7 c Comm · 9.97 c Ind |
| Avg Monthly Usage & Bill | 1,312.1 kWh/mo ($180.11/mo est.) |
| SAIDI (All Events w/ MED) | 135.9 min/yr (2.27 hrs/yr) |
| SAIDI (Without Major Events) | 103.3 min/yr (Storm share: 24.0%) |
| SAIFI & CAIDI (Per-Outage Avg) | 1.241 /yr · 109.5 min restore |
| Residential Net-Metered PV | 214 systems (1.803 MW) |
| Counties Served (Sample) | 7 counties (Chesterfield, Darlington, Dillon, Florence, Lee, Marion, Marlboro) |

## Which Peer Electric Utilities Operate in SC?

Benchmark MPD Electric Cooperative directly against Fairfield Electric Coop, Inc and peer South Carolina retail electric power providers.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Fairfield Electric Coop, Inc**](https://epri-peac.com/utilities/sc-fairfield-electric-coop-inc-5929/) | 15.6 c | — | 0 | 33,071 |
| [**Black River Electric Coop, Inc - (SC)**](https://epri-peac.com/utilities/sc-black-river-electric-coop-inc-sc-1763/) | 15.14 c | 96.0 min | 461 | 30,874 |
| [**Santee Electric Coop, Inc**](https://epri-peac.com/utilities/sc-santee-electric-coop-inc-16606/) | 16.39 c | 211.4 min | 276 | 35,356 |
| [**City of Rock Hill - (SC)**](https://epri-peac.com/utilities/sc-city-of-rock-hill-sc-16195/) | 12.34 c | 69.1 min | 229 | 36,786 |

What to Check & Best-Fit Scenarios

## What Should MPD Electric Cooperative Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for MPD Electric Cooperative (Cooperative, SC) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Annual snapshot caveat: MPD Electric Cooperative (Cooperative) reports historical 2025 EIA-861 averages rather than live rate-case riders in SC.
- Export credit rules: check MPD Electric Cooperative's active net-billing or avoided-cost schedule before assuming 1-to-1 retail solar offset.

### MPD Electric Cooperative Solar & Battery Evaluators

Compare your actual MPD Electric Cooperative monthly kWh statement against 13.73 c/kWh and verify current export tariffs in SC.

### MPD Electric Cooperative Outage & Generator Planners

Use MPD Electric Cooperative's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for MPD Electric Cooperative (South Carolina) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is MPD Electric Cooperative's residential electricity rate and 2026 solar payback?

MPD Electric Cooperative averages 13.73 c/kWh (-1.39 c/kWh vs South Carolina average vs. South Carolina). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,483/yr (15.9-year payback).

### How reliable is MPD Electric Cooperative compared to peer South Carolina utilities?

MPD Electric Cooperative recorded 135.9 SAIDI outage minutes (2.27 hrs/yr, rank #309 of 751 reporting utilities); compare rates and outage history directly with Fairfield Electric Coop, Inc (15.6 c/kWh) across South Carolina.

### Which counties and customers does MPD Electric Cooperative serve in South Carolina?

EIA-861 filings list 32,130 customers across 7 counties including Chesterfield, Darlington, Dillon, with 214 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting MPD Electric Cooperative.

## Related Pages

Explore South Carolina energy benchmarks, Fairfield Electric Coop, Inc, county outage profiles, and NEC 705.12 tools alongside MPD Electric Cooperative.

[South Carolina State Energy Rates & Utilities](https://epri-peac.com/states/south-carolina/) [All South Carolina County Power & Outage Profiles](https://epri-peac.com/counties/south-carolina/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 13.73 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)