# Tillamook Peoples Utility Dist (OR) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Tillamook Peoples Utility Dist (EIA ID 18917, OR) serves 20,263 customers at 12.66 c/kWh (-2.80 c/kWh vs Oregon average) with no standalone IEEE SAIDI filing (3 counties served) with 91 net-metered residential solar systems (0.45% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 18917

- **Res. Rate** : 12.66 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 91 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Tillamook Peoples Utility Dist Compare on Tariffs and Reliability?

EIA-861 rate delta (-2.80 c/kWh vs Oregon average), customer scale (20,263), and 2026 solar payback benchmarks for Tillamook Peoples Utility Dist.

Serving 20,263 customers across 3 counties including Clatsop, Tillamook, Yamhill in Oregon, Tillamook Peoples Utility Dist (Political Subdivision, Balancing Authority BPAT) offers a low 12.66 c/kWh residential rate (-5.88 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 17.3 years without federal 25D. Grid filings show the utility did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr), with 91 net-metered residential solar systems (0.45% customer adoption).

## Where Does Tillamook Peoples Utility Dist Sit Across US Utility Rates?

Positions Tillamook Peoples Utility Dist (12.66 c/kWh) across 1,989 US electric utility residential tariffs. Use these verified dataset benchmarks alongside a licensed electrician load calculation to compare residential upgrade bids with confidence.

## How Does Tillamook Peoples Utility Dist Rank Across Cost & Reliability?

Percentile placement of Tillamook Peoples Utility Dist across retail kWh electricity cost and IEEE grid reliability outage metrics.

## What Do EIA-861 Benchmarks Show for Tillamook Peoples Utility Dist?

Four key EIA-861 rate, outage, and solar payback benchmarks for Tillamook Peoples Utility Dist (Political Subdivision) in Oregon.

Lowest Rate #551 / 1,989

### 12.66 c/kWh (-2.80 vs OR)

Commercial avg: 8.91 c/kWh; Industrial: 6.1 c/kWh; est. residential bill $127.60/mo.

State Reliability Context

### 302.4 min/yr (OR Avg)

Utility did not file separate IEEE SAIDI in 2025; Oregon customer-weighted SAIDI is 302.4 min/yr.

Post-25D Payback

### 17.3 Years @ 12.66 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,367/yr at 1,350 kWh/kW.

Distributed PV

### 91 Net-Metered Systems

0.643 MW residential PV (0.45% of customers) across 3 counties; state FEMA declarations (2015-2026): 84.

Tillamook Peoples Utility Dist Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1266 = $1,367/yr

EIA-861 2025 Utility ID 18917: Rate=12.66 c/kWh, Cust=20,263, PV=91.

**Result:** 17.3 yr 8 kW cash payback at 12.66 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Tillamook Peoples Utility Dist?

Complete Form EIA-861 filing summary for Tillamook Peoples Utility Dist (ID 18917) covering sales, PV, and counties. Compare thermal ratings, overcurrent protection caps, and continuous load headroom carefully before expanding an existing home service panel.

Form EIA-861 2025 filing metrics for Tillamook Peoples Utility Dist (Utility ID 18917).

| EIA Utility ID & BA Code | ID 18917 · BPAT |
|---|---|
| State & Ownership Type | OR · Political Subdivision |
| Retail Electricity Rates | 12.66 c/kWh Res · 8.91 c Comm · 6.1 c Ind |
| Avg Monthly Usage & Bill | 1,007.5 kWh/mo ($127.60/mo est.) |
| Residential Net-Metered PV | 91 systems (0.643 MW) |
| Counties Served (Sample) | 3 counties (Clatsop, Tillamook, Yamhill) |

## Which Peer Electric Utilities Operate in OR?

Compare Tillamook Peoples Utility Dist directly with Emerald People's Utility Dist and nearby Oregon electric utilities by customer base.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**Emerald People's Utility Dist**](https://epri-peac.com/utilities/or-emerald-people-s-utility-dist-40437/) | 11.54 c | — | 262 | 19,946 |
| [**Consumers Power, Inc**](https://epri-peac.com/utilities/or-consumers-power-inc-4743/) | 13.9 c | 738.9 min | 678 | 18,921 |
| [**Midstate Electric Coop, Inc**](https://epri-peac.com/utilities/or-midstate-electric-coop-inc-12439/) | 11.85 c | — | 97 | 18,875 |
| [**Salem Electric - (OR)**](https://epri-peac.com/utilities/or-salem-electric-or-16555/) | 10.91 c | — | 151 | 18,499 |

What to Check & Best-Fit Scenarios

## What Should Tillamook Peoples Utility Dist Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Tillamook Peoples Utility Dist (Political Subdivision, OR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Tillamook Peoples Utility Dist's 12.66 c/kWh blended residential rate in OR does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Tillamook Peoples Utility Dist system-wide SAIDI averages rural and urban circuits across its OR territory or nearby Emerald People's Utility Dist.

### Tillamook Peoples Utility Dist Solar & Battery Evaluators

Compare your actual Tillamook Peoples Utility Dist monthly kWh statement against 12.66 c/kWh and verify current export tariffs in OR.

### Tillamook Peoples Utility Dist Outage & Generator Planners

Use Tillamook Peoples Utility Dist's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Tillamook Peoples Utility Dist (Oregon) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Tillamook Peoples Utility Dist's residential electricity rate and 2026 solar payback?

Tillamook Peoples Utility Dist averages 12.66 c/kWh (-2.80 c/kWh vs Oregon average vs. Oregon). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,367/yr (17.3-year payback).

### How reliable is Tillamook Peoples Utility Dist compared to peer Oregon utilities?

Tillamook Peoples Utility Dist did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr); compare rates and outage history directly with Emerald People's Utility Dist (11.54 c/kWh) across Oregon.

### Which counties and customers does Tillamook Peoples Utility Dist serve in Oregon?

EIA-861 filings list 20,263 customers across 3 counties including Clatsop, Tillamook, Yamhill, with 91 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Tillamook Peoples Utility Dist.

## Related Pages

Explore Oregon energy benchmarks, Emerald People's Utility Dist, county outage profiles, and NEC 705.12 tools alongside Tillamook Peoples Utility Dist.

[Oregon State Energy Rates & Utilities](https://epri-peac.com/states/oregon/) [All Oregon County Power & Outage Profiles](https://epri-peac.com/counties/oregon/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 12.66 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)