title: "Oregon Trail El Cons Coop, Inc (OR) Rate & SAIDI"
url: https://epri-peac.com/utilities/or-oregon-trail-el-cons-coop-inc-14109/
description: "2025 EIA-861 profile for Oregon Trail El Cons Coop, Inc (OR): 10.97 c/kWh rate, SAIDI Not reported in EIA-861, 130 solar systems."
---

EIA-861 Grid Reliability & Net Metering

# Oregon Trail El Cons Coop, Inc (OR) — Grid Reliability & Solar Data

Filing: **Form EIA-861 (2025 Release)** Verified: **2026-11-26**

Oregon Trail El Cons Coop, Inc (EIA ID 14109, OR) serves 25,995 customers at 10.97 c/kWh (-4.49 c/kWh vs Oregon average) with no standalone IEEE SAIDI filing (4 counties served) with 130 net-metered residential solar systems (0.5% customer adoption). All figures reconcile directly against federal energy archives, state electrical licensing boards, California Energy Commission datasheets, and National Electrical Code engineering constants.

- **EIA Utility ID** : 14109

- **Res. Rate** : 10.97 c/kWh

- **SAIDI (All Events)** : Not reported in EIA-861

- **Net-Metered PV** : 130 systems

Electric utility distribution substation transformers, ceramic insulators, and overhead feeder lines at dusk

## How Does Oregon Trail El Cons Coop, Inc Compare on Tariffs and Reliability?

How Oregon Trail El Cons Coop, Inc (Cooperative) performs across 4 counties on kWh rates and outage resilience.

Across 4 counties including Baker, Grant, Harney, Oregon Trail El Cons Coop, Inc offers a low 10.97 c/kWh residential rate (-7.57 c/kWh vs US weighted mean), extending 8 kW cash solar payback to 19.9 years without federal 25D compared to peer City of Springfield - (OR) (8.39 c/kWh). With 25,995 customer accounts (Cooperative), 2025 Form EIA-861 shows Oregon Trail El Cons Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr), with 130 net-metered residential solar systems (0.5% customer adoption).

## Where Does Oregon Trail El Cons Coop, Inc Sit Across US Utility Rates?

National utility tariff curve marking Oregon Trail El Cons Coop, Inc at 10.97 c/kWh vs. 18.54 c/kWh US mean.

## How Does Oregon Trail El Cons Coop, Inc Rank Across Cost & Reliability?

Relative ranking of Oregon Trail El Cons Coop, Inc on residential electricity pricing and annual IEEE SAIDI outage duration.

## What Do EIA-861 Benchmarks Show for Oregon Trail El Cons Coop, Inc?

Tariff rank, outage reliability metrics, and 2026 Post-25D solar payback figures for Oregon Trail El Cons Coop, Inc in Oregon.

Lowest Rate #235 / 1,989

### 10.97 c/kWh (-4.49 vs OR)

Commercial avg: 9.03 c/kWh; Industrial: 6.56 c/kWh; est. residential bill $109.83/mo.

State Reliability Context

### 302.4 min/yr (OR Avg)

Utility did not file separate IEEE SAIDI in 2025; Oregon customer-weighted SAIDI is 302.4 min/yr.

Post-25D Payback

### 19.9 Years @ 10.97 c/kWh

8 kW cash system ($23,600 at $2.95/W, 0% 25D) offsets ~$1,185/yr at 1,350 kWh/kW.

Distributed PV

### 130 Net-Metered Systems

0.803 MW residential PV (0.5% of customers) across 4 counties; state FEMA declarations (2015-2026): 84.

Oregon Trail El Cons Coop, Inc Reliability & Solar Offset Calculation

Backup_Energy = (120.0 min / 60) * 1.8 kW = 3.6 kWh/event | Solar_Offset = 10,800 kWh * $0.1097 = $1,185/yr

EIA-861 2025 Utility ID 14109: Rate=10.97 c/kWh, Cust=25,995, PV=130.

**Result:** 19.9 yr 8 kW cash payback at 10.97 c/kWh (0% 25D).

## What Are the EIA-861 Filing Metrics for Oregon Trail El Cons Coop, Inc?

Verified customer accounts, residential and commercial tariffs, and net-metering totals filed by Oregon Trail El Cons Coop, Inc.

Form EIA-861 2025 filing metrics for Oregon Trail El Cons Coop, Inc (Utility ID 14109).

| EIA Utility ID & BA Code | ID 14109 · BPAT |
|---|---|
| State & Ownership Type | OR · Cooperative |
| Retail Electricity Rates | 10.97 c/kWh Res · 9.03 c Comm · 6.56 c Ind |
| Avg Monthly Usage & Bill | 1,001.4 kWh/mo ($109.83/mo est.) |
| Residential Net-Metered PV | 130 systems (0.803 MW) |
| Counties Served (Sample) | 4 counties (Baker, Grant, Harney, Union) |

## Which Peer Electric Utilities Operate in OR?

Nearby Oregon electric utilities of comparable customer size led by City of Springfield - (OR) (8.39 c/kWh). All figures trace directly to published federal energy filings, state electrical boards, CEC datasheets, and NFPA 70 NEC tables.

In-state EIA-861 peers ranked by customer base.

| Utility | Res Rate | SAIDI | Res PV | Customers |
|---|---|---|---|---|
| [**City of Springfield - (OR)**](https://epri-peac.com/utilities/or-city-of-springfield-or-17839/) | 8.39 c | 39.9 min | 123 | 30,212 |
| [**Tillamook Peoples Utility Dist**](https://epri-peac.com/utilities/or-tillamook-peoples-utility-dist-18917/) | 12.66 c | — | 91 | 20,263 |
| [**Emerald People's Utility Dist**](https://epri-peac.com/utilities/or-emerald-people-s-utility-dist-40437/) | 11.54 c | — | 262 | 19,946 |
| [**Consumers Power, Inc**](https://epri-peac.com/utilities/or-consumers-power-inc-4743/) | 13.9 c | 738.9 min | 678 | 18,921 |

What to Check & Best-Fit Scenarios

## What Should Oregon Trail El Cons Coop, Inc Customers Check Beyond Historical EIA-861 Averages?

Form EIA-861 data for Oregon Trail El Cons Coop, Inc (Cooperative, OR) summarizes annual utility filings—confirm active rate riders and feeder reliability at your meter.

- Tariff structure differs: Oregon Trail El Cons Coop, Inc's 10.97 c/kWh blended residential rate in OR does not isolate peak TOU windows or fixed customer fees.
- Feeder variation: Oregon Trail El Cons Coop, Inc system-wide SAIDI averages rural and urban circuits across its OR territory or nearby City of Springfield - (OR).

### Oregon Trail El Cons Coop, Inc Solar & Battery Evaluators

Compare your actual Oregon Trail El Cons Coop, Inc monthly kWh statement against 10.97 c/kWh and verify current export tariffs in OR.

### Oregon Trail El Cons Coop, Inc Outage & Generator Planners

Use Oregon Trail El Cons Coop, Inc's SAIDI history alongside NEC 705.12 120% busbar checks when sizing backup storage or transfer switches.

## Which Homeowner Electrical & Solar Questions Come Up Most Often?

Answers for Oregon Trail El Cons Coop, Inc (Oregon) customers grounded in 2025 Form EIA-861 filings and NEC 705.12 rules.

### What is Oregon Trail El Cons Coop, Inc's residential electricity rate and 2026 solar payback?

Oregon Trail El Cons Coop, Inc averages 10.97 c/kWh (-4.49 c/kWh vs Oregon average vs. Oregon). At 0% federal 25D credit in 2026, an 8 kW cash array offsets ~$1,185/yr (19.9-year payback).

### How reliable is Oregon Trail El Cons Coop, Inc compared to peer Oregon utilities?

Oregon Trail El Cons Coop, Inc did not file standalone IEEE SAIDI metrics in 2025 EIA-861 (state customer-weighted SAIDI is 302.4 min/yr); compare rates and outage history directly with City of Springfield - (OR) (8.39 c/kWh) across Oregon.

### Which counties and customers does Oregon Trail El Cons Coop, Inc serve in Oregon?

EIA-861 filings list 25,995 customers across 4 counties including Baker, Grant, Harney, with 130 net-metered residential solar installations. Review current municipal Authority Having Jurisdiction (AHJ) code amendments affecting Oregon Trail El Cons Coop, Inc.

## Related Pages

Explore Oregon energy benchmarks, City of Springfield - (OR), county outage profiles, and NEC 705.12 tools alongside Oregon Trail El Cons Coop, Inc.

[Oregon State Energy Rates & Utilities](https://epri-peac.com/states/oregon/) [All Oregon County Power & Outage Profiles](https://epri-peac.com/counties/oregon/) [Check Solar 120% Busbar Rule (NEC 705.12)](https://epri-peac.com/tools/solar-busbar-120/) [All Indexed US Electric Utilities](https://epri-peac.com/utilities/)

## Sources

1. [Annual Electric Power Industry Report, Form EIA-861 (Reliability, Sales, Net Metering, Average Bill, Service Territory)](https://www.eia.gov/electricity/data/eia861/) — U.S. Energy Information Administration (EIA), 2025 Release (f8612025) (retrieved 2026-11-23)
2. [NFPA 70 National Electrical Code (Section Numbers & Standard Engineering Tables Only)](https://www.nfpa.org/codes-and-standards/nfpa-70-standard-development/70) — National Fire Protection Association (NFPA), 2020 / 2023 / 2026 Editions (retrieved 2026-11-23)
3. [Residential Clean Energy Credit (IRC Section 25D — Terminated After Dec. 31, 2025)](https://www.irs.gov/credits-deductions/residential-clean-energy-credit) — Internal Revenue Service (IRS), 2026 Guidance (P.L. 119-21) (retrieved 2026-11-23)

Solar & Backup Calculators

Evaluate 60 A hybrid battery ESS backfeed limits (NEC 705.12) and 2026 solar payback using 10.97 c/kWh rates.
[Check 120% Busbar Rule](https://epri-peac.com/tools/solar-busbar-120/) [View Battery & Generator Specs](https://epri-peac.com/ev-chargers/)